86 slides from Fortescue's investor day presentation, Oct 25, 2016

  1. Slide 1: Investor Briefing 2016

    For personal use only Investor Briefing 2016

  2. Slide 2: Forward looking statements

    Forward looking statements For personal use only Important Notice Additional Information The purpose of this presentation is to provide general information about This presentation should be read in conjunction with the Annual Report at 30 Fortescue Metals Group Limited ("Fortescue"). It is not recom

  3. Slide 3: Building a world class company

    Building a world class company Core supplier to China’s growth For personal use only Safety focus First ore Low cost Engagement Empowerment Leadership in 2008 producer Shipped over 165-170mt Production rate 760mt Unique culture 3

  4. Slide 4: Our Vision: The safest, lowest cost, most profitable iron ore producer

    Our Vision: The safest, lowest cost, most profitable iron ore producer v Fortescue i Determination The New Force in Iro! Set yourself stretch targets Enthusiasm Empowerment Generating ideas

  5. Slide 5: Delivering on targets

    Delivering on targets For personal use only Focus on safety, productivity and efficiency  Safety  165-170mt shipped  Productivity + efficiency  Debt repayments  Consistent dividend policy 5

  6. Slide 6: Continuous + sustainable cost improvements

    Continuous + sustainable cost improvements Sept ’16 quarter US$13.55/t – productivity and efficiency delivering cost savings For personal use only US$/wmt 1 Solomon operations 60 50 48 44 2 Blending strategy 58% Fe 40 34 3 Processing, wet plants + de-sands 30 27 15 4 Operational efficiencies 20 10 $

  7. Slide 7: Breakeven price

    Breakeven price For personal use only FY17 continuing to lower all in breakeven price on Platts 62% CFR basis US$/t 40 Fx:0.75 30 2.6 28.3 3.1 22.6 2.5 18.1 1.9 20 0.3 1.3 4.5 12-13 10 - C1 Shipping Royalty Admin Delivered Moisture Dmtu Total dmt Interest Capex Breakeven cost to China adjustments co

  8. Slide 8: Iron ore supply in balance

    For personal use only Mt 20 40 60 80 0 100 120 140 160 180 Jul-10 Sep-10 Nov-10 Jan-11 Source: Bloomberg and Umetal Mar-11 May-11 Jul-11 Sep-11 Nov-11 Jan-12 Mar-12 May-12 Jul-12 Sep-12 Nov-12 Iron ore supply in balance Jan-13 Mar-13 May-13 Jul-13 Sep-13 Nov-13 Price and iron ore port stocks remaini

  9. Slide 9: Moving down the global cost curve

    Moving down the global cost curve For personal use only China's Iron Ore Supply CFR Costs (including royalties & ocean freight) 2012 2016 Source: Metalytics 26 May 2016 9

  10. Slide 10: Fortescue's strategy

    Fortescue’s strategy For personal use only Alignment of marketing and operations to deliver ongoing productivity and efficiency 10

  11. Slide 11: Operations - Nick Cernotta

    For personal use only Operations - Nick Cernotta

  12. Slide 12: Safety / People and culture

    Safety People and culture pC

  13. Slide 13: Safety performance improves year on year

    Safety performance improves year on year For personal use only Significant improvement since FY11 Total Recordable Injury Frequency Rate 16 14.4 Rolling 12 month 14 12 10 9.2 TRIFR 8 7.6 6.0 6 5.1 4.3 4 3.4 2 0 FY11 FY12 FY13 FY14 FY15 FY16 Q1 FY17 13

  14. Slide 14: People and culture

    People and culture Underpinned by our core values For personal use only 14

  15. Slide 15: For personal use only

    For personal use only 15

  16. Slide 16: Reserve portfolio supports asset base

    Reserve portfolio supports asset base use only Significant resource supports reserves and mine life 12,000 3,000 2,463 2,463 2,463 10,000 2,500 2,463 740 740 740 Ore Resource (Mt) For personal Ore Reserves (Mt) 8,000 624 2,000 791 827 903 728 6,000 4,877 4,793 4,755 3,504 1,500 4,000 695 303 491 1,0

  17. Slide 17: Chichester Hub

    Chichester Hub For personal use only Typical section 0 1 S Vertical exaggeration = 10 times Kilometres N Unconsolidated gravels, silts, clays • Bedded mineralisation in the Marra Hardcap Mamba iron formation Mineralised dehydrated and hydrated zones Mineralised Primary zone Microplaty hematite ore z

