Osisko Gold Group Inc. · TSXV:OGG

Osisko Gold — Osisko Development — Investor Presentation (February 2023)

56 slides from Osisko Gold's investor presentation, February 2023

  1. Slide 1: A Premier North American Gold Mining Company

    A PREMIER NORTH AMERICAN GOLD MINING COMPANY INVESTOR PRESENTATION NYSE: ODV | TSXV: ODV www.osiskodev.com FEBRUARY 2023

  2. Slide 2: Cautionary Statements: Forward-Looking Information

    CAUTIONARY STATEMENTS CAUTIONARY STATEMENT REGARDING FORWARD-LOOKING INFORMATION This presentation (this "Presentation") contains forward-looking information and forward-looking statements (together, "forward-looking statements") within the meaning of applicable Canadian securities laws and the Unit

  3. Slide 3: Cautionary Statements: Non-IFRS Measures

    CAUTIONARY STATEMENTS NON-IFRS MEASURES ODV used in this Presentation, certain non-IFRS measures including, “all-in sustaining cost” or "AISC“ and “total cash cost”. All-in sustaining cost per gold ounce is defined as production costs less silver sales plus general and administrative, exploration, o

  4. Slide 4: Cautionary Statements: Scientific and Technical Information

    CAUTIONARY STATEMENTS SCIENTIFIC AND TECHNICAL INFORMATION The scientific and technical information in this Presentation relating to the Cariboo Gold Project is supported by a technical report entitled "NI 43-101 Technical Report – Feasibility Study for the Cariboo Gold Project” and dated January 12

  5. Slide 5: Investment Highlights

    INVESTMENT HIGHLIGHTS Building a Premier North American Mid-tier Gold Mining Company HIGH-QUALITY ADVANCED BROWNFIELD PROJECTS IN TIER 1 JURISDICTIONS Assets located in North America with access to brownfield infrastructure benefitting from grid power and skilled labour pools WORLD-CLASS TEAM LED BY

  6. Slide 6: Premier Mining Jurisdictions

    PREMIER MINING JURISDICTIONS Brownfield properties with existing accessible infrastructure and meaningful exploration upside 100% CARIBOO GOLD PROJECT (BC, CANADA) Ownership Feasibility Study Completed (Jan 2023) | Advancing Mine Permitting ▪ 2.0 Moz reserves (16.7 Mt at 3.8 g/t Au) | 1.6 Moz M&I re

  7. Slide 7: Executing on Our Vision & Strategy

    EXECUTING ON OUR VISION & STRATEGY INTERMEDIATE JUNIOR PRODUCER GOLD PRODUCER DEVELOPER TINTIC PROJECT 350 – 500 ADVANCING HIGH-GRADE TRIXIE 100 – 250 KOZ PER YEAR KOZ PER YEAR CARIBOO GOLD FEASIBILITY STUDY PRICE / NAV (x)1 1.1x POTENTIAL 0.9x RE-RATE 0.8x 0.7x 0.6x 0.5x 0.4x ODV All Peers Tier I P

  8. Slide 8: Executing on Our Strategy – 2023 in Focus

    EXECUTING ON OUR STRATEGY – 2023 IN FOCUS Path to Building an Intermediate Gold Producer Q1 2023 Q2 2023 Q3 2023 Q4 2023 FEASIBILITY STUDY ENVIRONMENTAL SECURE ASSESSMENT PERMITTING PROJECT CARIBOO BEGIN COMPLETED COMPLETION FINANCING GOLD PROJECT TARGET FINANCING PROCESS ✓ ✓ TINTIC INITIAL DECLINE

  9. Slide 9: Capital Structure Snapshot

    CAPITAL STRUCTURE SNAPSHOT OSISKO DEVELOPMENT CORP.1,2 SHAREHOLDER OWNERSHIP Current Share Price (closing price on Feb 3, 2023) C$8.08 /share 19% Basic Shares Outstanding 75.6 million Institutional 44% Options, DSUs, and RSUs 3.0 million Investors Osisko Gold Warrants3 24.0 million Royalties Fully D

  10. Slide 10: Best in Class ESG

    BEST IN CLASS ESG Committed to responsible mining practices, strong relationships, and mutual support with all partners ENVIRONMENT INDIGENOUS NATIONS ▪ Osisko Development constructed two water treatment plants ▪ Positive relationship with Lhtako Dené Nation since 2015. to treat contact water and ef

