I-80 Gold Corp · TSX:IAU

I-80 Gold — Investor Presentation (October 2025)

44 slides from I-80 Gold's investor presentation, October 2025

  1. Slide 1: Creating a Nevada-Based, Mid-Tier Gold Producer

    MADE IN THE U.S.A. C R E AT I N G A N E V A D A - B A S E D , M I D -T I E R G O L D P RO D U C E R NYSE AMERICAN: IAUX | TSX: IAU October 2025

  2. Slide 2: Cautionary Disclaimer Regarding Forward-Looking Statements

    CAUTIONARY DISCLAIMER REGARDING FORWARD-LOOKING STATEMENTS Certain statements in this presentation constitute “forward-looking statements” or “forward-looking information” within the meaning of applicable securities laws, including but not limited to statements or information regarding: statements r

  3. Slide 3: Opportunity in a Tier 1 Mining Jurisdiction

    COMPANY OVERVIEW JERRITT CANYON** OPPORTUNITY IN A TIER 1 TWIN CREEKS** TURQUOISE RIDGE MIDAS MINING JURISDICTION GRANITE CREEK - Granite Creek Underground - Granite Creek Open Pit SOUTH ARTURO GOLDSTRIKE** LEEVILLE  Industry-leading pipeline of Nevada-based gold projects CARLIN** LONE TREE  Fourt

  4. Slide 4: Strong Resource Base with All Deposits Open for Expansion

    COMPANY OVERVIEW STRONG RESOURCE BASE WITH ALL DEPOSITS OPEN FOR EXPANSION Completed, ongoing, and planned infill drill programs over the next 24 months aim to convert Inferred resources to the Measured and Indicated category and to expand the total resource base. MINERAL RESOURCES DEFINED BY UNDERG

  5. Slide 5: Establishing a Scalable Multi-Asset Mid-Tier Gold Producer

    COMPANY OVERVIEW ESTABLISHING A SCALABLE MULTI-ASSET MID-TIER GOLD PRODUCER ANTICIPATED AVERAGE ANNUAL GOLD PRODUCTION(3)(4) PHASE 3 700 600koz+(3) 600 500 Gold Production (koz) PHASE 2 400 300koz – 400koz(3) 300 200 PHASE 1 150koz – 200koz(3) 100 0 2028E – 2029E 2030E – 2031E 2032E+ Granite Creek U

  6. Slide 6: Significant Value Embedded Across i-80 Gold's Asset Portfolio

    COMPANY OVERVIEW SIGNIFICANT VALUE EMBEDDED ACROSS i-80 GOLD’S ASSET PORTFOLIO Average Annual Project After-tax NPV(5%)(1) IRR Gold Production Production • PEA economics expected to $2,175/oz Au $3,000/oz Au $2,175/oz Au $3,000/oz Au Target Start Year improve with drilling ahead of (following ramp u

  7. Slide 7: Multi-Deposit Portfolio with Near-Term Production Growth

    COMPANY OVERVIEW MULTI-DEPOSIT PORTFOLIO WITH NEAR-TERM PRODUCTION GROWTH ANNUAL GOLD PRODUCTION OF 600,000+ OUNCES EXPECTED IN 2032 ANTICIPATED ANNUAL GOLD PRODUCTION*(3)(4) 900 Granite Creek Underground • Active infill drill programs aim to convert resources, and extend mine Gold Equivalent Ounces

  8. Slide 8: New Development Plan

    COMPANY OVERVIEW NEW DEVELOPMENT PLAN Latest & Upcoming 2025 2026 2027 2028 2029 2030 2031 2032 Economic Studies Granite Creek Toll Milling  Q1 2025 – PEA (update from 2021) PRODUCTION Underground  Q1 2026 – Feasibility Study Phase 1 Refractory Archimedes  Q1 2025 – PEA CONSTRUCTION Toll Milling

