El Paso Corp.

El Paso — Q2 2008 Earnings Presentation

61 slides from El Paso's earnings presentation, Aug 6, 2008

  1. Slide 1: Second Quarter 2008 Financial & Operational Update

    Second Quarter 2008 Financial & Operational Update August 6, 2008

  2. Slide 2: Cautionary Statement Regarding Forward-looking Statements

    Cautionary Statement Regarding Forward-looking Statements This presentation includes certain forward-looking statements and projections. The company has made every reasonable effort to ensure that the information and assumptions on which these statements and projections are based are current, reason

  3. Slide 3: Our Purpose

    Our Purpose El Paso Corporation provides natural gas and related energy products in a safe, efficient, and dependable manner

  4. Slide 4: Our Vision & Values

    the place to work the neighbor to have the company to own Our Vision & Values

  5. Slide 5: Six-Month Scorecard: Accomplishments

    Six-Month Scorecard: Accomplishments Pipelines ? Ruby, Line 300 ? Committed project inventory $8 billion ? $1.2 billion future EBITDA* E&P ? Inventory growth ? Haynesville, Niobrara, Altamont, Raton CBM ? Brazil ? Bia/Camarupim accelerating ? Pinauna progressing ? Portfolio ? Divestitures complete H

  6. Slide 6: 2008 Challenges

    2008 Challenges Cost control ? Pipeline ? Steel, contractor ? E&P ? Services, fuel-related Acquisition integration ? E&P ? Employee retention ? Delayed ramp up MTM volatility ? Marketing ? PJM basis Project execution ? Pipeline and E&P ? Significant project inventory

  7. Slide 7: 2008 Outcomes

    2008 Outcomes Earnings ? Improved ? $1.40-$1.50* ? 40%-50% over 2007* EBITDA ? Improved ? $3.8 billion-$3.9 billion Capex ? Higher ? $3.8 billion Inventory ? E&P ? Continued growth ? Pipelines ? Largest ever *Assumes full year average natural gas price of $9.75/MMBtu and average oil price of $118 Bb

  8. Slide 8: Financial Results

    Financial Results

  9. Slide 9: Financial Results: Three Months Ending June

    Financial Results: Three Months Ending June 30 2008 2007 Net Income to Common 865 819 $865 $819 Adjusted EBITDA Diluted EPS from Continuing 2008 2007 EPS-Diluted Continuing 0.25 0.22 $0.25 $0.22 Adjusted Diluted EPS from Continuing 2008 2007 Adjusted EPS Diluted Continuing 0.39 0.29 $0.39 $0.29 EBIT

  10. Slide 10: Items Impacting 2Q 2008 Results

    Items Impacting 2Q 2008 Results Income available to common stockholders Adjustments1 Change in fair value of power contracts Change in fair value of legacy indemnification Other legacy litigation adjustments Change in fair value of production-related derivatives in Marketing Impact of MTM E&P deriva

  11. Slide 11: Business Unit Contribution

    Business Unit Contribution Core Businesses Pipelines E&P Core Businesses Total Other Businesses Marketing Power Corporate & Other Total Three Months Ended June 30, 2008 $ 295 304 $ 599 (153 ) 12 41 $ 499 Adjusted EBITDA* EBIT DD&A EBITDA *Adjusted Pipeline EBITDA for 50% interest in Citrus and adjus

  12. Slide 12: Cash Flow and Capital Investment

    Cash Flow and Capital Investment $ 410 875 1,285 33 1,318 - $ 1,318 $ 1,175 $ 336 $ 659 $ 75 Income from continuing operations Non-cash adjustments Subtotal Working capital changes and other* Cash flow from continuing operations Discontinued operations Cash flow from operations Capital expenditures

  13. Slide 13: Marketing Financial Results

    Marketing Financial Results Strategic Change in fair value of production-related derivatives Other Change in fair value of natural gas derivative contracts Change in fair value of power contracts Settlements, demand charges, & other Operating expenses & other income Other total EBIT EBIT $ Millions