  18. Slide 18: Solomon Kings Valley iron mineralisation

    Solomon Kings Valley iron mineralisation For personal use only Recent alluvium (gravels and silts) Marginal CID (clay dominant material) Detrital Iron Formation (iron rich alluvium) Basal CID (clay and conglomerates) Oakover Formation (calcrete and silcrete) Lateritised bedrock Upper CID (dominant h

  19. Slide 19: Solomon Typical BID Section

    Solomon For personal use only Typical BID Section • Mineralisation predominantly within the Dales Gorge, Whaleback Shale and Joffre Members of the Joffre Brockman Iron Formation Whaleback Shale • Outcropping mineralisation on the flanks of major hills, with some buried by alluvium along the valley e

  20. Slide 20: Strip ratios

    Strip ratios – FY17 1.1 For personal use only 5 year average strip ratio increases costs ~$1/wmt on current assumptions OPF beneficiation 5 year average Strip Ratios LOM FY17 - FY21 Blending Ore body Chichester 1.5 2.3 Optimisation modelling improving Solomon 1.3 1.8 strip ratios Combined 1.4 2.1 Mi

  21. Slide 21: Innovation and technology

    Safety Innovation and technology @

  22. Slide 22: Fortescue's innovation and technology strategy

    Fortescue’s innovation and technology strategy For personal use only Early adopters and future opportunities for strategic focus areas Solomon Cloudbreak Christmas Creek Autonomous Dewatering OPF optimisation Haulage telemetry Early adopter Integrated Autonomous Drilling Operations Centre Dewatering

  23. Slide 23: Optimising assets

    Optimising assets For personal use only To optimise return on capital that is invested in Assets Operating Philosophy Maintenance Strategy Work Management Reliability Standardisation Technology & Innovation Shutdown Strategy Root Cause Analysis Equipment Perth Operating Centre Contractor Engagement

  24. Slide 24: Cloudbreak

    For personal use only Cloudbreak

  25. Slide 25: Cloudbreak Snapshot

    Cloudbreak For personal use only Snapshot 40mtpa Annual production Approximate total workforce; 1,700 1,200 Fortescue, 500 contractors 2008 First ore Wet front end – improving 2011 beneficiation 25

  26. Slide 26: Blending + beneficiation

    Blending + beneficiation For personal use only Blending with Firetail + wet processing, product grade 57.5% Strip ratio 2.3 New pit limit + + = Production inventory at cut off grade of 54% 26

  27. Slide 27: Solomon

    For personal use only Solomon

  28. Slide 28: Solomon Snapshot

    Solomon Snapshot For personal use only 2 x OPF’s 73mtpa 27mtpa Firetail – dry plant 46mtpa Kings – wet plant Firetail Bedded/detrital product with high Fe and phos blended with low phos from Chichesters Kings CID Fines, a low alumina Kings channel iron product; and Western Fines, a bedded/detrital p

  29. Slide 29: World class autonomous haulage operation

    World class autonomous haulage operation For personal use only First to deploy CAT autonomous technology on a commercial scale > 200 Assets 2013 Safety and Interacting on one system First AHS Truck productivity 240mt 54 Autonomously moved Autonomous trucks 29

  30. Slide 30: Autonomous haulage

    Autonomous haulage For personal use only AHS are 20 per cent more productive than regular fleet of trucks of the same type • Fully integrated • Overburden and ore • Blended stockpiles • Primary crusher feed • Flexibility • Older trucks converted to autonomy 30

  31. Slide 31: Fleet productivity

    Fleet productivity For personal use only AHS are 20 per cent more productive than regular fleet of trucks of the same type Haul truck performance 3,000 2,500 T.KmEFH/cal hr 2,000 1,500 1,000 500 0 Oct-15 Nov-15 Dec-15 Jan-16 Feb-16 Mar-16 Apr-16 May-16 Jun-16 Jul-16 Aug-16 Sep-16 Manned truck AHS tr

  32. Slide 32: Autonomous drilling

    Autonomous drilling For personal use only Leveraging proven technology • First autonomous drill to be operating in December 2016 • Forecasting 23% improvement - 9% increased operating time - 14% increased productivity • Safety improvement 32

