Alliant Energy Corporation · NASDAQ:LNT

Alliant Energy — Corporate Update (May 2026)

20 slides from Alliant Energy's corporate update, May 2026

  1. Slide 1: Columbia Wind Hampden Township Presentation

    Columbia Wind Hampden Township Presentation May 2026

  2. Slide 2: Agenda

    Agenda 01 About Us 02 Project Background 03 Project Timeline 04 Common Questions 05 Conclude 2

  3. Slide 3: About us

    About us Serving customers with Balanced energy mix safe, reliable and resilient energy 440 communities served 500,000 electric customers 200,000 natural gas customers 1,300+ employees 3 *% based on MWs

  4. Slide 4: Why Columbia County?

    Why Columbia County? • Long-term landowner relationships • Established, successful community relationships/partnerships • Wind fits well with ag • Strong wind resources • Cost-effective grid connection 4

  5. Slide 5: Columbia Wind Project Overview

    Columbia Wind Project Overview Thoughtful siting to minimize disturbance • Less than 2 acres per turbine • ~98% of land in project boundary undisturbed by construction • Continuing to engage with landowners and to refine construction planning and minimize disturbance Project goals • 47 turbines • 27

  6. Slide 6: Columbia Wind Community Benefits

    Columbia Wind Community Benefits Annual Shared Revenue • New tax revenue • Landowner Townships payments $600,817 • Jobs $785,683 43% • Commitment to 57% County community 6

  7. Slide 7: Turbine Technology

    Turbine Technology Tip/Total Height Hub Height Swept Area >1,400 feet 7

  8. Slide 8: Projected Timeline

    Projected Timeline Past 2025 2026 2027 2028 Landowner and Community Outreach Env. and Tech. Studies Permitting & Reg. Operating Agreements Equipment Procurement Engineering Construction 8 *Preliminary, subject to change

  9. Slide 9: Common Questions

    COMMON QUESTIONS Alliant Energy.

  10. Slide 10: Sound and Shadow

    Sound and Shadow Sound • Code*: “wind energy system does not exceed 50 dBA during daytime hours and 45 dBA during nighttime hours.” Plus, post-monitoring and complaint process. • Our commitment: 45 dBA or less at all times Shadow • Code*: no more than 30 hours…mitigation down to 20 hours • Our commi

  11. Slide 11: Notices and Outreach

    Notices and Outreach • Code*: 90 days before filing an application and within 1 mile of a wind turbine • Our Commitment: ‒ Letter notifications within 1 mile of the project boundary. Regularly updating the distribution mail list as we learn of mis-receipt or changes of address. Email notifications a

  12. Slide 12: Decommissioning / End of Project-life

    Decommissioning / End of Project-life • We are following the state process • Our Commitment: Restoration standards plus goal of full recyclability of wind turbines and equipment, including blades 12

  13. Slide 13: Environmental Development Studies

    Environmental Development* Studies • We are following the state process  Critical Issues Analysis  Eagle Surveys • Our commitment:  Small Bird/Avian Use 1) Using a variety of means and methods, Surveys we will avoid, minimize, and monitor  Endangered and (before and after construction) Threatene

  14. Slide 14: Aircraft Detection Lighting System (ADLS)

    Aircraft Detection Lighting System (ADLS) What is it? 14

  15. Slide 15: Aircraft Detection Lighting System (ADLS)

    Aircraft Detection Lighting System (ADLS) How does it work? 15

  16. Slide 16: Contact Us

    Contact Us Open office hours • Wednesday mornings at our local office • 125 East James Street, Columbus Project Phone# • (608) 716-9823 Email • CommunityAffairs@alliantenergy.com Website • www.alliantenergy.com/ColumbiaWind

  17. Slide 17: Thank You

    THANK YOU Alliant Energy.

  18. Slide 18: Sound (visual aid)

    Sound (visual aid) Columbia Wind “…measurements shall be made as near as possible to the outside wall nearest to the closest wind turbine…” -PSC128 18

  19. Slide 19: Shadow (visual aid)

    Shadow (visual aid) 19

  20. Slide 20: Environmental (visual aid)

    Environmental (visual aid) 20 20