El Sewedy Electric Company · EGX:SWDY

El Sewedy Electric — H1 2017 Earnings Presentation

36 slides from El Sewedy Electric's earnings presentation, 2017

  1. Slide 1: Investor Presentation Half-Year 2017

    Investor Presentation Half-Year 2017

  2. Slide 2: Disclaimer

    Disclaimer Certain information contained in this document consists of forward-looking statements reflecting the current view of the Company with respect to future events and are subject to certain risks, uncertainties and assumptions. Many factors could cause the actual results, performance or achie

  3. Slide 3: Agenda

    AGENDA I. An Integrated Energy Solutions Company II. Investment Highlights • Full Service Integration • Long Track Record • Strong Geographical Presence • State-of-the-art Facilities • Experienced Leadership • Prestigious Client Base III. Business Line Review IV. Recent Financial Performance V. Corp

  4. Slide 4: An Integrated Energy Solutions Company

    An Integrated Energy Solutions Company Elsewedy Electric is an energy player structured to face the challenges of the world’s fastest growing markets and the complexity of the critical electricity industry. From its start, deep product and sector specialization and unprecedented insight into local m

  5. Slide 5: Full-Service Integration

    Full-Service Integration Elsewedy Electric is a fully integrated energy solutions provider: From raw materials such as metals and plastics to inputs across the spectrum of wires, cables and electrical products, to contracting and turnkey infrastructure projects and electricity generation. Elsewedy E

  6. Slide 6: Summary of Main Financial & Performance Indicators

    Summary of Main Financial & Performance Indicators Total Revenue (EGP bn) Revenue by Segment – H1 17 EGP 20,655 mn 2% H1-17 Revenues 24.6 2% ▲96% y-o-y 7% 20.7 Wire & Cables 15.1 17.0 18.9 50% Turnkey Meters EGP 3,010.4 mn 10.6 39% Transformers H1-17 NP Electrical Products ▲85% y-o-y 2013 2014 2015

  7. Slide 7: Investment Highlights

    Investment Highlights

  8. Slide 8: Fully Integrated Energy Solutions Provider

    Fully Integrated Energy Solutions Provider Elsewedy Electric’s integrated energy solutions provide a full range of offerings to produce, distribute, manage and safely use electrical power Integration across the value chain supports Fast track Quality Cost leadership Brand advantages Ability to offer

  9. Slide 9: Long Track Record (1/2)

    Long Track Record (1/2) The Elsewedy Electric name has existed in the market since 1938 as a distributer of electrical equipment, becoming Egypt’s first specialized cables distributor by 1960 and Egypt’s first private manufacturer of cables with the establishment of a production plant in 1984. Over

  10. Slide 10: Long Track Record (2/2)

    Long Track Record (2/2) Elsewedy Electric has developed a strong track record in the execution of fast-track projects across Africa. The Group has repeatedly demonstrated its ability to secure high profile contracts both domestically and regionally with local governments Recent Notable Projects EPC

  11. Slide 11: Strong Geographical Presence & Deep Market Insight

    Strong Geographical Presence & Deep Market Insight Today, Elsewedy Electric is a global integrated cables and electrical products manufacturer and a turnkey services provider with more than 12,000 employees working at 25 production facilities in 9 countries Our Domestic Advantage Domestic recognitio

  12. Slide 12: State-of-the-art Facilities Utilizing Advanced Technology

    State-of-the-art Facilities Utilizing Advanced Technology Advanced technology acquisition and development places Elsewedy Electric at the forefront of world electricity trends, positioning the group to supply the most cost effective, clean technology to regional developing nations. Group- wide shari

  13. Slide 13: Experienced & Dynamic Leadership

    Experienced & Dynamic Leadership Management Pillars of Success Elsewedy Electric’s management structure facilitates quick decision-making and the careful monitoring of developments around the world. The Group ensures that the highest level of management remains in touch with its core activities Effi

  14. Slide 14: Prestigious Client Base

    Prestigious Client Base Elsewedy Electric boasts an impressive list of both global and regional clients spanning Energy, Telecom, Technology and other industries. The repeat business of large regional government entities and global industry giants is testament to the exceptional quality, speed and s

  15. Slide 15: Business Line Review

    Business Line Review

  16. Slide 16: Business Line Review: Wires & Cables

    Business Line Review: Wires & Cables Capacity Build-up (000 tons) Project Range Comprehensive range of cabling solutions for residential, industrial, 10 commercial and energy sectors 30 274 40 39 Power Special Fiber Optic Winding Raw Cables Cables Cables Wires Materials 156 Capacity less than 2016 P

  17. Slide 17: Business Line Review: Turnkey Solutions

    Business Line Review: Turnkey Solutions Revenue (EGP mn) Project Range Elsewedy Electric’s Turnkey Solutions segment delivers electricity generating assets and transmission and distribution (T&D) networks 9.5 on an EPC basis. 8.0 6.4 Electricity Power Construction & Telecom Transmission & Generation

  18. Slide 18: Business Line Review: Turnkey Solutions

    Business Line Review: Turnkey Solutions Division | 1 Division | 2 Division | 3 Division | 4 Division | 5 Power Generation Power Transmission & Construction & Infrastructure Projects Development & Telecom Solutions Distribution Renewable Energy Considered one of the emerging EPC Elsewedy Electric T&D