  33. Slide 33: Christmas Creek

    For personal use only Christmas Creek

  34. Slide 34: Christmas Creek Snapshot

    Christmas Creek For personal use only Snapshot Average annual production; 60mtpa 2 x Ore Processing Facilities Approximate total workforce 1,830 1,170 Fortescue, 660 contractors CC1 commenced 2010 2010 CC2 commenced 2012 34

  35. Slide 35: OPF initiatives

    OPF initiatives For personal use only Blended stockpiles; cyclone efficiency Wet Yield to 90% Reduce mining costs scavenger cyclone recovery Iron upgrade +103% Reducing cut-off grades Silica upgrade -78% Lowering strip ratios Wet plant density and volume control Secondary and tertiary cycloning Belt

  36. Slide 36: Christmas Creek Operations Centre

    Christmas Creek Operations Centre For personal use only Initiatives • All mining, maintenance and fixed plant operations control • Engineering, planning and quality resource support • Remote crusher rock breakers • Autonomous drilling • Centralised Integrated Control Centre for all site based operat

  37. Slide 37: Christmas Creek plant automation

    Christmas Creek plant automation For personal use only Overview and outcomes 1 Minimise Operator Interface Increasing plant run-time 2 Wet Plant Automation Improving upgrades and yields 3 Dry Plant Automation Maximising throughput 4 Train Load Out Optimise train weight and load times 5 Constraint Co

  38. Slide 38: Rail

    For personal use only Rail

  39. Slide 39: Rail

    Rail For personal use only Shaping our great railway for long-term success Track connecting four mine sites 620km Approximate total workforce 470 380 FMG, 90 contractors 36kt/train 2 loco, 250 ore cars trains Longer 3kms with average cycle time 22hrs Faster 80km/hr speeds Heavier 42t axle loads 39

  40. Slide 40: Virtual train control centre

    Virtual train control centre For personal use only First company in WA to control a railway from outside the region of operation • Virtual control system, no per way signals or transponders • Communications based system with fibre optic backbone • In cab signalling and positive enforcement • Benefit

  41. Slide 41: Condition monitoring management system

    Condition monitoring management system For personal use only A postage stamp of space connects the wheel to the track • Wheel and brake shoe measurement at optimal speed • Measuring on train 2,000 wheels and 2,000 brake shoes in 3 minutes • Measuring on train 55,000 wheels and 55,000 brake shoes a d

  42. Slide 42: Driver assist technology

    Driver assist technology For personal use only Increase in safety, productivity and efficiency • Tendering on cruise control • Application of throttle and brake • Operator remains on the Train • Implementation of 18 to 24 months • Benefits include: – Reduced cycle times – Improved fuel consumption –

  43. Slide 43: Port

    For personal use only Port

  44. Slide 44: Herb Elliot Port

    Herb Elliot Port For personal use only Part of the worlds largest bulk port by annual throughput Australia’s most efficient bulk Port Approximate total workforce 390 250 Fortescue, 140 contractors 3 train loops, 3 TUL’s 36,000tph and 3 stackers unload at a combined rate 3 reclaimers, 3 shiploaders 3

  45. Slide 45: Shiploader automation

    Shiploader automation For personal use only Automation project to improve efficiencies • Radar System detects ore levels in hatch and informs operator to position shiploader • Benefits include – Improved anti-collision protection – Stage 1: Operator Assistance and diminish positioning error – Stage

  46. Slide 46: Shiploader operator assistance

    Shiploader operator assistance For personal use only Phased approach Basic automation Current 1. Anti Collision 2. Loading assistance Developments 100% automation 3. Remote Control 4. Hatch Automation 5. Ship Automation 46

  47. Slide 47: Reclaimer Radar system

    Reclaimer Radar system For personal use only • Radar System detect reclaimer position in the stockpile • Benefits include – Live cutting area measurement • Slew Speed Control • Reduction of Over Torques • Improved Mass Flow – Distance / depth measurements • Improved Face Up Procedure – Edge height d

  48. Slide 48: Shipping - Mark Davidson

    Shipping – Mark Davidson For personal use only 48

  49. Slide 49: Market update

    Market update For personal use only Shipping market remains weak but showing signs of having bottomed Port Hedland to Qingdao $16.00 $12.00 $8.00 $4.00 $0.00 Jan-12 Jan-13 Jan-14 Jan-15 Jan-16 Baltic Capesize Index Route C5 49

