Gpt Infraprojects Limited · NSE:GPTINFRA

Gpt Infraprojects — Q2 FY22 Earnings Presentation

28 slides from Gpt Infraprojects's earnings presentation, Nov 3, 2021

  1. Slide 1: GPT Infraprojects Limited

    GPT Infraprojects Limited Regd. Office : GPT Centre, JC-25, Sector-III, Salt L ake, Kol kata – 700 106, India CIN: L20103WB1980PLC032872 Tel: +91 -33-4050-7000 F ax: +91 -33-4050 -7999 Email: info @gptgroup. co.in V isit us: www.gptinfra .in GPTINFRA/CS/SE/2021-22 November 03, 2021 The Department of

  2. Slide 2: Q2FY22 Investors' Presentation

    Q2FY22 Investors’ Presentation GPT Infraprojects Limited

  3. Slide 3: Safe Harbour

    Safe Harbour • This presentation and the accompanying slides (the “Presentation”), which have been prepared by GPT Infraprojects Limited (the “Company”), have been prepared solely for information purposes and do not constitute any offer, recommendation or invitation to purchase or subscribe for any

  4. Slide 4: Agenda

    AGENDA 1 Key Highlights Form The Quarter 2 About The Company 3 Detailed Financial Statement 4 Details From Order Book 3

  5. Slide 5: 1. Key Highlights – H1 FY22

    1. Key Highlights – H1 FY22 GPT Infraprojects Limited 4

  6. Slide 6: Executive Summary

    Executive Summary Revenue EBITDA ₹ 245.3 Cr ₹ 39.1 Cr 17.7% 7.0% H1FY22: The pace of order execution continued with renewed impetus in Q2FY22, while maintaining the profitability. Profit After Tax EBITDA Margin ₹ 8.9 Cr 15.9% Outlook: The momentum maintained in H1FY22 despite the second wave, valida

  7. Slide 7: Business Segment Update – H1 FY22

    Business Segment Update – H1 FY22 Revenue EBIT Order Book Infrastructure Healthy Order book at ₹ 197.3 Cr ₹33.7 Cr ₹ 1595 Cr; Order intake of Revenue growth led by Margin expansion of 6% led 74% higher execution of large 94% by higher share of large 92% ₹ 156Cr in H1FY22. Execution in Gazipur, contr

  8. Slide 8: Business Segment Update

    Business Segment Update Revenue EBIT 245.3 33.7 31.6 208.0 197.3 27.5 27.7 168.7 133.0 128.0 17.9 117.0 16.9 15.8 16.1 16.9 106.4 15.5 101.6 95.7 48.0 32.8 39.6 27.0 15.2 2.6 2.0 0.7 1.3 1.3 Q2FY21 Q1FY22 Q2FY22 H1FY21 H1FY22 Q2FY21 Q1FY22 Q2FY22 H1FY21 H1FY22 Total Infrastructure Concrete Sleepers

  9. Slide 9: Robust Order Book – ₹ 1,732 Cr as on 30.09.2021

    Robust Order Book – ₹ 1,732 Cr as on 30.09.2021 Healthy Order Book of ₹1,732 Cr, forming 3 times FY21 Revenue provides growth visibility. Detailed Order Book is in annexure GPT Infraprojects Limited 8

  10. Slide 10: Order Book - Segment Mix

    Order Book - Segment Mix Infrastructure Concrete Sleepers ₹ 1595 Cr ₹ 137 Cr 5% 12% 18% 92% 70% 38% 8% 57% 70% DFCC Roads, Bridges, Airport and highway Steel Bridges Indian Railways Industrial Africa GPT Infraprojects Limited 9

  11. Slide 11: Reducing Old Receivables

    Reducing Old Receivables ₹ 49 Cr • Year on Year improvement on leverage and liquidity position • We have been optimising our working capital and in addition to pairing old outstanding with various customer. ₹ 25 Cr • Significant reduction of some old outstanding from various customer are in place ₹

  12. Slide 12: Sectoral Update

    Sectoral Update The total project capital expenditure in infrastructure sectors in India during the fiscals 2020 to 2025 is projected at ~ Rs 102 lakh crore. The sector-wise annual projected capital expenditure is detailed below. During fiscals 2020 to 2025, sectors such as energy (24%), urban (16%)

  13. Slide 13: 2. About The Company

    2. About The Company GPT Infraprojects Limited 12

  14. Slide 14: About Us

    About Us • GPT Infraprojects Limited is a mid-sized infrastructure 1. INFRASTRUCTURE construction company • The Company is focused on projects related to railways roads, power and industrial sectors • The Company’s operations are spread across three countries • The Company works with some of the mos

  15. Slide 15: 1. Infrastructure

    1. Infrastructure Roads, bridges & Steel Bridges Highways Building of mega Construction of bridges elevated bridges with super steel metro structures and concrete structures across varies pavement for airports terrains Industrial Railway Tracks Construction of railway sidings, Gauge Conversion of me