  9. Slide 9: Building Momentum with Recent Achievements

    COMPANY OVERVIEW BUILDING MOMENTUM WITH RECENT ACHIEVEMENTS Established a staged path advancing all five assets targeting New Development Plan ~600,000 oz in gold output in the early 2030s Completed PEAs For Filed Preliminary Economic Assessments defining total portfolio NPV(5) All Five Projects of

  10. Slide 10: Executing on Our Recapitalization Plan

    EXECUTING ON OUR RECAPITALIZATION PLAN 1 STRENGTHENED THE BALANCE SHEET TO FUND NEAR-TERM GROWTH 2 ADDRESS FURTHER RECAPITALIZATION PRIORITIES AND FUND LONG-TERM GROWTH • ~$200M raised through bought-deal and private • Targeting $350M - $400M in financing placements in 2025 • Repay upcoming converti

  11. Slide 11: Near-Term Catalysts

    NEAR-TERM CATALYSTS ARCHIMEDES UNDERGROUND  Initiate infill drilling – Q4 2025 (upper zone)/Q1 2026 (lower zone) FEASIBILITY STUDIES  Lone Tree autoclave refurbishment (Class 3 engineering) – Q4 2025  Granite Creek Underground – Q1 2026  Cove Underground – Q1 2026  Granite Creek Open Pit (pre-f

  12. Slide 12: Granite Creek Property

    GRANITE CREEK PROPERTY Turquoise Ridge Mine PROJECTS ON THE PROPERTY • Granite Creek Underground (ramp up phase) • Granite Creek Open Pit Turquoise Ridge Mine Located 10 km from Nevada Gold Mines’ prolific Turquoise Ridge Complex which currently hosts Summer Camp Project ~20Moz of gold resources(5)

  13. Slide 13: Granite Creek Underground PEA Highlights

    GRANITE CREEK UNDERGROUND PEA HIGHLIGHTS Measured & Indicated Resource(6) 261koz @ 10.5 g/t Au Inferred Resource(6) 326koz @ 13.0 g/t Au Mine Life ~8 years Average Annual Gold Production (following production ramp up) ~60koz @ AISC $1,597/oz $2,175/oz Gold Price Assumption After-Tax NPV(5%)(1) After

  14. Slide 14: i-80 Gold's First Underground Gold Mine

    GRANITE CREEK UNDERGROUND i-80 GOLD’S FIRST UNDERGROUND GOLD MINE • Excellent resource reconciliation to model on tonnage OGEE AND SOUTH PACIFIC ZONES and grade since ramp-up start in 2023 Exploration results to-date suggest significant potential for resource growth • Underground exploration drift c

  15. Slide 15: Potential for Expansion in the South Pacific Zone

    GRANITE CREEK UNDERGROUND POTENTIAL FOR EXPANSION IN THE SOUTH PACIFIC ZONE 40 Holes Planned For ~14,000 Meters (In Progress) • Underground exploration drift now complete providing access for infill and step-out drilling in the prospective South Pacific Zone • Drill program designed to upgrade the m

  16. Slide 16: Production & Cash Flow Expected to Rise After Autoclave Restart

    GRANITE CREEK UNDERGROUND PRODUCTION & CASH FLOW EXPECTED TO RISE AFTER AUTOCLAVE RESTART(4) KEY OPERATING & FINANCIAL METRICS FROM PEA PEA HIGHLIGHTS Life of Mine • Mineral resource estimate excludes 2023-2024 drilling data $2,175/oz gold price assumption Mine Life ~8 years • 2025 effects of underg

  17. Slide 17: Granite Creek Open Pit PEA Highlights

    GRANITE CREEK OPEN PIT PEA HIGHLIGHTS Measured & Indicated Resource(9) 1.4Moz @ 1.18 g/t Au Inferred Resource(9) 75koz @ 1.09 g/t Au Mine Life ~10 years Average Annual Gold Equivalent Production (following production ramp up) ~130koz @ AISC $1,225/oz $2,175/oz Gold Price Assumption After-Tax NPV(5%)