  11. Slide 11: Tintic Project

    TINTIC PROJECT Utah, USA 100% ODV ownership NYSE: ODV | TSXV: ODV www.osiskodev.com 11

  12. Slide 12: Tintic Project: Asset Snapshot

    TINTIC PROJECT: ASSET SNAPSHOT LOCATION / OWNERSHIP MINE TYPE METALS STAGE LAND PACKAGE 100% ODV Utah, USA Underground Gold, Silver Initial Resource ✓ >17,000 acres of Cu, Pb, Zn (Q1 2023) patented (private) claims North WELL-ENDOWED HISTORICAL MINING DISTRICT Lily Eureka Tintic Standard  Located 9

  13. Slide 13: Trixie Initial Mineral Resource Estimate

    TRIXIE INITIAL MINERAL RESOURCE ESTIMATE (“MRE”) TRIXIE MINERAL RESOURCES ESTIMATE – January 10, 20231 RESOURCE TONNES METAL GRADE CONTAINED METAL HIGH-GRADE DEPOSIT CATEGORY (000’s) (g/t Au) (g/t Ag) (000’s oz Au) (000’s oz Ag)  28.1 g/t gold in the M&I Resources MEASURED 11 190.61 195.53 67 69 ca

  14. Slide 14: Underground Ramp Development ~50% Complete

    UNDERGROUND RAMP DEVELOPMENT ~50% COMPLETE Completion of the ramp by Q2 2023 a critical path item in unlocking value at Trixie RAMP DEVELOPMENT: ~1,390 M (4,550 ft.) 3 HISTORIC MINERALIZED ZONES OPEN AT DEPTH AND STRIKE RAMP FROM SURFACE TO 625 LEVEL 756 610 SOUTH SURVEY ORE SHOOT ORE SHOOT VEIN  E

  15. Slide 15: Trixie Exploration Potential

    TRIXIE EXPLORATION POTENTIAL Initial MRE at Trixie represents a very small footprint of the overall underground potential SOUTH NORTH Trixie MRE TRIXIE INITIAL MRE1  380 meter strike length  85 meter width Empire State  140 meter depth building for scale (~4 football fields) NORTH SOUTH INITIAL M

  16. Slide 16: Trixie Exploration Potential

    TRIXIE EXPLORATION POTENTIAL West 1 East TRIXIE MINERALIZATION Quartz Stockwork OVERVIEW T2 T4  High-sulphidation epithermal mineralization structurally Footwall controlled and hosted within the brittle Tintic Quartzite Breccia 2  Mineralization capped by impermeable shales of the Lower Ophir Form

  17. Slide 17: Sampling and Drilling Have Shown Continuity of T2 / T4

    SAMPLING AND DRILLING HAVE SHOWN CONTINUITY OF T2 / T4 Only ~25% of assay results received from RC and DD drilling completed in 2022 TRIXIE CROSS SECTION High-grade gold results greater than 100 g/t are present throughout the entire 2022 DRILLING LOOKING NORTH2 sampled area, on all levels, including

  18. Slide 18: Recent Chip Sampling and Drilling Highlights

    RECENT CHIP SAMPLING AND DRILLING HIGHLIGHTS Most recent results have shown chip samples of up to ~67 oz/t (2,311 g/t) over 2.3 meters  Drilling assays generally report lower grades than sampling SELECT CHIP SAMPLING1,2 SELECT DRILLING2 assays due to the nuggety nature of the gold system HOLE ID WI

  19. Slide 19: East Tintic Regional Exploration Potential

    EAST TINTIC REGIONAL EXPLORATION POTENTIAL Highly prospective 5 km long corridor with 23 historic mines, extensive legacy datasets East Tintic Au-rich epithermal mineralization zones run vertically downwards and to the west from Pb-Ag-Zn CRD’s to EPITHERMAL HIGH-GRADE Au-Ag 1 Au-Ag-Cu epithermal vei

  20. Slide 20: Regional Targets: Epithermal High-Grade Au-Ag

    1 REGIONAL TARGETS: EPITHERMAL HIGH-GRADE Au-Ag Targets identified based on 3D geological modelling completed to date EUREKA STANDARD NORTH LILY  Epithermal Au-Ag along trend NNE of Trixie  North Lily operated between 1927 and 1940s  Mineralization hosted in the brittle Tintic Quartzite with stru