  50. Slide 50: Fleet development

    Fleet development For personal use only Consolidation in ship building and ship owning markets Capesize Fleet Development 300 Delivered Scrapped 200 100 0 2008 2009 2010 2011 2012 2013 2014 2015 2016 YTD Simpson Spence Young: Bulk Carrier Net Fleet Changes 50

  51. Slide 51: Performance update

    Performance update For personal use only Target efficient vessels with large deadweight and low draft Vessel Segment Distribution 56% 55% 56% 54% 52% 48% 46% 45% 44% 44% FY13 FY14 FY15 FY16 YTD FY17 >200k DWT Capesize 51

  52. Slide 52: Sustained improvement of turnaround time

    Sustained improvement of turnaround time For personal use only Target of zero demurrage days Demurrage Days Per Vessel 6.39 4.62 2.49 1.31 0.21 -0.36 FY12 FY13 FY14 FY15 FY16 YTD FY17 52

  53. Slide 53: Investment in ships to deliver operational benefits

    Investment in ships to deliver operational benefits For personal use only Very Large Ore Carriers (VLOC) update • 8 VLOCs being constructed at two shipyards in China • Efficient loading at Port Hedland – 261,000 deadweight tonne – 327m in length, 57m beam 53

  54. Slide 54: First vessel delivers to Fortescue end November

    First vessel delivers to Fortescue end November For personal use only • 8 VLOCs 21M tonnes p.a. or 12% of total volume • Contracted at bottom of market - low cost shipping option • Provide exposure to the wider shipping industry 54

  55. Slide 55: Market - David Liu

    For personal use only Market – David Liu

  56. Slide 56: Market

    Safety Innovation and technology People and ee culture #28 fell) 56

  57. Slide 57: Fortescue values relationship with China

    Fortescue values relationship with China For personal use only Four key areas of engagement 57

  58. Slide 58: 13th Five Year Plan

    13th Five Year Plan For personal use only Generating domestic demand for steel for the next five years 3,000km 152,000km New urban rail lines Roads in rural areas High speed rail network Over 50 to cover 80% civilian of cities airports Source: China Daily 58

  59. Slide 59: Steel consumption to build economy

    Steel consumption to build economy Steel demand – driven by policy decisions For personal use only Source: Wood Mackenzie 59

  60. Slide 60: China's One Belt One Road

    China’s One Belt One Road For personal use only Generating regional demand for steel and opportunities for Northern Australia 60

  61. Slide 61: Iron ore market in balance

    Iron ore market in balance For personal use only Market demand for Fortescue ore remains strong • Steel demand driven by property and infrastructure sectors in China • Demand for Fortescue ore remains strong • Iron ore market in balance with low cost seaborne ore displacing domestic • Price realisat

  62. Slide 62: Core supplier to Asia

    Core supplier to Asia For personal use only Well established 18% market share of imported iron ore to China • Low impurity 58% Fe average • High value in use • Large diverse customer base • Reliable consistent delivery • Proximity to high growth region 62

  63. Slide 63: Property and infrastructure driving steel demand

    Property and infrastructure driving steel demand For personal use only Chinese government stimulus and credit expansion pillar of economic support Home sales and prices have increased in 2016 80 40 60 30 % change y-o-y % change y-o-y 40 20 20 10 0 0 -20 Sales (left) Prices (right) -40 -10 01-Sep-10

  64. Slide 64: Iron ore demand robust

    Iron ore demand robust For personal use only Chinese 2016 imports forecast to exceed 1.0 billion tonnes • Seaborne supply slowed over China iron ore imports 2015-2016 100 • Steel fundamentals and iron ore 90 price has seen high cost supply 80 return Million wmt 70 • Domestic mine utilisation in Chin

  65. Slide 65: Lower price realisation in Sept 2016 quarter

    For personal use only $0 $40 $60 $80 $100 $20 29/07/2014 29/08/2014 29/09/2014 29/10/2014 29/11/2014 29/12/2014 Platts 62 CFR 29/01/2015 28/02/2015 31/03/2015 30/04/2015 31/05/2015 30/06/2015 31/07/2015 31/08/2015 MBIO58 [P] CFR 30/09/2015 31/10/2015 30/11/2015 31/12/2015 31/01/2016 29/02/2016 31/03