  18. Slide 18: Large High-Grade, Low-Capex Open Pit Project

    GRANITE CREEK OPEN PIT LARGE HIGH-GRADE, LOW-CAPEX OPEN PIT PROJECT • Key component to growing production GRANITE CREEK OPEN PIT LAYOUT profile towards mid-tier status • Former producing mine with substantial existing infrastructure • Significant oxide and transitional mineralization remains below a

  19. Slide 19: Open Pit Is Significantly Larger Than Previous 2021 Study

    GRANITE CREEK OPEN PIT OPEN PIT IS SIGNIFICANTLY LARGER THAN PREVIOUS 2021 STUDY KEY OPERATING & FINANCIAL METRICS FROM PEA PEA HIGHLIGHTS $2,175/oz gold price assumption Life of Mine • Steady gold prices provided the opportunity to reassess the optimal processing stream Mine Life ~10 years Average

  20. Slide 20: Ruby Hill Property

    RUBY HILL PROPERTY PROJECTS ON THE PROPERTY • Archimedes Underground • Mineral Point Open Pit Dominant land position in the Eureka Mining District ~250 km to Lone Tree processing facility via road Host to both gold and base metal mineralization i-80 GOLD CORP | 20

  21. Slide 21: Archimedes Underground PEA Highlights

    ARCHIMEDES UNDERGROUND PEA HIGHLIGHTS Indicated Mineral Resource(10) 436koz @ 7.6 g/t Au Inferred Resource(10) 988koz @ 7.3 g/t Au Mine Life ~10 years Average Annual Gold Production (following production ramp up) ~100Koz @ AISC $1,893/oz $2,175/oz Gold Price Assumption After-Tax NPV(5%)(1) After-Tax

  22. Slide 22: i-80's Second Planned Underground Mine

    ARCHIMEDES UNDERGROUND i-80’S SECOND PLANNED UNDERGROUND MINE • High-grade underground gold project LONGITUDINAL SECTION OF MINERALIZED BODIES • Final permitting stage for upper-level mining activities above 5100’ level complete – sequential approach expedites mining through mid-2027, while finalizi

  23. Slide 23: High-Tonne, Low-Cost Operation

    ARCHIMEDES UNDERGROUND HIGH-TONNE, LOW-COST OPERATION KEY OPERATING & FINANCIAL METRICS FROM PEA PEA HIGHLIGHTS $2,175/oz gold price assumption Life of Mine • Potential to achieve the highest underground mining rate Mine Life ~10 years among i-80 Gold’s underground operations Average Annual Producti

  24. Slide 24: Mineral Point Open Pit PEA Highlights

    MINERAL POINT OPEN PIT PEA HIGHLIGHTS Indicated Mineral Resource(11) 3.4Moz @ 0.48 g/t Au 104.3Moz @ 15.0 g/t Ag Inferred Resource(11) 2.1Moz @ 0.34 g/t Au 91.5Moz @ 14.6 g/t Ag Mine Life ~17 years Average Annual Gold Equivalent Production(2) (following production ramp up) ~280koz @ AISC $1,400/oz $

  25. Slide 25: Potential to Become i-80's Largest Producing Asset

    MINERAL POINT OPEN PIT POTENTIAL TO BECOME i-80’S LARGEST PRODUCING ASSET • Large oxide Au-Ag deposit – largest of two oxide projects in i-80 Gold’s portfolio • Potential to become one of Nevada’s largest open-pit truck-and-shovel mining operations and a key driver of future growth for i-80 • 2025 f

  26. Slide 26: Mineral Point

    MINERAL POINT KEY OPERATING & FINANCIAL METRICS FROM PEA PEA HIGHLIGHTS $2,175/oz Au price assumption; $27.25/oz Ag price assumption Life of Mine • Existing understanding of geology, hydrology and metallurgy substantially reduces execution risks Mine Life 16.5 years Average Annual Gold • Project fun

