  1. Slide 1: Pritchard Capital Conference Energize

    Slide 1: Pritchard Capital Conference Energize

    Pritchard Capital Conference Energize San Francisco, CA January 2012

  2. Slide 2: Forward Looking Statements

    Slide 2: Forward Looking Statements

    1 Forward Looking Statements www.bpzenergy.com NYSE & BVL: BPZ This Presentation contains forward-looking statements within the meaning of the Private Securities Litigation Reform Act of 1995, Section 27A of the Securities Act of 1933 and Section 21E of the Securities Exchange Act of 1934.These forw

  3. Slide 3: BPZ Energy in Peru

    Slide 3: BPZ Energy in Peru

    2 BPZ Energy in Peru www.bpzenergy.com NYSE & BVL: BPZ Focus Oil & Gas Four Blocks 100% working interests Acreage 2.2 million acres Current Production Corvina & Albacora* Oil Fields Offshore Exploration Multiple Plays *Albacora production achieved during testing

  4. Slide 4: More About Us

    Slide 4: More About Us

    3 More About Us www.bpzenergy.com NYSE & BVL: BPZ NYSE & BVL Ticker BPZ Market Capitalization (1) $ 350 MM Shares Outstanding 116 MM Proved Oil Reserves (2) 39 MMBO Est. 2011 Avg. Daily Production 3,775 BOPD Nine-Month 2011: Revenues $ 112 MM Operating Income $ 16 MM EBITDAX (3) $ 53 MM Share Owners

  5. Slide 5: 2011 Building Blocks

    Slide 5: 2011 Building Blocks

    4 2011 Building Blocks www.bpzenergy.com NYSE & BVL: BPZ Launched the partnering process on Block Z-1 Received 3-D seismic approval for Block Z-1 Signed new CX-15 platform contracts and began work Conducted seismic surveys & interpreted data on Blocks XXII and XXIII Drilled first onshore exploration

  6. Slide 6: 2012 Key Initiatives

    Slide 6: 2012 Key Initiatives

    5 2012 Key Initiatives www.bpzenergy.com NYSE & BVL: BPZ Achieving commerciality at Albacora oil field Optimizing oil production via artificial lift Developing 22MMBO of Corvina PUDs from new CX-15 platform Exploring onshore and offshore Unlocking asset value 1. 2. 3. 4. 5.

  7. Slide 7: Achieving Commerciality at Albacora

    Slide 7: Achieving Commerciality at Albacora

    6 Achieving Commerciality at Albacora www.bpzenergy.com NYSE & BVL: BPZ Steps to Commerciality Equipment placed on platform Installation underway Commission gas reinjection equipment

  8. Slide 8: Optimizing Production

    Slide 8: Optimizing Production

    Optimizing Production 7 www.bpzenergy.com NYSE & BVL: BPZ Corvina Field Workovers completed Gas cap reinjection program underway Continue to implement artificial lift program Albacora Field A-14XD well again producing oil naturally Permit received to open and test A-12F Continue to implement artific

  9. Slide 9: Tapping into Corvina's MMBO of PUDs

    Slide 9: Tapping into Corvina's MMBO of PUDs

    Tapping into Corvina’s 22 MMBO of PUDs 8 www.bpzenergy.com NYSE & BVL: BPZ The New CX-15 Platform Contracts for fabrication signed and work underway Transport and install new platform Commence CX-15 drilling campaign First oil production expected by fourth quarter 2012

  10. Slide 10: The New CX-15 Platform

    Slide 10: The New CX-15 Platform

    The New CX-15 Platform 9 www.bpzenergy.com NYSE & BVL: BPZ First Buoyant Tower in Peru 24 slots Production and reinjection equipment included CX-15 and CX-11 platforms connected via 4 subsea pipelines Design Capacity Product Rate Oil 12,200 bpd Gas 12.8 mmscfd Produced Water 3,500 bpd mmscfd - milli

  11. Slide 11: Exploring Offshore Block Z-1...

    Slide 11: Exploring Offshore Block Z-1...

    Exploring Offshore Block Z-1... Overview 3-D seismic EIA granted Seismic boat selected Complete approved 1,500 sq. km. 3-D seismic survey Process and interpret 3-D seismic data Prepare future exploration campaign 10 www.bpzenergy.com NYSE & BVL: BPZ

  12. Slide 12: ... and Onshore Blocks

    Slide 12: ... and Onshore Blocks

    ... and Onshore Blocks 11 Block XIX Mancora Gas & Heath Oil Approval granted to conduct additional seismic on Block XIX 3-D seismic approval Evaluate alternatives on PLG-1X Block XXIII Mancora Gas, Heath Oil & Eocene Oil 2-D and 3-D seismic completed Interpretation completed Drilling EIA approval Bl

  13. Slide 13: Corporate & Social Responsibility

    Slide 13: Corporate & Social Responsibility

    Corporate & Social Responsibility 12 www.bpzenergy.com NYSE & BVL: BPZ Investing with Social Inclusion CHILDHOOD EDUCATION CULTURE HEALTH ENVIRONMENTAL

  14. Slide 14: Unlocking Further Value

    Slide 14: Unlocking Further Value

    Unlocking Further Value 13 www.bpzenergy.com NYSE & BVL: BPZ Finishing Block Z-1 Partnering Process Opening of Block Z-1 data room Ongoing JV process for Block Z-1 Execute JV agreement for Block Z-1 Further Gas to Power Plant Optionality Starting Blocks XIX and XXIII Partnering Process 2D and 3D Blo

  15. Slide 15: 2012 Capital & Exploratory Expenditures

    Slide 15: 2012 Capital & Exploratory Expenditures

    2012 Capital & Exploratory Expenditures 14 www.bpzenergy.com NYSE & BVL: BPZ Capital Expenditures Projects & Engineering $ 42 MM Corvina (1) $ 30 MM Albacora $ 6 MM Other projects $ 6 MM Corvina CX-15 Developmental Drilling $ 32 MM Other $ 6 MM TOTAL $ 80 MM Exploratory Expenditures (GG&E) (2) Block

  16. Slide 16: Catalysts for Growth

    Slide 16: Catalysts for Growth

    15 www.bpzenergy.com NYSE & BVL: BPZ Field Commerciality Production Optimization 2011-12 Corvina Produce Block Z-1 PUDs Online Since 2011-12 Dec.2010 Workovers Exploration Completed 2012 Î Albacora Build & Install Unlock Value Equipment Corvina Corvina CX-15 2012 Î Being Gas Cap Platform Block Z-1 I

  17. Slide 17: Conclusion

    Slide 17: Conclusion

    Conclusion Manolo Zúñiga President & CEO 16 The BPZ team will be recognized for excellence in exploring, developing and producing oil and gas in the Americas. For additional information please contact: A. Pierre Dubois Investor Relations & Corporate Communications BPZ Energy 580 Westlake Park Blvd.,

  18. Slide 18: Appendix – GAAP Reconciliation

    Slide 18: Appendix – GAAP Reconciliation

    Appendix – GAAP Reconciliation 17 Reconciliation of non-GAAP measure The table below represents a reconciliation of EBITDAX to the Company’s net income (loss), which is the most directly comparable financial measure calculated in accordance with generally accepted accounting principles in the United