  1. Slide 1: Analyst presentation Graham Briggs

    Analyst presentation Graham Briggs 5 October 2007 Private Securities litigation reform act safe harbour statement This presentation contains "forward-looking statements" within the meaning of Section 27A of the Securities Act of 1933, as amended, and 21E of the Securities Exchange Act of 1934, as am

  2. Slide 2: Strengthening of management team

    Strengthening of management team Position of Chief Operating Office split - Alwyn Pretorius COO of Northern region - Tom Smith COO of Southern region - Holds a NHD Mine Surveying and Metalliferous Mining certificate from Wits Technikon - Appointed General Manager at Tshepong in 2000 with Harmony fro

  3. Slide 3: Feedback on our progress

    Feedback on our progress – Replanning of all operations – Changing of development strategies at shafts – Reviewing profitability of all shafts – Review of Conops still in progress – Good progress made with accounting system analysis - Implementation deficiencies identified - Stock S taking done to e

  4. Slide 4: Sale of assets and September quarter projections

    Sale of assets – Wafi/Golpu - Good pprogress g on copper pp options, p copper/gold pp g p partnering g - Objective to retain at least 50% stakeholding – South Kal - Meeting conditions precedent – Mount Magnet - Sale proceeding Total SA underground September quarter projections – Production - Tonnes

  5. Slide 5: September 2007 Outlook: SA underground operations

    September 2007 Outlook SA underground operations Growth operations – Elandsrand improved volumes – Doornkop grade improved due to increased mining from South Reef – Costs higher at both operations Quality operations – Target negatively affected by low availability of trackless loaders – Tshepong gra

  6. Slide 6: September 2007 Outlook: SA surface operations

    September 2007 Outlook SA surface operations – Kalgold - Kalgold’s tonnes milled improved as a result of water availability from additional new boreholes – Project Phoenix - Reached maximum production levels Loan – Loan facility with Nedbank Limited – To the value of R2 billion – Settlement of loan

  7. Slide 7: Thank you

    Thank you www.harmony.co.za h 7