Graphene Manufacturing Group Ltd · TSXV:GMG
Graphene Manufacturing — Investor Presentation (April 2024)
24 slides from Graphene Manufacturing's investor presentation, April 2024

Slide 1: Energy Saving and Energy Storage Solutions
ENERGY SAVING AND ENERGY STORAGE SOLUTIONS www.graphenemg.com | TSX-V:GMG April 2024

Slide 2: Disclaimer
DISCLAIMER The information contained within this presentation has been prepared by Graphene Manufacturing Group Ltd. (“GMG” or the develop its products will not be adversely impacted by COVID-19 or the ongoing conflict in eastern Europe. Additionally, forward- “Company”) as of February 13, 2023 and

Slide 3: Board of Directors & Advisory Team
BOARD OF DIRECTORS & ADVISORY TEAM Craig Nicol | Founder, Managing Director & CEO Bob Galyen | Non-Executive Director Craig Nicol has a career of over 20 years in delivering large scale innovation including leading multi- Bob is a highly experienced executive in the battery energy storage world and

Slide 4: We Develop, Make and Sell
WE DEVELOP, MAKE AND SELL: All of which are based on Graphene, we produce from Natural Gas. THERMAL-XR® ® LUBRICANT GRAPHENE ALUMINIUM-ION BATTERY $28B* $15B* $108B* USD USD USD HEAT EXCHANGER AUTOMOTIVE ENERGY STORAGE COATINGS SYSTEM FLUIDS ADDITIVES BATTERY Deployed Deployed Development Heat Trans

Slide 5: Growth Plan for GMG Production Capacity
GROWTH PLAN* FOR GMG PRODUCTION CAPACITY HEAT EXCHANGER 1 Million Litres NATURAL GAS COATING p.a. Coating Blending Plant Operational. (<2% graphene) GRAPHENE MANUFACTURING PLANT G® LUBRICANT 1 Million Litres Lubricants Blending Plant p.a. (< 1% graphene) 2024 |Planned 10 Tonne p.a. Installation.* 20

Slide 6: GMG Commissions Modular Graphene Production Plant | Phase 1.0
GMG COMMISSIONS MODULAR GRAPHENE PRODUCTION PLANT | PHASE 1.0 • Innovative natural gas to graphene production. • Modular plant designed and built for growth and replication. “We are very excited …. it is a significant milestone for the company. It uses GMG’s self-developed technology, which creates

Slide 7: Growth Plan for GMG Production Capacity (Richlands, Brisbane)
GROWTH PLAN* FOR GMG PRODUCTION CAPACITY RICHLANDS, BRISBANE, AUSTRALIA THERMAL-XR® Battery Development Blending Plant Centre & HQ Office (operational) (operational) Automated Battery Modular Graphene Pilot Plant Plant 5 2024 Planned Build* 10 Tonne p.a. 4 Local government development 2023 | Phase 1

Slide 8: THERMAL-XR HVAC-R Distributor Network - Growing
THERMAL-XR® HVAC-R DISTRIBUTOR NETWORK - GROWING Europe South Korea Canada, USA, North America Japan Mexico, Caribbean Egypt India Thailand Singapore Australia THERMAL-XR®HVAC-R Assessing Indonesia Negotiating Signed THERMAL-XR® INDUSTRIAL Markets available for business development. 8 | Build Revenu

Slide 9: Driving B2B Sales THERMAL-XR
DRIVING B2B SALES THERMAL-XR® INDUSTRY & MARKET SEGMENTS CUSTOMER PROJECTS (IN USE AND PROSPECTIVE) DATA CENTRE RAIL HVAC-R (BUILDING) 16% ENERGY /TRANSPORT SAVINGS FUEL SAVINGS RAIL/TRANSPORT DATA CENTRES HVAC-R LNG ENERGY 16% SAVINGS PERFORMANCE IMPROVEMENT LNG, GAS & PETROCHEMICALS CHEMICAL, HEAV

Slide 10: Independently Verified HVAC-R Energy Savings
INDEPENDENTLY VERIFIED HVAC-R ENERGY SAVINGS NEW CONDENSER COIL PRE & POST COATING COMPARISON Measured Energy Savings for THERMAL-XR® Pull-Down Test 15.9%▼ Precoated 48 Hour Temperature 4.69%▼ Cycle Test 4.3kw Refrigeration Unit with an electronic expansion valve with variability disabled. THERMAL X

Slide 11: Lubricant Performance
LUBRICANT PERFORMANCE Deposition of graphene particles via G® ENERGY SAVINGS test results up to 10%. LUBRICANT lowers the coefficient of friction in the Coefficient of Friction reduction up to 10%. critical boundary lubrication zones (pistons) Wear Preventative Test results have experienced More tha

Slide 12: Joint Development Agreement
JOINT DEVELOPMENT AGREEMENT Accelerated Technical & Commercial Environmental Development Operational Social & & Application Governance Graphene Heavy mobile A$6 Million to GMG Net zero transition Aluminium-Ion equipment & grid with actions to Battery energy storage Preferential Access decarbonisatio