  27. Slide 27: Cove Underground PEA Highlights

    COVE UNDERGROUND PEA HIGHLIGHTS Indicated Gold Resource(12) 311koz @ 8.2 g/t Au Inferred Resource(12) 1.16Moz @ 8.9 g/t Au Mine Life ~8 years Average Annual Gold Production (following production ramp up) ~100koz @ AISC $1,303/oz $2,175/oz Gold Price Assumption After-Tax NPV(5%)(1) After-Tax IRR Afte

  28. Slide 28: i-80's Third Planned Underground Gold Mine

    COVE UNDERGROUND i-80’S THIRD PLANNED UNDERGROUND GOLD MINE • High-grade, brownfield stage, gold deposits open for expansion down-plunge CURRENT MINE PLAN INCLUDES HELEN & GAP DEPOSITS • Located immediately south of Nevada Gold Mines’ Phoenix Cu-Au Mine; ~85 km to Lone Tree autoclave • Additional me

  29. Slide 29: Recent Two-Year Infill Drill Program Not Included in 2025 PEA

    COVE UNDERGROUND RECENT TWO-YEAR INFILL DRILL PROGRAM NOT INCLUDED IN 2025 PEA KEY OPERATING & FINANCIAL METRICS PEA HIGHLIGHTS $2,175/oz gold price assumption Life of Mine • Low capital, high return on estimated invested capital Mine Life ~8 years • Ongoing infill drill program in Helen and Gap zon

  30. Slide 30: Permitted Autoclave with Short Construction Timeline

    LONE TREE PROCESSING FACILITY PERMITTED AUTOCLAVE WITH SHORT CONSTRUCTION TIMELINE GRANITE CREEK UNDERGROUND ONE OF TWO NEVADA COMPANIES WITH AN AUTOCLAVE PROCESSING FACILITY • Key to unlocking value of underground deposits • Eliminates reliance on costly third-party toll LONE TREE COVE milling AUTO

  31. Slide 31: Lone Tree Processing Facility Refurbishment Scope

    Lone Tree Processing Facility ~% of Refurbishment Scope Budget General Plant (incl. Refinery) 25% Filtered Tails Autoclave 24% Tailings Filtrations & Treatment 24% Ore Processing 14% Carbon in Water Treatment RO Oxygen Plant 8% Leach Mercury Scrubber 6% A/C Boiler Mercury Scrubber A/C Oxygen Plant S

  32. Slide 32: Appendix

    APPENDIX Lone Tree Processing Facility

  33. Slide 33: Capital Overview

    FINANCIAL POSITION CAPITAL OVERVIEW Rank Institution (as at September 11, 2025) S/O Location 1 Condire Management 9.8% United States TSX: NYSE American: 3 Daniel Kaufman 7.0% Puerto Rico Ticker Symbols IAU IAUX 2 Sprott Asset Management 5.2% Canada CAD USD 4 Van Eck Associates Corporation 3.6% Unite

  34. Slide 34: Q2 Financial Highlights

    Q2 FINANCIAL HIGHLIGHTS • ~8,400 ounces in gold sales, an Three months ended June 30, Six months ended June 30, increase over the same prior year period 2025 2024 2025 2024 Revenue $000s 27,836 7,184 41,884 15,597 • ~$28M in total revenue, an increase Net loss $000s (30,215) (41,005) (71,420) (60,70

  35. Slide 35: Proven Track Record in Developing and Financing Mining Operations

    TORONTO OFFICE PROVEN TRACK RECORD IN DEVELOPING AND FINANCING MINING OPERATIONS RICHARD YOUNG PAUL CHAWRUN DAVIS SAVARIE LEILY OMOUMI KATERINA DELUCA CINDY TSEO President & Chief Operating Officer SVP, General Counsel SVP Corporate VP Treasury VP Finance Chief Executive Officer, Development & Strat

