  1. Slide 1: Fitzroy Resources Ltd - Base Metal Exploration in QLD

    1 February 2011 FITZROY RESOURCES Ltd Base Metal Exploration in QLD

  2. Slide 2: Disclaimer

    2 Disclaimer Certain statements contained in this presentation, including information as to the future financial or operating performance of Fitzroy Resources Ltd and its projects, are forward-looking statements. Such forward-looking statements: May include, among other things, statements regarding

  3. Slide 3: Board and Capital Structure

    3 Board and Capital Structure Capital Structure – February 2011 Corporate Shares On Issue: 41 million Unlisted Options: 11 million exercisable @ $0.30c (by Dec ’13 and Dec ‘15) Market Capitalisation: A$9.6 million (@23.5cps) Cash: A$4.8 million Top 20 Shareholders: 50.5% Board of Directors Will Dix

  4. Slide 4: History: The Story So Far

    4 History The Story So Far August 2010 – Incorporation and seed capital raising September 2010 – Signed SPA with Icon Resources for VHMS Projects in Queensland December 2010 – Successful $5M IPO capital raising & listing on ASX January 2011 – Acquisition of additional tenement at Rookwood from Kanga

  5. Slide 5: Projects: Two Projects - Rookwood and Glentanna

    5 Projects Two Projects - Rookwood and GlentannaProjects Develin Creek Resource* Major towns Railway Power lines Port Regional VHMS endowment Mt Chalmers 1.2Mt @ 2% Cu, 3.5g/t Au, 20g/t Ag Mt Morgan 50Mt @0.7% Cu,4.8 g/t *Develin Creek Inferred JORC Resource - 1.757Mt @ 1.71% Cu, 2.05% Zn, 8.5 g/t A

  6. Slide 6: Rookwood Project

    6 Rookwood Project Prospective for VHMS-style Cu-Au-Zn Rookwood mineralisation in an under explored terrane. Tertiary cover immediately adjacent to 1.75Mt resource is unexplored by both effective geophysics and drilling Absence of any regional geophysics away from the northern part of the tenement C

  7. Slide 7: Rookwood Project: opportunity

    7 Rookwood Project No modern (post 1995) geophysics and very OPPORTUNITY little EM at all away from the vicinity of Rookwood the resource Unresolved EM conductor at Tarantula Absence of effective downhole EM on any of the drilling Limited surface geochemistry – only stream sediments Untested multi-e

  8. Slide 8: Exploration program for Rookwood and Glentanna

    8 3 month exploration program Rookwood Wide reaching HELITEMTM survey to cover prospective stratigraphy and identify buried massive sulphide bodies Diamond drilling on the edge of the Develin Creek Resource to test extensions and provide a platform for downhole EM Regional surface geochemistry (ongo

  9. Slide 9: Rookwood HELITEM

    9 Rookwood HELITEMTM Most powerful airborne EM system available Incredible advancement over the last 5 years Very low signal to noise ratios – clean data High powered enables a greater depth penetration Rapid coverage – entire survey < 10 days Effectively a huge airborne metal detector

  10. Slide 10: Rookwood HELITEM: 2800 line km program

    10 Rookwood HELITEMTM 2800 line km program commencing March 1st 2011 Program will cover all the known prospective Rookwood volcanics on the tenements Previous petrophysics shows the massive sulphide at Develin Creek is highly conductive Expectation is similar sulphide bodies away from the current re

  11. Slide 11: Develin Creek Drilling

    11 Develin Creek Drilling Develin Creek Drilling and EM OPPORTUNITY Develin Creek The Resource (1.75Mt @ 1.7% Cu 2% Zn, 0.3g/t Au 8.5g/t Ag) 1 Km 3 lodes make up the 1.75Mt Major footwall alteration zone

  12. Slide 12: Develin Creek DHEM

    12 Develin Creek DHEM Develin Creek Drilling and EM OPPORTUNITY Develin Creek The Resource (1.75Mt @ 1.7% Cu 2% Zn, 0.3g/t Au 8.5g/t Ag) 1 Km 3 lodes make up the 1.75Mt Major footwall alteration zone DHEM target area

  13. Slide 13: Surface Geochemistry

    13 Surface Geochemistry 2800 l/Km program commencing March 1st 2011 Program will cover all the known prospective Rookwood volcanics on the tenements Previous petrophysics shows the massive sulphide at Develin Creek is highly conductive Expectation is that similar sulphide bodies away from the curren

  14. Slide 14: Glentanna Project

    14 Glentanna Project OPPORTUNITY No geophysics or drilling since 1978 Glentanna Drill hole at Grieves Quarry intersected 12.3m @ 1.2%Cu and 8.9%Zn – NO FOLLOW UP No downhole EM on any of the drilling All drillcore available for re-assay Old workings along the Silverwood Cu trend. Fixed loop EM to co

  15. Slide 15: CP Statements - Competent Persons

    15 CP Statements Competent The information in this presentation that relates to Exploration Results is based on information compiled by Mr William Dix who is a Member of the Australasian Institute of Mining and Metallurgy. Mr Dix is a full time employee of Persons Fitzroy. Mr Dix has sufficient expe