Ur-Energy Inc. · TSX:URE
Ur-Energy — Investor Presentation (March 2011)
18 slides from Ur-Energy's investor presentation, Mar 22, 2011

Slide 1: Moving Lost Creek to Production
NYSE Amex: URG TSX: URE Moving Lost Creek to Production Corporate Objectives: Be a Low Cost Uranium Producer Optimize Strategic Opportunities Build Shareholder Value Create Value From Historic Databases Webcast Presentation March 22, 2011

Slide 2: Disclaimer
Disclaimer This presentation contains “forward-looking statements,” within the meaning of applicable securities laws, regarding events or conditions that may occur in the future. Such statements include without limitation the Company’s timeframe for events leading to and culminating in the commencem

Slide 3: Ur-Energy At A Glance
Ur-Energy At A Glance Share Capital & Cash Position Cash per share as of 12/31/10 ~C$0.33 As of 03/17/11 Share price as of 03/21/11 C$1.97 Shares Outstanding 103.4M 52 Week Range C$.76 - C$3.35 Stock Options & RSUs 6.0M Avg. Daily Volume ~2,750,000 Fully Diluted 109.4M (3-mo URE & URG) Geographical

Slide 4: Analyst Coverage
Analyst Coverage United States GVC Capital Mike Shonstrom (Denver, CO) 1 303-321-2392 Rodman & Renshaw New York 1 212-430-1742 Canada Dundee Securities David A. Talbot (Toronto, ON) 1 416-350-3082 Haywood Securities Geordie Mark (Vancouver, BC) 1 604-697-6112 Macquarie Capital Duncan McKeen (Montrea

Slide 5: US Produces Only 7% of Uranium Consumed
US Produces Only 7% of Uranium Consumed Events in Japan are unlikely to influence US demand The US produces only 7% of the uranium it consumes In 2009, the 10-year forward cumulative unfilled uranium requirement of US utilities was 260,982,000 lbs See Disclaimer re Forward-looking Statements and Pro

Slide 6: Future Demand to Outpace Supply
Future Demand to Outpace Supply Despite the events in Japan, we anticpate global fundamentals are not likely to change – 65 reactors are currently under construction worldwide China expected to install at least 75 GWe of nuclear capacity by 2020 (McKinsey&Company) HEU Program expires in 2013 and the

Slide 7: 2010 Achievements
2010 Achievements WDEQ Final Class I UIC Permit (water disposal well) Received – Only WY Company to have secured permit WDEQ-Air Quality Permit Received State Engineer Holding Ponds Permit Received NRC Pre-License Exemption for Limited Construction Granted WY Game & Fish Dept. Approved Wildlife Mana

Slide 8: 2011 Achievements
2011 Achievements Draft NRC License Received First Long Term Uranium Sales Agreement Announced Issued new NI 43-101 Preliminary Assessment Validating Lost Creek Project Acquisition of Exploration Properties in Nebraska Announced 8 NYSE Amex: URG TSX: URE

Slide 9: Lost Creek
Lost Creek Rio Tinto Sweetwater Mill – 3 miles south (NRC Licensed Conventional Uranium Mill on Standby) • Lost Creek Property - 33,794 acres, includes • Lost Creek Project - 4,254 acres • Adjoining Properties - 29,540 acres •Strong Community Support – No Opposition NYSE Amex: URG TSX: URE

Slide 10: Lost Creek Project – Moving Towards Production
Lost Creek Project – Moving Towards Production Leach Efficiency - 80% Industry Avg. - ~70% 540 drill holes defined 1970s (Recovery Rate) discovery Pump Test Results - >30-50gpm Industry Avg. - 15gpm (Good Porosity = Cost Savings) 1,096 drill holes, 728,757 feet (222,125 meters), drilled by Ur- Energ

Slide 11: Lost Creek Preliminary Assessment
Lost Creek Preliminary Assessment 2011 PA update confirms favorable economics Estimates Operating Costs less than US$20 per pound Includes groundwater restoration & site reclamation Includes 10% contingency Total Production Cost estimated at US$42.65/lb (includes capital recovery) Project pre-tax ne

Slide 12: US$24M in CapEx Completed
US$24M in CapEx Completed Mine Units 1 & 2 Delineated MU #1 Monitor Well Ring Completed Plant Engineering Completed Drilled and Tested Class I UIC Well Ordered Key Plant Equipment 10 Ion Exchange Columns 2 Ion Exchange polishing columns 2 Restoration columns 2 Elution columns 2 Filter presses Ur-Ene

Slide 13: Lost Creek Property
Lost Creek Property Exploration targets provide potential of additional resources U3O8 to be added to Lost Creek Project Area and adjoining properties Multiple roll fronts in four stratigraphic horizons defined by ~500+ drill holes ~50-60 historic holes on mineralized property with grades similar to

Slide 14: Lost Creek Regulatory Achievements
Lost Creek Regulatory Achievements Sweetwater County: Development Plan Approved by County Commissioners, December 2009 Wyoming DEQ – Air Quality Division: Operational Permit Final Permit Issued, January 2010 Wyoming DEQ – Water Quality Division: Class I UIC Permit (water disposal well) Final Permit

Slide 15: Today’s Reality
Today’s Reality We do not believe that the events in Japan will have long-term effects on the uranium market fundamentals; while creating some immediate uncertainties, the uranium market appears already to be stabilizing. China and Asian countries have been actively acquiring future supplies, constr

Slide 16: Ur-Energy’s Strong Position
Ur-Energy’s Strong Position Technical Team – Best Among North American Juniors Near-Term, Low-Cost Production (~$20.00/lb) Mining Jurisdiction - Uranium Friendly Economical On-Site Processing Plant Cash Resources, C$33.8 Million (12/31/10) Plus C$3.2 Million from exercised stock options Permitting P

Slide 17: 2011 Is Our Year!
2011 Is Our Year! Anticipated Issuance of NRC Source Material License Issuance of WDEQ Permit to Mine BLM Plan of Operations Approval Targeted Construction Start-up (Beginning of 6 – 9 Month Build-Out) Enter into Offtake Agreement for Future Uranium Delivery with US Utilities (First Contract Complet

Slide 18: Ur-Energy - The Right People. The Right Projects. Right Now.
Ur-Energy - The Right People. The Right Projects. Right Now. For more information, please contact: Bill Boberg, President, Chief Executive Officer & Director Jeff Klenda, Board Chairman & Director Rich Boberg, Director, Public Relations By Mail: Ur-Energy Corporate Office 10758 W. Centennial Rd.
Source: Internet Archive copy of ur-energy.com
More decks from Ur-Energy Inc.
Q3 2026 Earnings Presentation9 slides · Nov 10, 2026
Investor Presentation (October 2026)24 slides · October 2026
Q2 2026 Earnings Presentation8 slides · Aug 11, 2026
Investor Presentation (July 2026)15 slides · Jul 13, 2026
Investor Presentation (March 2019)23 slides · Mar 7, 2019
Corporate Update (August 2018)23 slides · Aug 7, 2018