  1. Slide 1: Public Meeting

    Slide 1: Public Meeting

    Public Meeting NYSDEC Project ID# 851046 Study Area Characterization Project Update Corning Incorporated March 22, 2017 1

  2. Slide 2: Welcome and Introductions

    Slide 2: Welcome and Introductions

    Welcome and Introductions • Dan Collins – Division Vice President, Corporate Communications, Corning Incorporated • John Sontag Jr. – Project Manager, Weston Solutions, Inc. • Experts in environmental sampling/analysis and remedial design • Engaged by Corning Incorporated • We are here tonight to pr

  3. Slide 3: Outline

    Slide 3: Outline

    Outline • Project Status • Residential Properties Remedial Process • No Further Action Letters • Work Plan Addendum 4 • Pre‐Design Investigation • Approved Interim Remedial Measures • Next Steps 3

  4. Slide 4: Project Status

    Slide 4: Project Status

    Project Status • NYSDEC, in consultation with NYSDOH, has proposed the remedy based on all work completed to date and applicable regulatory criteria • Study Area sampling to date • Completed 1,047 soil borings • 4,929 soil samples analyzed • Sampled 295 of 326 residential properties (that have provi

  5. Slide 5: Residential Properties Remedial Process

    Slide 5: Residential Properties Remedial Process

    Residential Properties Remedial Process No Further Access Action Sampling Agreements Remediation (with SMP if necessary) if necessary 5

  6. Slide 6: No Further Action Letters

    Slide 6: No Further Action Letters

    No Further Action Letters • NYSDEC will determine when a property is eligible to receive a No Further Action (NFA) letter • Property does not require further investigation or remediation • Certain properties are eligible for NFA letters based on sampling conducted to date • Other properties will rec

  7. Slide 7: Work Plan Addendum 4

    Slide 7: Work Plan Addendum 4

    Work Plan Addendum 4 • Portion of the Study Area where previous sampling indicates: • No layer of fill material containing ash, brick and/or glass • Limited surface soil concentrations greater than soil cleanup objectives (SCOs) • Limited sampling approach • Surface soil samples at certain propertie

  8. Slide 8: Pre-Design Investigation in the Residential Area

    Slide 8: Pre-Design Investigation in the Residential Area

    Pre‐Design Investigation in the Residential Area • Additional sampling will be performed at certain properties • Complete characterization sampling at properties with limited or no data • Delineate areas that may require remediation • Property owners will be asked for permission for access to collec

  9. Slide 9: Methods Used

    Slide 9: Methods Used

    Methods Used • Surface soils • Top 2 inches of soil • Hand scoop • Shallow soils • Soil that is 2 inches to 2 feet from the surface • Hand auger or Geoprobe® • Subsurface soils • Down to 15 feet • Rigs using small diameter tube (2 inches) 9

  10. Slide 10: Approved Interim Remedial Measures

    Slide 10: Approved Interim Remedial Measures

    Approved Interim Remedial Measures • Interim Remedial Measures (IRMs) are remedial actions that can be designed to be part of the final remedy and are conducted prior to completion of investigation work. • NYSDEC has approved IRMs for the following properties: • Corning Christian Academy • City of C

  11. Slide 11: IRM Corning-Painted Post School District Property

    Slide 11: IRM Corning-Painted Post School District Property

    IRM Corning‐Painted Post School District Property • An IRM will be performed in areas marked in yellow • 1 foot of soil will be excavated and a new soil cover with grass or sidewalk will be placed over a demarcation layer 11

  12. Slide 12: IRM Corning Christian Academy Property

    Slide 12: IRM Corning Christian Academy Property

    IRM Corning Christian Academy Property • An IRM will be performed in area marked in yellow • 2 feet of soil will be excavated and a new soil cover with grass or a sidewalk will be placed over a demarcation layer 12

  13. Slide 13: IRM City of Corning Memorial Stadium Property

    Slide 13: IRM City of Corning Memorial Stadium Property

    IRM City of Corning Memorial Stadium Property • An IRM will be performed in the areas marked in yellow • 2 feet of soil will be excavated and a new soil cover with grass will be placed over a demarcation layer 13

  14. Slide 14: Overview / Next Steps

    Slide 14: Overview / Next Steps

    Overview / Next Steps • NYSDEC, in consultation with NYSDOH, will finalize the Proposed Decision Documents after considering public comments • Property owners will be asked for permission for access to collect additional samples • Residential properties will be sampled and/or remediated to reach No

  15. Slide 15: How You Can Be Kept Informed

    Slide 15: How You Can Be Kept Informed

    How You Can Be Kept Informed • Document repositories Southeast Steuben County Library NYSDEC Region 8 Office 300 Nasser Civic Center Plaza 6274 Avon‐Lima Rd. (Rtes. 5 and 20) Corning, NY 14830 Avon, NY 14414‐9516 Contact Reference Librarian (607‐936‐3616) Contact Linda Vera (585‐226‐5324) for an app