  21. Slide 21: Regional Targets: Carbonate Replacement Ag-Pb-Zn

    2 REGIONAL TARGETS: CARBONATE REPLACEMENT Ag-Pb-Zn Data compilation and geologic modelling ongoing HISTORIC BURGIN MINE  Mined by Kennecott until 1978, with the “Burgin Extension” discovered from drilling undertaken in 1980  The Burgin mine hosts a significant Pb-Zn-Ag-Au replacement style deposit

  22. Slide 22: Regional Targets: Porphyry Cu-Au-Mo Potential

    3 REGIONAL TARGETS: PORPHYRY Cu-Au-Mo POTENTIAL Strong evidence for multiple potential porphyry centers within the district BIG HILL PORPHYRY TARGET  Located 65 km south of Bingham Canyon Mine, which has produced 19 Mt of copper since 1906  District Endowment of 24.6 MT copper and 43 Moz Au, 425 M

  23. Slide 23: Cariboo Gold Project

    CARIBOO GOLD PROJECT British Columbia, Canada 100% ODV ownership NYSE: ODV | TSXV: ODV www.osiskodev.com 23

  24. Slide 24: Cariboo Gold Project: Asset Snapshot

    CARIBOO GOLD PROJECT: ASSET SNAPSHOT District scale exploration upside potential in an under-explored Cariboo gold belt LOCATION / OWNERSHIP MINE TYPE METALS STAGE LAND PACKAGE 100% ODV BC, Canada Underground Gold Feasibility Study ✓ Mosquito 192,000 ha Silver (Jan-23) Wells Shaft Island Valley Bark

  25. Slide 25: Cariboo Feasibility Study at a Glance

    CARIBOO FEASIBILITY STUDY AT A GLANCE1 FIRST INITIAL TOTAL GOLD MINE LIFE PRODUCTION CAPITAL RECOVERED1 12 YEARS 2024 (Phase 1) C$137.3 M 1.87 MOZ Phase 1 (1-3); Phase 2 (4-12) 2027 (Phase 2) Expansion C$451.1 M 2.03 Moz Probable Reserves PRODUCTION LOM AISC2 NPV5% | IRR RESOURCES1 (LOM Avg.) (US$1,

  26. Slide 26: Cariboo 2023 Feasibility Study Highlights

    CARIBOO 2023 FEASIBILITY STUDY HIGHLIGHTS FS demonstrates that Cariboo will be a large-scale, long-life and profitable gold mine SCALABLE PHASED  Minimizing exposure to development risk with flexibility to scale up DEVELOPMENT  Phase 1: 1,500 tpd operation at ~73 koz / year (first 3 years) ~164 ko

  27. Slide 27: Mine Design Summary

    MINE DESIGN SUMMARY Phase 1 production to come from Lowhee, Shaft and Mosquito deposits  The vertical extent of all mineable blocks averages ~350 meters  Mineralization is open at depth and along strike and between and mineralization has been tested down to 900 meters some deposits due to lack of

  28. Slide 28: Location, Location, Location

    LOCATION, LOCATION, LOCATION … PORTAL TO QR MILL LOWHEE ZONE Railroad Proposed Transmission Wells Line Barkerville Quesnel Highway 100% OWNED, FULLY PERMITTED AND OPERATIONAL Produced gold in 2022 QR Mill Mt Polley Mine Gibraltar Mine ODV Mineral Tenure – 192,000 ha property ROADHEADER AT SITE NYSE:

  29. Slide 29: Cariboo 2023 Feasibility Study Summary

    CARIBOO 2023 FEASIBILITY STUDY SUMMARY SUMMARY OPERATING RESULTS1 SUMMARY ECONOMIC RESULTS1 (US$1,700/OZ AU) Phase 1 Phase 2 LOM LOM (2024 – 2026) (2027 – 2036) (12 years) (12 years) Ore Mined Mt 1.5 15.2 16.7 Total Revenue C$M $4,126 Throughput tpd 1,500 4,900 4,056 Cumulative Cash Flow (pre-tax)2

  30. Slide 30: Cariboo: Reserves and Resources

    CARIBOO: RESERVES AND RESOURCES 2022 PEA MRE1 2023 FEASIBILITY2 MINERAL Tonnes Grade Ounces Tonnes Grade Ounces CATEGORY (Mt) (g/t) (000’s) (Mt) (g/t) (000’s) M&I RESOURCES CONVERSION TO RESERVES PROVEN & PROBABLE – – – 16,703 3.8 2,031 RESERVES MEASURED & INDICATED 27,102 4.0 3,470 14,682 3.3 1,571