  14. Slide 14: PJM Basis MTM Earnings & Cash Settlements

    PJM Basis MTM Earnings & Cash Settlements Change in MTM Value Cash Settlements

  15. Slide 15: 2008 Natural Gas and Oil Hedge Positions

    2008 Natural Gas and Oil Hedge Positions 0.45 MMBbls $56.40 ceiling/ $55.00 floor Balance at Market Price Ceiling Floor 1.71 MMBbls Average cap $79.54/Bbl 1.71 MMBbls Average floor $79.17/Bbl Note: See full Production-Related Derivative Schedule in Appendix 98 TBtu Average cap $10.23/MMBtu 81 TBtu $

  16. Slide 16: 2009 Natural Gas and Oil Hedge Positions

    Balance at Market Price Note: See full Production-Related Derivative Schedule in Appendix 151 TBtu Average cap $14.97/MMBtu 8 TBtu $7.36 fixed price 176 TBtu Average floor $9.02/MMBtu Ceiling Floor 3.43 MMBbls $109.93 fixed price 2009 Gas 2009 Oil 2009 Natural Gas and Oil Hedge Positions 143 TBtu $1

  17. Slide 17: Pipeline Group

    Pipeline Group

  18. Slide 18: 2Q Highlights

    2Q Highlights EBIT: $295 MM Throughput increased 6% from 2007 Significant progress on growth projects Ruby Pipeline TGP Line 300 Expansion CIG Raton 2010 WIC expansion Committed backlog increased to $8 billion

  19. Slide 19: Pipeline Group Financial Results

    Pipeline Group Financial Results EBIT before minority interest Less minority interest EBIT EBITDA Adjusted EBITDA1 Capital expenditures Acquisitions2 Three Months Ended June 30, 2008 2007 $ 303 8 $ 295 $ 394 $ 428 $ 266 $ - $ 318 - $ 318 $ 409 $ 445 $ 232 $ - $ Millions 1Adjusted Pipeline EBITDA for

  20. Slide 20: Continued Throughput Increase

    Continued Throughput Increase YTD T-put 9 2 7 5 TGP Elba deliveries to Florida SNG 7% 9% EPNG CIG Rockies supply, expansions 6% overall increase 5% Independence Hub Note: CIG includes Colorado Interstate Gas, Cheyenne Plains and Wyoming Interstate EPNG includes El Paso Natural Gas and Mojave 2% Cali

  21. Slide 21: El Paso Backlog: Large and Profitable

    CIG High Plains Pipeline $216 MM (100%) December 2008 900 MMcf/d TGP Carthage Expansion $39 MM May 2009 100 MMcf/d SNG South System III/ SESH Phase II $352 MM / $69 MM 2011-2012 370 MMcf/d / 350 MMcf/d Elba Expansion III & Elba Express $1.1 Billion 2010-2013 8.4 Bcf / 0.9 Bcf/d & 1.2 Bcf/d SNG Cypre

  22. Slide 22: Ruby Pipeline Update

    Ruby Pipeline Update Malin Opal Hub UT NV OR CO ID CA WY CIG Kern River Paiute Tuscarora PG&E WIC Cheyenne Plains Cheyenne Uinta Basin Piceance Basin 670 miles of 42" pipeline $3 billion capex 1.3-1.5 Bcf/d capacity 2011 in-service Market commitments of 1.1 Bcf/d 100% of pipe ordered Incentive-based

  23. Slide 23: TGP Line Expansion

    TGP Line 300 Expansion 125 miles of 30" looping 15-year contract for 290 MMcf/d with Equitable Energy LLC $750 MM capex 2010-2011 in-service Locked in pipe prices Marcellus Interconnects EQT Production NY PA WV OH KY CT MA RI NH VT MI NJ VA REX-TGP Interconnect

  24. Slide 24: Pipeline Summary

    Pipeline Summary Committed backlog $8 billion Highly focused on project execution On track to achieve 2008 EBIT & EBITDA targets

  25. Slide 25: Exploration & Production

    Exploration & Production

  26. Slide 26: 2Q Highlights

    *Pro forma basis; see appendix for reconciliation 2Q Highlights Improved earnings 4% sequential quarter production growth* Continued improvement in controllable unit costs Expanding domestic programs Increasing capital by $200 MM Haynesville and Niobrara Shale Cotton Valley horizontal test successfu

