Egdon Resources plc

Egdon Resources — H1 2022 Earnings Presentation

22 slides from Egdon Resources's earnings presentation, Apr 26, 2022

  1. Slide 1: Interim Results for the six months ended 31 January 2022 and Business Update

    Egdon Resources plc Interim Results for the six months ended 31 January 2022 and Business Update

  2. Slide 2: Egdon at a Glance

    Egdon at a Glance • AIM: EDR • Established UK- based energy company • Onshore UK focus • Step-change in production and revenues • Significant onshore/nearshore exploration and appraisal opportunities • Material shale gas position in Northern England • Developing Energy Transition opportunities – Geo

  3. Slide 3: Highlights

    Highlights “The period has been has been an exceptional one for the Company. Revenues have increased fivefold and this has resulted in a return to profit after the challenges of recent years. Significantly increased commodity prices and increased production have made this possible. The Wressle field

  4. Slide 4: Highlights

    Highlights • Production increased by 116% to 36,714 barrels of oil equivalent (“boe”) or 200 boe per day (“boepd”) (H1 2021: 16,928 boe and 92 boepd) • Wressle production has significantly exceeded the original expectation of 500 barrels of oil per day (“bopd”) and is currently producing at permit c

  5. Slide 5: Financials

    Financials 6 months ended 31 January 2022: • Revenues increased by 500% to £2.551 million (H1 2021: £0.424 million) • Profit before impairments/write backs of £0.715 million (H1 2021: loss of £0.763 million) • Profit of £1.222 million including £0.507 million Ceres write-back (H1 2021: loss of £1.03

  6. Slide 6: Subsequent Events

    Subsequent Events • 10 March 2022 - revised incentive package put in place through the cancellation of all historical share options and issue of new share options to all staff • 14 March 2022 - planning permission was refused for extension to North Kelsey-1 exploration well consent and will be appea

  7. Slide 7: Strategy

    Strategy Focus on growth in production and Maintain geographical Conventional revenue through conventional UK Focus production, appraisal and focus on the UK Oil & Gas exploration projects A near-term focus on developing low Maintain our significant carbon energy transition projects, portfolio of un

  8. Slide 8: Production - “Step-change in Revenues”

    Production - “Step-change in Revenues” • Production increased by 116% to 36,714 boe or 200 boepd (H1 2021: 16,928 boe and 92 boepd) • Revenues increased by 500% to £2.551 million (H1 2021: £0.424 million) • The average realised price per barrel of oil equivalent was 178% higher at $93.81/boe (H1 202

  9. Slide 9: Wressle – “Continuing to Exceed Expectations”

    Wressle – “Continuing to Exceed Expectations” Wressle (EDR 30%) • Exceeded our pre-production expectations of 500 bopd following the successful proppant-squeeze and coiled-tubing operation • Instantaneous rates of over 1000 bopd have been achieved • Early restrictions to production addressed by upgr

  10. Slide 10: Wressle – “Next Steps”

    Wressle – “Next Steps” Monetising the Gas and optimising production rates: • The likely preferred gas monetisation approach is export of gas via a short pipeline (c. 600m) into the local gas network • This will require regulatory consents (Planning and EA) with completion targeted for gas sales duri

  11. Slide 11: Ceres – “Late-Life Renaissance”

    Ceres– “Late-Life Renaissance ” Ceres (EDR 10%) • The Ceres gas field is undergoing a late-life renaissance contributing material revenues and cash flow • During the period, Ceres net production averaged 54 boepd with gas prices averaging 184 p/therm or $123.5/boe (H1 2021: 24p/therm or $29.2/boe) •

  12. Slide 12: Keddington – “Accessing remaining reserves”

    Keddington– “Accessing remaining reserves” Keddington (EDR: 45%) • Contributes tangible revenues • A subsurface review of the field has highlighted a viable target in the east of the field that could deliver 180,000 barrels of incremental production • With planning consent already in place, this pre

  13. Slide 13: Waddock Cross – “Redevelopment to increase production”

    Waddock Cross – “Redevelopment to increase production” Top Bridport Sandstone (Cycle 2) Depth Map (m TVDss) – showing WX-4z Trajectory Waddock Cross (EDR: 55%) • Shut-in Bridport Sandstone oil field (Dorset) • Significant Stock Tank Oil Initially in Place (STOIIP) volume of 57 mmbbls • New horizonta

  14. Slide 14: Cloughton – “Gas Discovery”

    Cloughton – “Gas Discovery” Cloughton (Egdon 40%) • Egdon has assumed the operatorship of PEDL343, increasing its interest to 40% • The NSTA has agreed an extension to the Licence to 20 March PEDL343 2024 along with an associated work programme P1929 • The licence contains the Cloughton tight gas di

  15. Slide 15: Biscathorpe & North Kelsey

    Biscathorpe & North Kelsey Biscathorpe (Egdon 35.8%) North Kelsey (PEDL241: Egdon 50%) • The Biscathorpe-2 side-track would target: • Prospect mapped from 3D seismic, with multiple • Dinantian Carbonate, where a 68 metre oil reservoir targets = Wressle analogue column was discovered in Biscathorpe-2

  16. Slide 16: Resolution – “Appraisal of Large Offshore Gas Discovery”

    Resolution – “Appraisal of Large Offshore Gas Discovery” Resolution & Endeavour Gas Discoveries (Egdon 100%*) • Resolution Gas Discovery (P1929) = Early North Sea discovery (Total: 1966) Pensacola Prospect to be • CPR (Schlumberger) assessed gross Mean Contingent drilled by Shell resources of 231 bc

  17. Slide 17: Shale Gas – “A strategically important national resource”

    Shale Gas – “A strategically important national resource ” • The Group holds a significant unconventional resources portfolio in Northern England, totalling 151,742 net acres (614km2 net) with independently (ERCE) estimated Mean volumes of undiscovered GIIP of 37.6 TCF (net) • Primary focus is the G

  18. Slide 18: Gainsborough Trough – “A World Class Resource”

    Gainsborough Trough – “A World Class Resource” • Basin characterised by simple structure and lack of extensive faulting • 429m of hydrocarbon bearing shales encountered within the primary target – Gainsborough Shale - Estimated Gas in Place of c. 640 bcf per square mile South-North schematic cross-s

  19. Slide 19: Energy Transition Opportunities

    Energy Transition Opportunities • The UK is committed by law to reaching “net zero” carbon emissions by 2050 • The Energy Transition presents a number of business challenges and opportunities • Egdon sees the potential for repurposing its fields, sites and wells for renewable purposes and using its

  20. Slide 20: Geothermal - “Heat as a Potential Business”

    Geothermal - “Heat as a Potential Business” • Geothermal energy projects can utilise Egdon’s core skills, knowledge, and operating experience • Our initial focus has been on the geothermal potential within our existing wells and fields. • Shut-in well at Dukes Wood is located in an area of anomalous

  21. Slide 21: Outlook

    Outlook • Production guidance for the full financial year 2021-22 is 240 boepd, with H2 2022 guided at 275-285 boepd • In the short-term, we will focus on the highlighted projects, whilst maintaining our substantial acreage position in the nascent shale-gas play and working to demonstrate that UK sh

  22. Slide 22: Disclaimer

    Disclaimer This document comprises the written materials/slides for a presentation (together with any accompanying information communicated verbally (including any questions and answers session and any material distributed with it), the Presentation) by Egdon Resources plc (the Company). This Presen

Egdon Resources — H1 2022 Earnings Presentation on 6ix