Kapa Gold Inc · TSXV:KAPA
Kapa Gold — Investor Presentation (July 2026)
17 slides from Kapa Gold's investor presentation, July 2026
Slide 1: Corporate Presentation July 2026
TSXV:KAPA CORPORATE PRESENTATION July 2026
Slide 2: Cautionary Disclosure Statement
Cautionary Disclosure Statement Kapa Gold Inc. (the “Company”) has prepared this corporate presentation for the exclusive use of the recipient. materially from those expressed in the forward-looking statements and information contained herein include: This material is confidential and except with th
Slide 3: About Kapa Gold
ABOUT KAPA GOLD Kapa Gold Inc is exploring its 100% owned, previous producing, historic Blackhawk Gold Mine and surrounding areas in southern California. Blackhawk Project ▪ Blackhawk was a high-grade, underground gold mine in San Bernadino County, California. ▪ The property consists of seven patent
Slide 4: Blackhawk History
BLACKHAWK HISTORY ▪ Gold Mineralization Discovered in 1870's. ▪ Commercial Production 1921 (Arlington Mining Co.) ▪ Mine and Mill Expansion 1938 (Santa Fe Mining Co.) ▪ Mine Closed by Presidential Order 1942. ▪ Acquired by Kapa Gold in 2016. ▪ Kapa has initiated modern geophysical exploration and de
Slide 5: Regional Structural Setting
REGIONAL STRUCTURAL SETTING Three Structural Intersections ✓ San Andreas Fault ✓ Eastern California Shear Zone ✓ Northern Frontal Thrust Zone TSXV:KAPA 5
Slide 6: The Structural Setting
THE STRUCTURAL SETTING Northern Frontal S N Thrust System Blackhawk Area (Looking West) ▪ Thrusts rooted to the south beneath Blackhawk Mountain. ▪ Surface mineralization traced in multiple directions over an area of 4,500 m by 2,200 m in exposed thrusts. ▪ Mineralization developed through a vertica
Slide 7: Blackhawk Highlights
BLACKHAWK HIGHLIGHTS HISTORICAL PRODUCTION ▪ Reports record Gold produced from ramps, underground, high-grade zones. PROPERTY ▪ Seven Patented Lode Claims. ▪ Patented Mill Site and Patented Water Weil Rights. ▪ 178 Contiguous Federal Lode Claims. ▪ 2% Net Smelter Royalty. ▪ 2% Gross Rock Royalty on
Slide 8: Access and Infrastructure
ACCESS AND INFRASTRUCTURE ROAD: Gravel road access to site 8 km south off State Hwy 274. Close to towns of Lucerne Valley, Apple Valley, etc. RAIL: Rail spur from Apple Valley links all adjacent mines, with current termination at Mitsubishi Cement Corporation, 5 km from Blackhawk mine site. POWER: P
Slide 9: Surface Sampling Au, Ag
SURFACE SAMPLING AU, AG TSXV:KAPA 9
Slide 10: Ground Geophysics
GROUND GEOPHYSICS ▪ IP and Resistivity, Magnetic and VLF-EM Surveys. ▪ VLF-EM revealed several conductors which may be reflective of structure. ▪ Focused on and directly adjacent to patented claims. ▪ Very effective and correlate well with airborne survey. ▪ Identified six main anomalies coincident
Slide 11: Geological Program
GEOLOGICAL PROGRAM ▪ Prior mapping and rock sampling program concentrated on non- historic, underground precious metal patent claims (Figure 1). ▪ Surface sampling focused on 2 zones: Partin Quarry Area & Mill Site Area ▪ 69 rock samples collected with over 80% returning significant precious and bas
Slide 12: Geological Program Results
GEOLOGICAL PROGRAM RESULTS ▪ July 2023 follow up mapping and rock sampling program returned gold, silver and base metal values greater than upper limit of chosen analytical method, therefore samples were re-assayed. ▪ Re-assayed samples in confirmed high-grade and precious metal abundances along 3.8
Slide 13: New Geological Highlights
NEW GEOLOGICAL HIGHLIGHTS ▪ To undertake a 2,000-metre drill program to investigate skarn mineralization. ▪ Proposed 10 drill holes, 200-metre depths. ▪ Targeting 2 new areas to East and Northeast of prior mill site never previously targeted or drilled. ▪ Northeast target several kilometres in lengt
Slide 14: Kapa Gold and MFD Team Up to Advance Blackhawk
KAPA GOLD AND MFD TEAM UP TO ADVANCE BLACKHAWK UNLEASHING POTENTIAL WITH MFD: Kapa Gold has entered a strategic partnership with MFD Investment Holdings to accelerate the development of its Blackhawk Gold Property in California. Known for its expertise in fast-tracking mining projects, MFD brings an
Slide 15: Share Structure
SHARE STRUCTURE KAPA GOLD INC Price Shares Shares outstanding 99,042,009 Warrants (November 2027 expiry) 0.10 19,500,000 (June 2028 expiry) 0.25 13,160,699 (July 2028 expiry) 0.25 5,695,666 38,356,365 Options (November 2026 expiry) 0.11 200,000 (May 2027 expiry) 0.25 1,700,000 (July 2028 expiry) 0.1
Slide 16: Management & Directors
MANAGEMENT & DIRECTORS DAVID K. PAXTON DARREN PRINS, CPA, CA CEO & DIRECTOR CHIEF FINANCIAL OFFICER Mr. Paxton trained as a mining engineer in the South African Mining Industry. He Mr. Prins has extensive experience in corporate development, capital markets, has nearly four decades of experience in
Slide 17: Contact Us
CONTACT US HEAD OFFICE KAPA GOLD INC. 1199 W Hastings Street, Suite #1400 Vancouver, BC V6E 3T5, Canada Phone: 604-343-3889 Email: info@kapagold.com INVESTOR RELATIONS KONSTANTINE TSAKUMIS Tel: 604-961-9442 Email: kon@kapagold.com Image: Gosaan zone Santa Fe mine area, Blackhawk property TSXV:KAPA 1