  27. Slide 27: E&P Results

    E&P Results EBIT1 EBITDA1 Adjusted EBITDA2 Capital expenditures Acquisition capital $ 304 501 535 400 43 2007 2008 Three Months Ended June 30, $ 235 424 451 383 16 1Three months ended includes MTM losses on derivatives of $75 MM in 2008 and $5 MM in 2007. Cash paid related to settlements of these de

  28. Slide 28: 97% Drilling Success Rate

    97% Drilling Success Rate High Low Risk 2008 YTD Gross Wells Completed 0% 83% 99% Actual Success Rate 4 12 222 238 97% PC > 80% Low Risk Domestic Development and Pinauna & Bia/Camarupim Development PC < 40% High Impact Exploration Med PC 40%-80% Medium Risk Development and Exploration Increasing cap

  29. Slide 29: Total Cash Costs

    Total Cash Costs $/Mcfe 2Q 2007 1Q 2008 2Q 2008 Direct Lifting Costs 0.85 0.819 0.79 General & Administrative 0.68 0.643 0.63 Taxes Other Than Production & Income 0.06 0.041 0.05 0.2 0.2 0.2 Production Taxes 0.333 0.418 0.54 $1.92 $0.06 $0.68 $0.33 $0.85 $1.92 $0.04 $0.64 $0.42 $0.82 $0.79 $0.54 $0.

  30. Slide 30: 2Q Production Update

    2Q Production Update Note: Includes proportionate share of Four Star equity volumes Appendix includes details on non-GAAP terms *Excludes volumes from domestic assets sold in 2008 and assumes full year of Peoples in 2007 MMcfe/d 2Q 2007 1Q 2008 2Q 2008 Central 295 316 308 Western 144 149 155 TGC 202

  31. Slide 31: Peoples Acquisition Update

    Peoples Acquisition Update Acquisition Rationale Increased scale and efficiency Adds significant drilling inventory Lower lifting costs Current Status Drilled 51 wells thru 2Q08 Expect 95-100 by YE08 Production growth delayed, lower initial activity levels Actively pursuing new opportunities Haynesv

  32. Slide 32: Arklatex Update

    Arklatex Update 2008 Conventional Program 125-130 gross wells ~ $350 MM net capital 8-9 rigs running and growing Cotton Valley Horizontal Testing horizontal drilling 1 well drilled and completed 4.4 MMcfe/d initial 30-day average Additional 30 gross locations currently identified; potential applicat

  33. Slide 33: Haynesville Shale

    Haynesville Shale Miller Land Co-H10#1 Completion underway 11,700' 11,500' 10,000' 9,000' 6,700' 5,300' Rodessa Hosston Cotton Valley Bossier Shale Haynesville Shale Haynesville Lime 3,100' Perforations

  34. Slide 34: Raton Update

    Raton Update 2008 CBM Program 84 gross wells $46 MM net capital CBM Increased Density Drilling Pursuing 80-acre spacing Hearing held in July with state of New Mexico Would add 500 gross locations and 250 Bcfe risked resource potential Niobrara Shale Exploration 3 wells drilled and completed 2 horizo

  35. Slide 35: Niobrara Shale

    Niobrara Shale 5,000' 4,000' 3,000' 2,000' 1,000' Pierre Shale Niobrara C Shale Niobrara B Shale Niobrara A Shale Trinidad Coal Vermejo Coal Raton Coal Typical CBM well VPR D-95A 1.8 MMcf/d VPR E-17A 1.0 MMcf/d VPR A-6A 0.4 MMcf/d Perforations 3,900' 3,000'

  36. Slide 36: Altamont-Bluebell Update

    Altamont-Bluebell Update 2008 Program 8 gross wells drilled 36 recompletions $66 MM net capital Roll-up Acquisition Consolidates WI in operated assets Closed in 2Q 2008 1.6 MMBOE of proven reserves Includes remaining interest in Altamont gas plant Increased Density Drilling Pursuing 160-acre spacing

  37. Slide 37: Bia/Camarupim Development Project

    Gas Discovery well Bia/Camarupim Development Project Overview: Petrobras operated with 24% EP working interest 35-50 MMcfe/d net peak production 100-120 Bcfe net resources $135 MM net capital total Gas price indexed to basket of imported fuel oils First gas in 1Q 2009 4 development wells 4-ESS-177 6

