  1. Slide 1: Community Liaison Committee Meeting #28

    Community Liaison Committee Meeting #28 March 5th, 2019

  2. Slide 2: Agenda

    Agenda 1. Review of December 5th, 2018 meeting notes 2. Membership Items 3. Site Specific Standards / Technical Standards 4. Algoma Boat Slip 5. Noise Abatement 6. Environmental Compliance Approval updates 7. Greenhouse gases 8. Legacy Environmental Action Plan 9. Public Open House 10. Next Meetings

  3. Slide 3: Membership Items

    Membership Items Current Members and Alternates Representation Primary Member Alternate Algoma Steel Fred Post Chris Galizia Ministry of Environment, Conservation & Parks Lori Greco Ron Dorscht Public David Trowbridge Peter McLarty Public Patt Marquis SSM Tribe of Chippewa Indians Kathie Brosemer Al

  4. Slide 4: Site Specific Standard for Particulate and BaP

    Site Specific Standard for Particulate and BaP • On March 27th, 2015 Algoma received a Site Specific Standard for Particulate which sets specific emission limits in cokemaking: – Certified observers (per EPA Method 9 and Method 303) – 5 days per week, 10 Saturdays and 10 Sundays each year – Must obs

  5. Slide 5: Site Specific Air Quality Standard for Particulate & B(a)P

    Site Specific Air Quality Standard for Particulate & B(a)P Identifies Key Performance Indicators related to Cokemaking Emissions: o average intensity of pushing emissions o average duration of charging emissions o % lid leaks Conformance calculated daily for o % off-takes leaks each battery o % door

  6. Slide 6: Continued Success through Operating Adjustments

    Continued Success through Operating Adjustments To date all corrective actions have been successful at reducing pushing opacity below the limit. Corrective actions include: o Taking cross-wall temperature readings to identify problem flues o Cleaning the flues, pins, orifices, risers, flex hoses, ve

  7. Slide 7: Charging Emissions Below Limit

    Charging Emissions Below Limit Preventative Measures include: Adjusting carbon scraper bar Decarbonizing standpipes, goosenecks and charge holes Cleaning goosenecks, sleeves to the collector main, and steam jets Replacing drop sleeve donuts, bellow bags, and carbon seals Adjusting coal feed systems

  8. Slide 8: Lid Emissions Below Limit

    Lid Emissions Below Limit Preventative Measures include: Applying lid sealant immediately after charging an oven and whenever emissions are observed Replacing damaged or cracked lids Repairing, leveling and grouting charge hole bases to ensure proper seal 8

  9. Slide 9: Off-take Emissions Below Limit

    Off-take Emissions Below Limit Preventative measures include: Replacing the soft seal and adjusting the cap Cleaning the gooseneck, sleeve to collector main, and steam jet Re-packing collar or base of the pipe with refractory Applying masonry seal to small cracks until welding can be completed Repla

  10. Slide 10: Door Emissions Below Limit

    Door Emissions Below Limit Preventative measures include: Adjusting door bolts, frame clips and hour glass clips Cleaning doors, door jambs, sill plates and spotting targets Replacing door cleaner bushes and jamb cleaner blades on frequent schedule Replacing damaged doors and frames. Applying silica

  11. Slide 11: Stack Opacity

    Stack Opacity Continuous corrective actions on all batteries • Part of the investment plan to achieve compliance with SSS limits also focuses on reducing stack emissions from cokemaking • Intensive Masonry maintenance continues to be required on oven walls and end flues • Focus is on reducing intens

  12. Slide 12: Public Complaints

    Public Complaints There were no public complaints received since the last CLC meeting that related to a matter addressed in the SSS Order. The following public complaint was received by the company: • Feb 24th – Noise at Welded Beam – building heating boiler adjustment made 12

  13. Slide 13: Site Specific Standards (SSS)

    Site Specific Standards (SSS) Benzene SSS - requires expansion of Benzene Emission Control (BEC) systems and on site monitoring to identify missing sources • North Raw Liquor Tank – removed from service in late spring • Planning has started to install remaining controls by 2020 year end • A monitori

  14. Slide 14: Technical Standard

    Technical Standard Regulatory Instrument to replace existing SSS’s • The MECP commenced discussions with sector on new Technical / Site Specific Standards for multiple air contaminants • Contaminants could include: Particulate, B(a)P, Benzene, Sulfur Dioxide, Total Reduced Sulfur and Metals (x4) • P

  15. Slide 15: Technical Standard

    Technical Standard Next steps – Algoma Steel to participate in Ministry working groups focusing on: • Fugitive metal/particulate emissions from on-site roadways; steel-making; slag management; • Limiting emissions from blast furnace upsets; • Identifying current emission sources and air pollution co

  16. Slide 16: Boat Slip Sediment

    Boat Slip Sediment Dredging occurred in summer 2017. The objective was to remove legacy contaminated sediment. A post-dredge sediment sampling was completed in May 2018. The results indicate contamination remains where previous dredging ended. A thin layer of contamination remains where dredging was

  17. Slide 17: Noise Abatement

    Noise Abatement • Installation commenced in October 2018 for two fan motor enclosures at the steelmaking gas cleaning plant • Completion anticipated in April 2019 • Cost ~$1,076,000 17

  18. Slide 18: Noise Abatement

    Noise Abatement • New acoustic silencing muffler has been fabricated and shipped to site • Final installation anticipated in April 2019 • Cost $742,000 18

  19. Slide 19: New Environmental Compliance Approval Applications

    New Environmental Compliance Approval Applications • Algoma submitted an Environmental Compliance Approval application for a surface and groundwater treatment facility at base line ditch. • The application was posted on the EBR for public comment on Nov. 9th and is available at: http://www.ebr.gov.o

  20. Slide 20: Climate Change Regulations

    Climate Change Regulations Federal Backstop • Federal regulations apply to provinces without carbon pricing systems starting Jan 1 2019. • There are two primary components of the federal system: 1. Output Based Pricing System (OBPS) • Beginning Jan. 1st 2019, the federal backstop applies to the inte

  21. Slide 21: Legacy Environmental Action Plan (LEAP)

    Legacy Environmental Action Plan (LEAP) Environmental Framework Agreement • The MECP and Algoma Steel signed an Environmental Framework Agreement which was established to mitigate risk from on-site legacy environmental liabilities Program Approval • Ontario’s EPA allows a person responsible for a so

  22. Slide 22: Public Open Houses

    Public Open Houses • Last open house held on December 5, 2018 at the Polish Canadian Hall • Next open house to be scheduled for fall 2019. 22

  23. Slide 23: Next Meeting

    Next Meeting • Proposed 2019 Schedule: • March 5th, 2019 (today) • June 4th, 2019 • September 10th, 2019 23