  36. Slide 36: A Team with Deep Nevada Mining Experience

    RENO OFFICE A TEAM WITH DEEP NEVADA MINING EXPERIENCE RYAN SNOW TIM GEORGE TODD ESPLIN TYLER HILL MARK MILLER CURTIS TURNER Chief Financial Officer VP Operations VP Technical Services VP Geology VP Environmental & VP Strategic Planning Permitting Form er VP of Finance at Advanced career through Form

  37. Slide 37: Experienced Board of Directors

    EXPERIENCED BOARD OF DIRECTORS EVA BELLISSIMO CASSANDRA RON CLAYTON RICHARD YOUNG JOHN BEGEMAN JOHN SEAMAN ARTHUR EINAV JOSEPH Chairman President & Director Director Director Director Director Chief Executive Officer, Director 4 0 + ye a rs 2 0 + e xp e ri e n c e i n 4 0 + ye a rs 3 0 + ye a rs o p

  38. Slide 38: Executing on a Recapitalization Strategy

    COMPANY OVERVIEW EXECUTING ON A RECAPITALIZATION STRATEGY Planned Growth Spend Over the Next 12 Months STRENGTHENING THE BALANCE SHEET AND Growth Capital 12-month Timing Amount FUNDING NEAR-TERM GROWTH Underground Development 2025 to mid-2026 $35M • Recapitalization timeline now aligned to Archimede

  39. Slide 39: Non-GAAP Financial Performance Measures

    NON-GAAP FINANCIAL PERFORMANCE MEASURES The Company has included certain terms or performance measures commonly used in the mining industry that are not defined under US GAAP in this document. This includes average realized price per ounce. Non-GAAP financial performance measures do not have any sta

  40. Slide 40: Mineral Resources Attributable to i-80 Gold Corp.

    MINERAL RESOURCES MINERAL RESOURCES Tonnes Au Grade Ag Grade Au Ounces Ag Ounces ATTRIBUTABLE TO Measured (kt) (Au g/t) (Ag g/t) (koz) (koz) i-80 GOLD CORP. Granite Creek – Open Pit(9) Granite Creek – Underground(6) 26,360 133 1.26 8.5 1,066 37 Lone Tree – Open Pit(14) Cove – Underground(12) Ruby Hi

  41. Slide 41: Mineral Resources Defined by Underground & Open Pit Deposits

    MINERAL RESOURCES DEFINED BY UNDERGROUND & OPEN PIT DEPOSITS Underground Mineral Resources Open Pit Mineral Resources Au Ag Au Ag Tonnes Au Grade Ag Grade Tonnes Au Grade Ag Grade Ounces Ounces Ounces Ounces (kt) (g/t Au ) (g/t Ag) (koz) (koz) (kt) (g/t Au) (g/t Ag) (koz) (koz) Measured & Indicated

  42. Slide 42: Endnotes

    ENDNOTES 1) For the Archimedes Underground Project, cash flow and NPV are calculated as of the start of construction, which is anticipated to commence in early in the second quarter 2025, subject to obtaining the necessary permits by March 31, 2025, as anticipated. After tax metrics for Archimedes U

  43. Slide 43: Endnotes Continued

    ENDNOTES CONTINUED 7) This outlook target, is subject to various risks, uncertainties and assumptions, which may impact future performance and the Company’s ability to achieve the results and targets discussed in this section. Please refer to “Cautionary Statement Regarding Forward-Looking Informati

  44. Slide 44: For Further Information, Please Contact

    NYSE AMERICAN: IAUX | TSX: IAU FOR FURTHER INFORMATION, PLEASE CONTACT: LEILY OMOUMI SVP CORPORATE DEVELOPMENT & STRATEGY 1.866.525.6450 INFO@I80GOLD.COM WWW.I80GOLD.COM

i-80 Gold — Investor Presentation (October 2025) on 6ix