European Metals Holdings Ltd · LSE:EMH

European Metals — Benchmark World Tour September 2017

15 slides from European Metals's conference presentation, September 2017

  1. Slide 1: Cinovec: A Globally Significant Lithium Project in the Heart of Europe

    CINOVEC A GLOBALLY SIGNIFICANT LITHIUM PROJECT IN THE HEART OF EUROPE BENCHMARK WORLD TOUR - SEPTEMBER 2017

  2. Slide 2: Disclaimer & Cautionary Statement

    DISCLAIMER & CAUTIONARY STATEMENT DISLAIMER This presentation has been prepared by European Metals Limited (“European Metals” or the “Company”). It is not a disclosure document and should not be considered as an offer or invitation to subscribe for, or purchase any securities in the Company or as an

  3. Slide 3: Cinovec Project

    CINOVEC PROJECT • Cinovec is a globally significant lithium project due to – - Location: In the heart of Europe within close proximity to numerous potential end users. - Size: The largest lithium resource in Europe – fourth largest non-brine lithium resource in the world. - Cost: Low cost producer a

  4. Slide 4: Lithium – New Demand Europe

    LITHIUM – NEW DEMAND EUROPE Cínovec BENCHMARK WORLD TOUR - SEPTEMBER 2017 / 4

  5. Slide 5: Lithium – New Demand Europe

    LITHIUM – NEW DEMAND EUROPE Plans 3 million EVs pa & 50 EV models by 2025. Total spend – EUR 70bn Reports of EUR 10bn battery factory in Leipzig - 150kms from Cinovec EUR 1bn EV program, headquarters in Stuttgart & factory in Leipzig. First EV production in 2019. 50% of all vehicles to be EV by 2023

  6. Slide 6: Lithium – New Demand Europe

    LITHIUM – NEW DEMAND EUROPE Building battery factory in Wroclaw, Poland Building battery factories in Hungary & Austria Specialist Lithium-Ion battery manufacturers, recently began operations in new factory in Ostrava, Czech Republic To build Europe’s largest Lithium-Ion battery factory (US 4bn) in

  7. Slide 7: Cinovec – Location

    CINOVEC – LOCATION • Located in the heart of Europe - ready access to end users. • Large industrial and chemical plants - excellent support services in Czech and Germany. • Rail access - two lines within 10km of the deposit. • Road Access - adjacent to main road. • Power available – 110 KvA transmis

  8. Slide 8: Peer Analysis – Available Resources

    PEER ANALYSIS – AVAILABLE RESOURCES ACTIVE LITHIUM PROJECTS - NON BRINE Comparing total mineral resource for various projects, not mine reserves. Development projects at PFS/FS stage, Greenbushes in production. BENCHMARK WORLD TOUR - SEPTEMBER 2017 / 8

  9. Slide 9: Peer Analysis – Cost of Production

    PEER ANALYSIS – COST OF PRODUCTION Source : Cadence Minerals BENCHMARK WORLD TOUR - SEPTEMBER 2017 / 9

  10. Slide 10: PFS Summary – April 2017 (USD)

    PFS SUMMARY – April 2017 (USD) ANNUAL PRODUCTION 20,800 tpa battery grade Li2CO3 PROJECT LIFE 21 years TOTAL JORC RESOURCE 7.0 mt LCE (4.0 mt Indicated, 3.0 mt Inferred) CONSTRUCTION CAPITAL COSTS $ 393 million OPERATING COSTS ( without credits ) $ 5,211/t Li2CO3 OPERATING COSTS ( with credits ) $ 3

  11. Slide 11: Lithium Processing

    LITHIUM PROCESSING • Process flow sheet for the production of battery grade lithium carbonate • Successfully used to produce > 99.5% Li2CO3 – impurities below industry limits • Process can be adapted to produce lithium hydroxide BENCHMARK WORLD TOUR - SEPTEMBER 2017 / 11

  12. Slide 12: Corporate Snapshot

    CORPORATE SNAPSHOT EMH 12 MONTH SHARE PRICE PERFORMANCE & VOLUME DIRECTORS KEITH COUGHLAN (AUS) DAVE REEVES (AUS) RICHARD PAVLIK (CZ) KIRAN MORZARIA (GB) MANAGING DIRECTOR NON EXECUTIVE CHAIRMAN EXECUTIVE DIRECTOR NON EXECUTIVE DIRECTOR BENCHMARK WORLD TOUR - SEPTEMBER 2017 / 12

  13. Slide 13: The Team

    THE TEAM KEITH COUGHLAN (AUS) DAVE REEVES (AUS) RICHARD PAVLIK (CZ) KIRAN MORZARIA (GB) MANAGING DIRECTOR NON EXECUTIVE CHAIRMAN EXECUTIVE DIRECTOR NON EXECUTIVE DIRECTOR • 30 years experience in mining • Qualified Mining Engineer • GM of Geomet s.r.o. (CZ) • CEO & Director of EMH’s largest finance

  14. Slide 14: Path to Production

    PATH TO PRODUCTION PERMITTING – DRILL HIGH PILOT PLANT MINING & TARGET GRADE ZONES TESTWORK CONSTRUCTION EU GRANTS MINE COMMENCE STRATEGIC PARTNERS COMPLETE PLANNING ENVIRONMENTAL DISCUSSIONS DEFINITIVE WORK – EIA FEASIBILITY STUDY BENCHMARK WORLD TOUR - SEPTEMBER 2017 / 14

  15. Slide 15: Contact

    CONTACT Keith Coughlan | Managing Director Suite 12, 11 Ventnor Avenue, West Perth, WA 6005, AUSTRALIA www.europeanmet.com BENCHMARK WORLD TOUR - SEPTEMBER 2017 / 15

European Metals Holdings — Benchmark World Tour September 2017 on 6ix