Surefire Resources Nl · ASX:SRN

Surefire Resources Nl — IMARC Conference & Expo 2023

18 slides from Surefire Resources Nl's conference presentation, Oct 31, 2023

  1. Slide 1: Surefire Resources Corporate Presentation

    31 October 2023 SUREFIRE RESOURCES CORPORATE PRESENTATION International Mining and Resources Conference and EXPO, Sydney, Australia. Australian mineral exploration company Surefire Resources NL (ASX: SRN) (“SRN” or the For personal use only “Company”) is pleased to advise that it has released a pres

  2. Slide 2: The World Class Victory Bore Vanadium Project

    For personal use only THE VICTORY THE WORLD CLASS VICTORY BORE VANADIUM BORE PROJECT PROJECT IMARC Conference & Expo, Sydney, Australia 31 October – 2 November 2023

  3. Slide 3: Important Information

    The information in this report that relates to Exploration results is based on information compiled by Mr Marcus Flis who is a Fellow of the Australian Institute of Geoscientists. Mr Flis is an independent Principal Consultant at Rountree Pty Ltd. Mr Flis has sufficient experience that is relevant t

  4. Slide 4: Developing One of Australia's Largest Critical Mineral Deposits

    DEVELOPING ONE OF AUSTRALIA’S LARGEST CRITICAL MINERAL DEPOSITS

  5. Slide 5: For personal use only

    For personal use only

  6. Slide 6: Experienced Board

    FOr personal use only EXPERIENCED BOARD MANAGING DIRECTOR Mr Burton is an experienced corporate resource executive and geologist and mineral economist with over 30 years of industry experience, exploration, feasibility studies and business development. Paul has a B.Sc in Geology from Plymouth, UK, a

  7. Slide 7: Capital Structure

    For personal use only CAPITAL STRUCTURE Fully paid ordinary shares 1,654,934,906 Unlisted partly paid shares (Subject to Calls $0.027) 188,785,323 Unlisted partly paid shares (Subject to Calls $0.0059) 70,000,000 Share price $0.015 Market Capitalisation $25M Board and Management 17%

  8. Slide 8: Surefire Resources Summary

    _ SUREFIRE RESOURCES SUMMARY c = SUREFIRE HAS 3 HIGH VALUE SIGNIFICANT PROJECTS © WITH COMMODITIES IN DEMAND AND IN FOCUS VICTORY BORE VANADIUM PROJECT 321Mt ' @>0.4% V,O, (concentrate grade of 1.43% V,0,) 37Mt @ 23% AI,O, Exploration Target of 682 Mt to 1,190 Mt @ 0.2% to 0.43% V0, The potential qu

  9. Slide 9: For personal use only

    Ss - —5 aN a : 2 a = Z (i ¥ % : 7S ; a. - ~ se

  10. Slide 10: Mineral Resources

    For personal use on MINERAL RESOURCES SS JORC RESOURCES VANADIUM TONNES AND GRADE Victory Bore Measured 16.8 Mt @ 0.42% V,0, Victory Bore Indicated 70.3 Mt @ 0.40% V,O, Victory Bore Inferred 147.7 Mt @ 0.38% V,O, Total 234.8 Mt @ 0.39% V,O, Unaly Hill Inferred 86.2 Mt @ 0.42% V,O, Project Total: * 3

  11. Slide 11: Victory Bore

    For personal use only VICTORY BORE MAIN RESOURCE COMPRISES TWO THICK LODES OF VANADIFEROUS MAGNETITE ~50M WIDTH, OPEN AT DEPTH > 160M AND STRIKE OF >10KM Secondary resource comprises one thick lode of high grade aluminium oxide, 50m wide, open at depth. Testwork has shown this Al,O, product can be a

  12. Slide 12: Substantial VRB Storage Battery Market Forecast

    SUBSTANTIAL VRB STORAGE BATTERY MARKET FORECAST FOCUS IS VANADIUM BATTERY STORAGE + Higher energy density + Long life: over 20 years + Over 20,000 recharge cycles with no degradation + No damage if under or overcharged + Not combustible + 100% discharge capability + Ideal for large scale application

  13. Slide 13: High Purity Alumina - HPA

    For personal use only HIGH PURITY ALUMINA-HPA THE PREDICTED NEW MARKETS FOR HPA ARE SIGNIFICANT AND INCLUDE:* - 4N (99.99%) Al,0, PRODUCED FROM VICTORY BORE MATERIAL © FUIRTTAIER TEST WORK UNDERWAY + LED REPLACEMENT LIGHTING + CO2 EMISSION SEPARATORS * HPA CURRENTLY SELLS FOR >$20,000 USD / TONNE +

  14. Slide 14: The Development Plan

    For personal use only THE DEVELOPMENT PLAN | ON SHORE MAGNETITE PRODUCTION. CONCENTRATE SHIPPED FOR DOWNSTREAM PROCESSING. OFF SHORE PROCESSING IN SAUDI ARABIA. + Memorandum of + The KSA is a significant Understanding (MOU) with user of vanadium products, the Kingdom of Saudi Arabia. particularly in

  15. Slide 15: Proposed Pathway for Victory Bore Project Development

    PROPOSED PATHWAY FOR VICTORY = BORE PROJECT DEVELOPMENT MINING BENEFICIATION EXTRACTION TRANSPORT SHIPPING PROCESSING Victory Bore Vanadium Magnetite production Magnetite separated Magnetite Transported Shipped to Magnetite processed Magnetite mined from Victory Bore deposit and loaded and Loaded at

  16. Slide 16: Next Steps

    NEXT STEPS + Completion of pre-feasibility study + Progress Saudi processing option * Completion of V,O, extraction direct (HPV) for producing VE + Progress with VRB strategy + Offtake discussions commenced + HPA 4n 99.995 confirmed — next steps scoping study

  17. Slide 17: Investment

    INVESTMENT DEVELOPING ONE OF AUSTRALIA’S LARGEST VANADYUM DEPOSITS HIGH GRAD HUGE RESOURCE POINTS BATTERY GRADE VANADIUM AND HPA 100% OWNED 400KM FROM PORT GOOD EXISTING INFRASTRUCTURE INCLUDING GAS PROJECTS VALUE NOT CURRENTLY REFLECTED IN Srane P| GE

  18. Slide 18: Paul Burton, Managing Director

    For personal use only PAUL BURTON NAGING DIRECTOR Surefire Resources NL Suite 10, 100 Mill Point Road, South Perth WA 6151 info@surefireresources.com.au www.surefireresources.com.au

Surefire Resources NL — IMARC Conference & Expo 2023 on 6ix