Slide 13: Pouch Cell Prototype Scale-Up Process Plan
POUCH CELL PROTOTYPE SCALE-UP PROCESS PLAN GMG Progress and Plan ~500 mAh Tested 1000 mAh “A Type Cell” July 2023 H1 2024 H1 2025 Initial ~1000 mAh Feb 2024 CUSTOMER TESTING Phase 3 | Scaling Output for Phase 1 | Proving the Science Phase 2 | Scaling Cell Size Demand Single Layer ~5 to 10 Layer >10

Slide 14: Next Generation Battery Performance
NEXT GENERATION BATTERY PERFORMANCE SHOWN BASED ON COIN CELL TESTING Power Density (W/kg) Energy Density (Wh/kg) Graphene Aluminium-Ion Potential Benefits: 9350 290 • Aluminium is 1000 times more available & ~10 times cheaper than Lithium 200 200 • No Lithium needed – lower cost & less 163 complicat

Slide 15: Battery Technology Readiness Level (BTRL)
GMG Progress BATTERY TECHNOLOGY READINESS LEVEL (BTRL) GMG is currently optimizing G+AI Battery has progressed electrochemical behaviour for to BTRL 4. pouch cells. Lab-Scale Production and Basic Component Production Process Cell Production Process Electrochemical Development Commercialisation Prope

Slide 16: Fast Charging and Cooling Advantages
FAST CHARGING AND COOLING ADVANTAGES GMG’s Graphene Aluminium-Ion Battery may not need a thermal management system when used in an electric vehicle battery pack or an energy storage system, which will lead to a simpler, more cost effective and higher energy density battery pack. The elimination of t

Slide 17: G+AI Battery Simplicity
G+AI BATTERY SIMPLICITY G+AI Battery’s simplicity is one of its most attractive and competitive advantages. Simplicity Drives Structural Advantages Over Battery Technology. No material coating on the Anode. Anode Aluminium Foil Voltage Use the same equipment to make the battery as a Li Battery Separ

Slide 18: Graphene Aluminium Ion Battery Advantages
GRAPHENE ALUMINIUM ION BATTERY ADVANTAGES Lithium Ion Battery Graphene Aluminum Battery Performance Ion Battery 1. Very Fast Charging/Discharging (60 times) 2. Long Life (>1000 full cycles) 3. Higher Cell to Pack Density (no cooling needed) Supply Chain 4. Supply Chain Simplicity (< 1 km vs 50,000 k

Slide 19: Battery Production Process
LOWER STRUCTURAL COST BATTERY PRODUCTION PROCESS The same equipment is used to make the G+AI Battery as the Lithium Ion Battery - except there are fewer needed. Lithium Ion Battery Graphene Aluminum Ion Battery Cathode Anode Cathode Anode The G+AI Anode is ONLY aluminium 1. Slurry Preparation foil a

Slide 20: Battery Cell Roadmap
BATTERY CELL ROADMAP • Commercial Scale Battery Plant Commissioned • 500 mAh Cell • Battery • Cell Testing Cells/Modules • Battery Pilot Plant “A” & “B” type cells supplied to for JDA Partners Customers • Commercial Sale Contracts Signed 2023 2024 2025 2026 2027+ • 1000 mAh Cell • Commercial Scale B

Slide 21: Development Roadmap
DEVELOPMENT ROADMAP G+AI BATTERY G®LUBRICANT THERMAL-XR® Graphene R&D + IP 2024 2025 2026 2027 + BUSINESS OBJECTIVES/PRODUCT STREAMS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 PRODUCE GRAPHENE Graphene Plant Phase 1.0 & IMPROVE/SCALE Graphene Plant Phase Phase 2.0 Progressively Commissioned PRODUCTION Regi

Slide 22: Maturing Financial Capability
MATURING FINANCIAL CAPABILITY BUILD DEVELOP PARTNER CASH ON HAND REVENUE Maturing sales and First leading segment Australian AU$ 3.6M marketing team, partner – Rio Tinto Government R&D Tax processes and JDA (AU$ 6M) Rebate Support (2023: (End of December systems. AU$ 2.6M) 2023) Exploring JDA’s with

Slide 23: GMG Finances & Structure
GMG FINANCES & STRUCTURE As at 31 December 2023 Ticker Shares Market Options Warrants, Investor Relations Outstanding Capitalization RSU info@fcir.ca TSX-V +647 – 689 – 6041 Toronto Stock www.focusir.ca Exchange Ventures 5,496,951 GMG 84,524,329 ~C$70 M 4,200,473 678,738 23 | TSX-V | GMG

Slide 24: Energy Saving and Energy Storage Solutions
ENERGY SAVING AND ENERGY STORAGE SOLUTIONS www.graphenemg.com | TSX-V:GMG
Source: Internet Archive copy of graphenemg.com
More decks from Graphene Manufacturing Group Ltd
Shareholder Meeting (November 2026)35 slides · Nov 17, 2026
Investor Presentation (October 2026)31 slides · Oct 1, 2026
Investor Presentation (July 2026)26 slides · July 2026
Investor Presentation (October 2025)25 slides · October 2025
Investor Presentation (July 2024)27 slides · July 2024
Investor Presentation (May 2024)27 slides · May 2024