  19. Slide 19: Business Line Review: Transformers

    Business Line Review: Transformers Capacity Build-up (MVA) Product Range Elsewedy Electric produces a full range of low, medium and high voltage transformers -- including power and distribution (step up and step down) 8,050 transformers 400 450 Power Installation & Cast Resin Dry Oil Immersed Transf

  20. Slide 20: Business Line Review: Meters

    Business Line Review: Meters Revenue (EGP mn) Product Range The acquisition of Iskraemco establishes a global metering and measurement giant with the technological strength to build tomorrow’s 1,395.5 smart products 1,071.5 902.0 730.0 Induction Residential Industrial Smart Meters 626.9 Meters Meter

  21. Slide 21: Business Line Review: Electrical Products

    Business Line Review: Electrical Products Revenue (EGP mn) Project Range 441.2 Cable Accessories 371.9 Elastimold Egypt is cable accessories manufacturer 332.0 resulting from a joint venture with Elastimold USA 306.4 278.4 and Elsewedy SEDCO. Services range from engineering, design and correct acces

  22. Slide 22: Financial Performance

    Financial Performance

  23. Slide 23: Income Statement Highlights

    Income Statement Highlights Segmental Analysis Revenues Gross Profit 2% 1% 3% 2% 2% 4% 5% 5% 7% 4% 5% 8% 45% H1 2016 50% 32% H1 2017 H1 2016 H1 2017 26% 39% 59% 59% 42%  Wire & Cables  Turnkey Solutions  Meters  Transformers  Other Electrical Products ▲YoY Revenue ▲ Gross Profit Gross Profit Ma

  24. Slide 24: Income Statement Highlights

    Income Statement Highlights Total Revenue (EGP bn) Gross Profit (EGP bn) Gross Profit GP% 24% 23% 23% 24.6 20.7 16% 5.9 18.9 15% 17.0 14% 15.1 4.7 10.6 3.1 2.6 2.1 2.4 2013 2014 2015 2016 H1 2016 H1 2017 2013 2014 2015 2016 H1 2016 H1 2017 Revenues increased by 95.7% y-o-y to EGP 20,655.2 mn in H1 2

  25. Slide 25: Balance Sheet Highlights

    Balance Sheet Highlights CAPEX (EGP bn) Dividend Per Share (“DPS”) (EGP) CAPEX CAPEX/Sales Proposed H1 2017 dividend 2.3% 2.4% of EGP 8 per share 1.6% 1.6% 4 0.6 3 0.4 0.3 0.2 1 2013 2014 2015 2016 0 2013 2014 2015 2016 Despite the Group’s significant growth in revenue, Elsewedy Electric has maintai

  26. Slide 26: Consolidated Income Statement

    Consolidated Income Statement EGP Q2-2017 Q2-2016 Change H1-2017 H1-2016 Change Sales Wires & Cables 5,204,488,953 3,263,890,146 59% 10,388,597,968 6,228,040,725 67% Electrical Products 1,211,600,925 462,001,807 162% 2,263,692,580 937,292,578 142% Turnkey Projects 4,454,384,648 2,134,361,078 109% 8,

  27. Slide 27: Consolidated Balance Sheet

    Consolidated Balance Sheet EGP 31-12-16 31-03-17 30-06-17 Fixed Assets 4,358,661,645 4,532,986,896 4,621,992,447 Investments 1,276,350,446 1,388,384,558 1,052,783,777 Other long term Assets & Good will 277,204,873 339,049,973 319,075,537 Other Long Term Receivables 3,867,394,013 3,579,786,132 2,931,

  28. Slide 28: Stock Information

    Stock Information Ownership Structure SWDY.CA/SWDY.EY (30/06/17) Mr. Sadek Ahmed Sadek Elsewedy Issued Shares Share Price 23.37% 25.59% Mr. Ahmed Ahmed Sadek Elsewedy 218,418,000 Shares EGP 93.93 Mr. Mohamed Ahmed Sadek Elsewedy 8.94% Other Non-executive Family Members 25.58% Listing Venue Market Ca

  29. Slide 29: Corporate Social Responsibility

    Corporate Social Responsibility

  30. Slide 30: Corporate Social Responsibility

    Corporate Social Responsibility Elsewedy Electric aims to encourage and facilitate Egyptians to contribute positively to our society and create a sustainable business future. We recognize our responsibility for the social impact we have on communities, and our Corporate Social Responsibility program

  31. Slide 31: Corporate Social Responsibility

    Corporate Social Responsibility Select Education Initiatives Elsewedy Technical Academy In 2011, Elsewedy Electric established the Elsewedy Electric Technical School in partnership with the Ministry of Education (MOE). Elsewedy Electric Technical School aims to support technical school graduates and

  32. Slide 32: Health, Safety & Environment

    Health, Safety & Environment Elsewedy Electric | Investor Presentation H1 2017 32

  33. Slide 33: Health, Safety & Environment

    Health, Safety & Environment We believe that our employees are our most important asset. The safety of our employees, subcontractors and stakeholders is our highest priority. We strive to create and maintain a safe operating culture by prioritizing safety in everything we do. We believe in earning t

  34. Slide 34: Elsewedy Electric

    ELSEWEDY ELECTRIC —

  35. Slide 35: This slide is intentionally left blank

    This slide is intentionally left blank Elsewedy Electric | Investor Presentation H1 2017 35

  36. Slide 36: This slide is intentionally left blank

    This slide is intentionally left blank Elsewedy Electric | Investor Presentation H1 2017 36

Elsewedy Electric — H1 2017 Earnings Presentation on 6ix