  38. Slide 38: Bia/Camarupim Development Project Status

    Bia/Camarupim Development Project Status: Commercial negotiations in final phase Unitization agreement & plan of development subject to regulatory approval Priority project for government with development activities underway 12" pipeline to PLEM completed & 24" pipeline being installed FPSO in yard

  39. Slide 39: Pinauna Development Project

    Pinauna Development Project Statistics: 15-20 MBOE/d peak production 59-90 MMBOE total resource potential $700 MM-$750 MM total capital 100% WI Attractive returns at plan prices ($70/Bbl) Resource Outlook Oil Gas 1-BAS-64 1-BAS-73 1-BAS-74 1-ELPS-160 1-ELPS-170A Pinauna Cacau Acai Acai East 0 1.5 2.

  40. Slide 40: Pinauna Development

    Pinauna Development 3 Km-6" HP Oil, Gas Subsea Pipelines Development Scope 4 Horizontal producers 4 Horizontal Water Injectors 1 Gas Producer WD = 20m Utility MOPU Acai/Cacau Wellhead Platform Pinauna Wellhead Platform Project Status: Executed FSO letter of intent Awaiting approval of Terms of Refer

  41. Slide 41: E&P Summary

    E&P Summary Inventory growing Peoples (Arklatex, TGC) Haynesville & Niobrara shale Brazil, Egypt Projects advancing Bia/Camarupim faster than expected Pinauna Altamont-Bluebell Domestic activity increasing in 2H 2008 Maintain current rig activity Advance new opportunities Improve exit rate On track

  42. Slide 42: Summary

    Summary Earnings and cash flow up Pipelines $8 billion backlog Long-term growth 10%+ E&P Inventory continues to grow Brazil accelerates 2009 volume growth Progress on all fronts

  43. Slide 43: Second Quarter 2008 Financial & Operational Update

    Second Quarter 2008 Financial & Operational Update August 6, 2008

  44. Slide 44: Appendix

    Appendix

  45. Slide 45: Disclosure of Non-GAAP Financial Measures

    Disclosure of Non-GAAP Financial Measures The SEC's Regulation G applies to any public disclosure or release of material information that includes a non-GAAP financial measure. In the event of such a disclosure or release, Regulation G requires (i) the presentation of the most directly comparable fi

  46. Slide 46: 46

    46

  47. Slide 47: Segment Information (Unaudited)

    EL PASO CORPORATION ‘SEGMENT INFORMATION (UNAUDITED) 208 2007 Yeario aie un tions) Fisi_ Second | Fist Second Thu Foun | 2008 2007 (operating evenves Popes s ms els os us 06s 650s 1366 $1288 Exploration and Production eos 655 505 575 575 eas} 12581080 Marking (7) (448) (135) (8) ® 9] aos) a8) Compra

  48. Slide 48: Financial Results

    Financial Results EBIT Interest and debt expense Income before income taxes Income taxes Income from continuing operations Discontinued operations, net of income taxes Net income Preferred stock dividends* Net income available to common stockholders Diluted EPS from continuing operations Diluted EPS

  49. Slide 49: 2008 Analysis of Working Capital and Other Changes

    2008 Analysis of Working Capital and Other Changes $ 51 406 (256 ) (112 ) (41 ) (15 ) $ 33 Margin collateral Changes in price risk management activities Settlements of derivative instruments Net changes in trade receivable/payable Settlement of liabilities Other Total working capital changes & other

  50. Slide 50: Items Impacting YTD 2008 Results

    Items Impacting YTD 2008 Results Income available to common stockholders Adjustments1 Change in fair value of power contracts Change in fair value of legacy indemnification Case Corporation indemnification Gain on sale of portion of telecommunications business Other legacy litigation adjustments Cha

  51. Slide 51: Items Impacting 2Q 2007 Results

    Items Impacting 2Q 2007 Results Net income available to common stockholders Adjustments1 Debt repurchase costs Change in fair value of production-related derivatives in Marketing Discontinued operations Adjusted EPS-Continuing operations2 $ 86 (9 ) 5 Pre-tax $ 156 $ 55 (6 ) 3 After-tax $ 0.22 $ 0.08