  66. Slide 66: Finance

    For personal use only Finance

  67. Slide 67: September quarterly

    September quarterly For personal use only Operational performance delivering financial results and cashflows C1 Cost US$700m US$4.2bn Debt repaid Net debt $13.55/wmt 33% gearing 1.8 1.6 Available Sustaining Prioritise cash 1.4 1.2 for debt US$ bn repayment 1.0 Capex for debt 0.8 0.6 0.4 Base liquidi

  68. Slide 68: Quarterly C1 cost performance

    For personal use only 10 15 20 25 30 35 40 45 0 5 FY13 44 FY14 34 US$/wmt Jul-14 Aug-14 Sep-14 Q1 15 32.08 Oct-14 Nov-14 Dec-14 Q2 15 28.48 Jan-15 Feb-15 Mar-15 Q3 15 25.90 Apr-15 May-15 Jun-15 Q4 15 22.16 Jul-15 Aug-15 Sep-15 Quarterly C1 cost performance Q1 16 16.90 Oct-15 Nov-15 Momentum continui

  69. Slide 69: Path to US$12-13/wmt for FY17

    Path to US$12-13/wmt for FY17 For personal use only Continued realisation from efficiency and productivity improvements US$ Productivity and efficiency initiatives including: /wmt US$/wmt 18 • Equipment productivity 16 • Haul route, pit design, mining hygiene, in-pit waste 1.7 Mining 14 dumping ~ 1.

  70. Slide 70: Cost savings delivered

    Cost savings delivered For personal use only US$3.5bn in operating cost savings delivered since achieving full operational capacity US$bn 4.0 0.5 3.0 1.9 2.0 4.0 3.5 0.8 1.0 0.8 - FY14 FY15 FY16 FY14 - FY16 delivered FY17 fcst FY14 - FY17 forecast delivered savings 70

  71. Slide 71: Debt maturity

    Debt maturity For personal use only Flexibility to continue early repayments prior to first maturity in June 2019 6,000 5,000 4,000 US$m 3,000 2,976 2,000 2,160 1,000 0 478 0 CY2016 0 CY2017 CY2018 CY2019 CY2020 CY2021 CY2022 Senior Secured Credit Facility Senior Unsecured Notes Senior Secured Notes

  72. Slide 72: Capital expenditure

    Capital expenditure For personal use only Free cash prioritised to debt with capex sustainable at current levels FY17 Guidance US$m Sustaining capital expenditure • Current low levels of sustaining capex 500 US$2/wmt 400 340 304 • Exploration US$40m 300 200 • Funding nearing completion 100 – VLOCs U

  73. Slide 73: Firetail replacement

    For personal use only Firetail replacement

  74. Slide 74: Firetail replacement - 2021

    Firetail replacement - 2021 For personal use only Options for replacement being developed 74

  75. Slide 75: Western Hub

    Western Hub For personal use only • Eliwana and Flying Fish • 740mt of resources • Prospective areas • Future replacement • Potential other users 75

  76. Slide 76: Nyidinghu

    Nyidinghu For personal use only • 2.5bnt resource • Iron ore central • ~100km to Cloudbreak • 57.4% Fe 76

  77. Slide 77: Supporting our community

    For personal use only Supporting our community

  78. Slide 78: Building strong communities

    Building strong communities For personal use only Creating opportunities through training, employment and business development 32 78

  79. Slide 79: Championing diversity

    Championing diversity For personal use only Workplace culture fundamental 79

  80. Slide 80: Corporate Social Responsibility

    Corporate Social Responsibility For personal use only Integrate sustainable development considerations into corporate decision making process • Fortescue is refreshing its approach in FY17 • Enhanced strategy builds on the highly developed sustainability and community development initiatives in plac

  81. Slide 81: Focussed strategy

    For personal use only Focussed strategy

  82. Slide 82: Moving down the global cost curve

    Moving down the global cost curve For personal use only China's Iron Ore Supply CFR Costs (including royalties & ocean freight) 2012 2016 Source: Metalytics 26 May 2016 82

  83. Slide 83: Strategic delivery

    Strategic delivery For personal use only Culture, continuous improvement, speed and flexibility  Consistent 165-170mtpa  Lowering costs to US$12-13/wmt  Maximising resource value  Debt repayment  Ongoing improvements 83

  84. Slide 84: The new force in iron ore

    The new force in iron ore For personal use only Continuous improvement Sustainable low cost World class producer assets & people Customer focus Unique culture Reliable drives performance Competitive 38

  85. Slide 85: Questions

    For personal use only Questions

  86. Slide 86: For personal use only