  31. Slide 31: Cariboo – Low Capital Intensity & Advanced Versus Peers

    CARIBOO – LOW CAPITAL INTENSITY & ADVANCED VERSUS PEERS CAPITAL INTENSITY – NORTH AMERICAN GOLD DEVELOPERS (Development Capex / Annual Gold Production, US$/kozpa) Phased approach with ✓ Low capital intensity low initial capex to first ✓ Peer leading initial construction cost production ✓ Access, inf

  32. Slide 32: Cariboo Benchmarking: Canadian Underground Mines

    CARIBOO BENCHMARKING: CANADIAN UNDERGROUND MINES CANADIAN UNDERGROUND GOLD ASSETS: UG MINING COSTS (C$/tonne) vs. GRADE (Au g/t) (C$/tonne, UG mining costs) (g/t Au, gold grade) Development $250 18.0 $235 Producing One of Few Advanced Stage Grade (g/t Au) 16.0 $200 Underground Deposits in Canada $18

  33. Slide 33: Cariboo Gold Project: NPV & IRR Sensitivity Analysis

    CARIBOO GOLD PROJECT: NPV & IRR SENSITIVITY ANALYSIS NPV5% SENSITIVITY | AFTER-TAX (C$M)1 IRR SENSITIVITY | AFTER-TAX (%)1 BASE SPOT BASE SPOT CASE GOLD $821 CASE GOLD 31% $715 28% $609 24% 21% $502 17% $394 14% $285 10% $157 $1,400 $1,500 $1,600 $1,700 $1,800 $1,900 $2,000 $1,400 $1,500 $1,600 $1,7

  34. Slide 34: Processing Capacity Expansion Potential

    PROCESSING CAPACITY EXPANSION POTENTIAL CARIBOO GOLD MINE SITE COMPLEX Phase 1 (years 1-3) Grinding & Flotation STREAMLINED Phase 2 (years 4-12) Ore Sorting (Phase 2) (Phase 1)1 DESIGN THAT Expansion Potential ALLOWS SCALING Office, Ore Sorting Warehouse PROCESSING & Garage (Phase 2) (Phase 1) CAPAC

  35. Slide 35: Nature of Mineralization Favorable to Ore Sorting

    NATURE OF MINERALIZATION FAVORABLE TO ORE SORTING Metallurgical testing to date indicates that Cariboo mineralization is well suited for ore sorting Ore Sorting Separates Gold Rich (11.0 g/t1) Host Rock From Unmineralized Sandstone 481 VEIN CORRIDORS Pyrite hosted in quartz veins High Density Materi

  36. Slide 36: Ore Sorter Technology: Illustrative Example

    ORE SORTER TECHNOLOGY: ILLUSTRATIVE EXAMPLE Ore sorting provides significant benefits at low opex of ~$1.00 per tonne feed Mine Feed  View the ore sorter ORE SORTING IS A (3.72 g/t)(1) technology in action: HERE GREEN TECHNOLOGY 4,900 tpd  Significant reduction in energy, water and chemical usage

  37. Slide 37: Up “Grade” Process

    UP “GRADE” PROCESS1 Average estimated uncapped length weighted grade of quartz veins in vein corridors2 PHASE I (2024 – 2026) ~11 g/t 4.43 g/t 8.20 g/t 8.20 g/t AVG. GOLD MINED POST-ORE FEED VEIN GRADE2 GRADE SORTING GRADE DILUTION FROM ORE SORTING FLOTATION BULK MINING OF TECHNOLOGY CONCENTRATE LEA

  38. Slide 38: Cariboo Upside Potential Through Resource Conversion

    CARIBOO UPSIDE POTENTIAL THROUGH RESOURCE CONVERSION FEASIBILITY STUDY – M&I RESOURCES ONLY1 ADDITIONAL INFERRED RESOURCES1  All ramp, access and haulage drifts and other primary  Potential to convert inferred resources near mined ounces at infrastructure to be constructed to provide access to min

  39. Slide 39: Cariboo Exploration Potential at Depth

    CARIBOO EXPLORATION POTENTIAL AT DEPTH  2.03 Moz Au at 3.8 g/t Au in Probable Reserves1  1.57 Moz Au at 3.3 g/t Au M&I resources, 1.71 Moz at 3.44 g/t Au Inferred Resources with potential to be converted1  >500 m additional depth potential of known vein corridors adjacent to mine plan untested –

