Slide 1: Obuasi Gold Mine - Underground Production
ASHANTI Goldfields Company Ltd U/G Tonnes Millions 0.0 0.5 1.0 1.5 2.0 2.5 1986 3.0 1987 1988 1989 1990 1991 1992 1993 1994 1995 Obuasi Gold Mine - Ghana 1996 1997 Year 1998 1999 u/g Head Grade (g/t) 2000 2001 u/g 2002 2003 2004 Underground Production 2004 2005 2006 2007 Underground Production - Yea
Slide 2: Underground Productivity
Obuasi Gold Mine - Ghana Underground Productivity Underground Productivity Ounces/Manmonth Tonnes/Manmonth ASHANTI Goldfields Company Ltd 60 15 50 40 10 Tonnes/Manmonth Ounces/Manmonth 30 20 5 10 0 0 1996 1997 1998 1999 2000 2001 2002 2003
Slide 3: U/G Production Profile
Obuasi Gold Mine - Ghana U/G Production Profile Obuasi Underground - % change (Mining Methods) 1995-2003 ASHANTI Goldfields Company Ltd % Production Tonnes 100% 80% sublevel prep Vamping 60% Square Set Stope Prep. 40% Pillar Extr. Reclamation Con. C&F. 20% Mech C& F. Sublevel 0% Open Stope 2001 2002
Slide 4: Long Range Plan
Long Range Plan
Slide 5: U/G Long Term Production Estimate
Obuasi Gold Mine - Ghana U/G Long Term Production Estimate Obuasi Mine 2003 LRP The tonnage from above 50 3.000 Level, steadily reduces over time. Deeps Phase I is able to ASHANTI Goldfields Company Ltd 2.500 2.000 maintain an overall 2.4 mtpa Ore Tonnes Phase II Deeps rate. Phase II Deeps is foreca
Slide 6: Processing
ASHANTI Goldfields Company Ltd Processing
Slide 7: Processing
Obuasi Gold Mine - Ghana Processing SULPHIDE TREATMENT PLANT Material Source- Underground and Surface sulphide ASHANTI Goldfields Company Ltd Capacity - 2.6 million tonnes per annum OXIDE TREATMENT PLANT Material Source- Surface Oxide Capacity – 2.2 million tonnes p/a TAILINGS TREATMENT PLANT
Slide 8: Capital Projects
ASHANTI Goldfields Company Ltd Capital Projects
Slide 9: Underground Projects
Obuasi Gold Mine - Ghana Underground Projects Connection of Sansu Ramp to u/g workings (Block 8/BSVS) ASHANTI Goldfields Company Ltd Sansu – Surface Fill Raise Hydrafill Reticulation to Sansu Deeps Project BSVS Equipping Material transfer from North to 41 Level Haulage drive De-Commiss
Slide 10: Obuasi Mine Geology & Deeps Exploration
OBUASI MINE GEOLOGY & DEEPS EXPLORATION
Slide 11: AGC Ltd. - Obuasi Operations Ground Holdings
AGC LTD. - OBUASI OPERATIONS GROUND HOLDINGS Homase Concession Homase AY ILW RA A AN GH LEGEND Roads Obuasi Railway Concession Pits OBUASI SCALE 0 6000 Metres Kubi Kubi Ayanfuri Concession DUNKWA Concession AYANFURI
Slide 12: Legend
OBUAST Kwasi Hensah t FISSURE) Shaft 77 ali Timber Adansi Shake Shaft = Sor Ww J, Sonsu ae A —— j Shaft —_F —~ASHoNTy . 7 SPI pS %,< DBAS FISSUpp . PE CTE DR Fis, Legend GCS SURE 1 SCALE 75° = Fissure ee a | Auriferous reef D aa LOCA SIRES ‘Dyke’ — Metaovolconic Mineralized Dyke
Slide 13: Section Through Adansi Shaft
SECTION THROUGH ADANSI SHAFT ADANSI SHAFT 100m OXIDISED ZONE OBUASI FISSURE INSINTSIAM REEF 8 COTE D'OR 0 FISSURE ASHANTI 12 FISSURE -100m 16 20 KE -200m 22 DY E UR 26 ISS Scale F -300m EEF E.T.S. 0 100Metres ORE BODY IN R 30 folded MA S.V.S. phyllite -400m ORE BODY and LEGEND siltstone granulated A