  16. Slide 16: 2. Concrete Sleepers

    2. Concrete Sleepers Monoblock and pre- One of the first few Manufacturing Also addressing orders Business stressed concrete companies in India to capacity of from Bangladesh, Commenced in 1982 sleepers manufacturer manufacture concrete ~20,00,000 units Mozambique, Sri Lanka sleeper across India & A

  17. Slide 17: Our Team

    Our Team Dwarika Prasad Tantia Shree Gopal Tantia Atul Tantia Vaibhav Tantia Chairman Managing Director Executive Director & CFO Director & COO • With an experience of • 35 years experience • Graduated Magna Cum • Graduated Summa Cum over 45 years, he leads in infrastructure Laude from Wharton Laude

  18. Slide 18: Our Independent Board of Directors

    Our Independent Board of Directors Kashi Prasad Khandelwal Shankar Jyoti Deb Mamta Binani Sunil Patwari Independent Director Independent Director Independent Director Independent Director Is a fellow member and Holds a Bachelor’s A fellow member and Holds PGDM degree from holds certificate of degree

  19. Slide 19: Our Clientele

    Our Clientele Railway & PSU NHAI, State PWD & Other Departments Global Customer Base Other Key Customers RICON (a JV of RITES & IRCON) GPT Infraprojects Limited 18

  20. Slide 20: 3. Detailed Financial Statement

    3. Detailed Financial Statement GPT Infraprojects Limited 19

  21. Slide 21: Profit & Loss - Standalone

    Profit & Loss - Standalone Particulars (₹ Cr) Q2FY22 Q2FY21 y-o-y % Q1FY22 q-o-q % H1FY22 H1FY21 y-o-y % Revenue 128.5 133.1 -3.4% 116.8 10.0% 245.3 208.3 17.8% Other income 1.7 1.2 43.4% 1.0 79.8% 2.7 2.3 15.0% Net Sales 130.2 134.3 -3.0% 117.8 10.6% 248.0 210.6 17.7% Operating expenses 110.4 112.9

  22. Slide 22: Profit & Loss - Consolidated

    Profit & Loss - Consolidated Particulars (₹ Cr) Q2FY22 Q2FY21 y-o-y % Q1FY22 q-o-q % H1FY22 H1FY21 y-o-y % Revenue 128.4 145.5 -11.7% 121.5 5.7% 249.9 226.4 10.4% Other income 0.6 0.6 -6.6% 1.0 -39.9% 1.5 3.5 -56.4% Net Sales 129.0 146.1 -11.7% 122.5 5.3% 251.5 229.9 9.4% Operating expenses 111.9 12

  23. Slide 23: Balance Sheet - Standalone

    Balance Sheet - Standalone Liabilities (Rs Cr) Mar’21 Sep’21 Assets (Rs Cr) Mar’21 Sep’21 Share Capital 29.0 29.0 Fixed Assets incl. CWIP 73.7 74.5 Reserves 178.8 184.6 Investment in JV 24.2 24.2 Shareholders' Funds 207.9 213.6 Other Non Current Assets 97.0 93.7 Secured Loans 32.3 28.7 Trade payable

  24. Slide 24: 4. Details From Order Book

    4. Details From Order Book GPT Infraprojects Limited 23

  25. Slide 25: Details of Order Book

    Details of Order Book Key Projects Bagged during FY21 Key Projects Under Execution in the Current Fiscal Additional Order Inflow in H1FY22 – ₹156 Cr Value Value Scope of Work Segment City/State Scope of Work Client (Rs Cr) (Rs Cr) Jhansi, Infrastructure Construction of Important bridge Infra Uttar 2

  26. Slide 26: Project Sites

    Project Sites Kalpi Project Dhaulpur Project Constructing railway bridge Executed Caissons for Double – D well foundation in a perennial river Condition GPT Infraprojects Limited 25

  27. Slide 27: Our Worksite

    Our Worksite Rail Vikas Nigam Limited - Construction of Roadbed, Superintending Engineer, Viaduct, Major & Minor Bridges, RUBs, Track Linking & National Highway Construction General Electrical Works at both approaches of Rail of ROB at Topsi - Pandeswar cum Road Bridge at Ghazipur Rail Vikas Nigam L

  28. Slide 28: GPT Infraprojects Limited – Contact

    GPT Infraprojects Limited (BSE / NSE CODE: 533761 / GPTINFRA) Stellar IR Advisors Pvt. Ltd. (Investor Relations) Atul Tantia Gaurang Vasani atul@gptgroup.co.in vgaurang@stellar-ir.com Pooja Agarwal Pooja Sharma pooja.a@gptgroup.co.in pooja.sharma@stellar-ir.com GPT Infraprojects Limited CIN: L20103W