  52. Slide 52: Items Impacting YTD 2007 Results

    Items Impacting YTD 2007 Results Net income available to common stockholders Adjustments1 Debt repurchase costs Change in fair value of production-related derivatives in Marketing Sale of ANR and related assets Effect of change in number of diluted shares2 Adjusted EPS-Continuing operations2 $ 287 7

  53. Slide 53: Business Unit Contribution

    Business Unit Contribution Core Businesses Pipelines E&P Core Businesses Total Other Businesses Marketing Power Corporate & Other Debt Repurchase Other Total Three Months Ended June 30, 2007 $ 318 235 $ 553 5 16 (86) (18) $ 470 Adjusted EBITDA* EBIT DD&A EBITDA *Adjusted Pipeline EBITDA for 50% inte

  54. Slide 54: Business Unit Contribution

    Business Unit Contribution Core Businesses Pipelines E&P Core Businesses Total Other Businesses Marketing Power Corporate & Other Total Year-to-date Ended June 30, 2008 $ 676 546 $ 1,222 (213 ) 10 80 $ 1,099 Adjusted EBITDA* EBIT DD&A EBITDA *Adjusted Pipeline EBITDA for 50% interest in Citrus and a

  55. Slide 55: Reconciliation of EBIT/EBITDA

    Reconciliation of EBIT/EBITDA EBITDA Less: DD&A EBIT Interest and debt expense Income before income taxes Income taxes Income from continuing operations Discontinued operations, net of taxes Net Income Preferred stock dividends* Net income available to common stockholders $ 797 298 499 (221 ) 278 87

  56. Slide 56: Reconciliation of Adjusted Pipeline EBITDA

    Reconciliation of Adjusted Pipeline EBITDA $ 19 13 10 12 (1) $ 53 $ 394 53 19 $ 428 Citrus equity earnings 50% Citrus DD&A 50% Citrus interest 50% Citrus income taxes Other* 50% Citrus EBITDA El Paso Pipeline EBITDA Add: 50% Citrus EBITDA Less: Citrus equity earnings Adjusted Pipeline EBITDA Citrus

  57. Slide 57: Reconciliation of Adjusted E&P EBITDA

    Reconciliation of Adjusted E&P EBITDA $ 16 5 - 15 14 $ 50 $ 501 50 16 $ 535 Four Star equity earnings Proportionate share of Four Star DD&A Proportionate share of Four Star interest Proportionate share of Four Star income taxes Other3 Proportionate share of Four Star EBITDA El Paso E&P EBITDA Add: P

  58. Slide 58: E&P Cash Costs per Unit

    Per Unit ($/Mcfe) 2Q 2007 $ 4.84 (2.64 ) (0.22 ) (0.06 ) - $ 1.92 71,493 $ 346 (189 ) (15 ) (4 ) - E&P Cash Costs Total operating expense Depreciation, depletion and amortization Transportation costs Costs of products Other Per unit cash costs* Total equivalent volumes (MMcfe)* *Excludes volumes and

  59. Slide 59: Production-Related Derivative Schedule

    Production-Related Derivative Schedule Designated-EPEP Fixed price-Legacy Fixed price Ceiling Floor Economic-EPEP Fixed price Ceiling Floor Avg. ceiling Avg. floor Designated-EPEP Fixed price Economic-EPEP Fixed price Economic-EPM Ceiling Floor Avg. ceiling Avg. floor 2.3 10.6 62.9 62.9 3.7 18.4 18.

  60. Slide 60: Reconciliation of Pro Forma Production Volumes

    Reconciliation of Pro Forma Production Volumes Equivalents, MMcfe/d Central Western TGC GOM/SLA International Total consolidated Proportionate share of Four Star Total with Four Star 224 144 202 202 14 786 71 857 31 8 32 1 - - 72 - - 72 Reported Add: Peoples Less: Domestic Assets Sold Pro Forma* 15

  61. Slide 61: PJM Basis Description

    PJM Basis Description Exposure to Day-Ahead price differentials between PJM West Hub and 4 locations within East Hub Total exposure equals 20 MM MWh and extends through April 2016 Energy typically flows from supply areas in West Hub to high demand areas in East Hub East-West spread settlements drive