Harmony Gold Mining Co. Ltd. · JSE:HAR
Harmony Gold Mining — Investor Presentation (October 2007)
7 slides from Harmony Gold Mining's investor presentation, Oct 5, 2007
Slide 1: Analyst presentation Graham Briggs
Analyst presentation Graham Briggs 5 October 2007 Private Securities litigation reform act safe harbour statement This presentation contains "forward-looking statements" within the meaning of Section 27A of the Securities Act of 1933, as amended, and 21E of the Securities Exchange Act of 1934, as am
Slide 2: Strengthening of management team
Strengthening of management team Position of Chief Operating Office split - Alwyn Pretorius COO of Northern region - Tom Smith COO of Southern region - Holds a NHD Mine Surveying and Metalliferous Mining certificate from Wits Technikon - Appointed General Manager at Tshepong in 2000 with Harmony fro
Slide 3: Feedback on our progress
Feedback on our progress – Replanning of all operations – Changing of development strategies at shafts – Reviewing profitability of all shafts – Review of Conops still in progress – Good progress made with accounting system analysis - Implementation deficiencies identified - Stock S taking done to e
Slide 4: Sale of assets and September quarter projections
Sale of assets – Wafi/Golpu - Good pprogress g on copper pp options, p copper/gold pp g p partnering g - Objective to retain at least 50% stakeholding – South Kal - Meeting conditions precedent – Mount Magnet - Sale proceeding Total SA underground September quarter projections – Production - Tonnes
Slide 5: September 2007 Outlook: SA underground operations
September 2007 Outlook SA underground operations Growth operations – Elandsrand improved volumes – Doornkop grade improved due to increased mining from South Reef – Costs higher at both operations Quality operations – Target negatively affected by low availability of trackless loaders – Tshepong gra
Slide 6: September 2007 Outlook: SA surface operations
September 2007 Outlook SA surface operations – Kalgold - Kalgold’s tonnes milled improved as a result of water availability from additional new boreholes – Project Phoenix - Reached maximum production levels Loan – Loan facility with Nedbank Limited – To the value of R2 billion – Settlement of loan
Slide 7: Thank you
Thank you www.harmony.co.za h 7
Harmony Gold Mining — Investor Presentation (October 2007) on 6ix