  40. Slide 40: Developing a Mining Camp

    DEVELOPING A MINING CAMP  District-scale exploration upside in under-explored Cariboo Gold Belt  High degree of confidence in geological model with anomalous gold values >2.0 g/t Au in ~80% of drill holes Area of currently defined MRMR  155,000 ha property with 83 kilometers strike of gold target

  41. Slide 41: San Antonio Project

    SAN ANTONIO PROJECT Sonora, Mexico 100% ODV ownership NYSE: ODV | TSXV: ODV www.osiskodev.com 41

  42. Slide 42: San Antonio: Project Overview

    SAN ANTONIO: PROJECT OVERVIEW ASSET HIGHLIGHTS Sonora  Located 160 km from airport and towns of Hermosillo and Obregon in mining-friendly Sonora  Constructed a heap leach pad and a carbon in column plant at the end of 2021 to process stockpiled mineralized material • 1.1 Mt stockpile grading 0.58

  43. Slide 43: San Antonio Gold Project

    SAN ANTONIO GOLD PROJECT Stockpile placed on newly constructed heap leach pad NYSE: ODV | TSXV: ODV www.osiskodev.com 43

  44. Slide 44: Appendix

    APPENDIX NYSE: ODV | TSXV: ODV www.osiskodev.com 44

  45. Slide 45: World-Class Leadership

    WORLD-CLASS LEADERSHIP SEAN ROOSEN, CEO ALEXANDER DANN, CFO, CPA, CA BOARD OF DIRECTORS • Founding member of Osisko Mining Corporation (2003- • 25 years of experience leading finance operations and strategic planning for companies in 2014) the mining and manufacturing sectors • Responsible for devel

  46. Slide 46: Cariboo FS: Mining Production Profile

    CARIBOO FS: MINING PRODUCTION PROFILE MINED TONNES vs. GRADE BY DEPOSIT1 (000’s tonnes mined) (g/t Au, mined grade) 2,000 5.00 4.68 LOWHEE, SHAFT 1,800 4.50 4.36 4.50 AND MOSQUITO 4.21 1,600 4.15 4.00 Expected to be mined Cow 3.87 3.89 in Phase 1 3.69 3.68 3.60 1,400 Valley 3.50 3.40 Mosquito 3.24 3

  47. Slide 47: Phase I – Large Scale Production at Low Capex

    PHASE I – LARGE SCALE PRODUCTION AT LOW CAPEX KEY METRICS AND BENEFITS FLOW SHEET  1,500 tpd initial throughput (first 3 years)  Crushing and sorting located at mine site START  Reduced capital cost by leveraging existing infrastructure at QR Mill for comminution and leaching  Low initial constr

  48. Slide 48: Phase II – Streamlined Expansion to Optimize Mining

    PHASE II – STREAMLINED EXPANSION TO OPTIMIZE MINING KEY METRICS AND BENEFITS FLOW SHEET  4,900 tpd expansion throughput  Underground primary crushing with conveyor to surface  Ore sorting, comminution and flotation conducted at mine site  Flotation concentrate processed at QR Mill for further co

  49. Slide 49: Feed Up “Grade”: Ore Sorting & Flotation

    FEED UP “GRADE”: ORE SORTING & FLOTATION1 (Gold grade, g/t) 35.0 33.40 MINED GRADE FEED GRADE POST-ORE SORTING 30.69 30.89 30.0 FEED GRADE POST-FLOTATION 29.39 29.07 28.18 27.16 25.28 25.72 25.0 20.0 ~11 g/t average estimated uncapped length weighted grade 16.67 of quartz veins in vein corridors2 15

  50. Slide 50: Cariboo Mineral Reserves & Resources

    CARIBOO MINERAL RESERVES & RESOURCES (Measured and Indicated Resources are exclusive of Reserves) MINERAL RESERVES PROVEN PROBABLE PROVEN & PROBABLE Tonnes Grade Ounces Tonnes Grade Ounces Tonnes Grade Ounces Deposit (000’s) (g/t) (000’s) (000’s) (g/t) (000’s) (000’s) (g/t) (000’s) Cow – – – 4,127 3

  51. Slide 51: Notes to Cariboo Mineral Reserves and Resources

    NOTES TO CARIBOO MINERAL RESERVES AND RESOURCES MINERAL RESERVES 1. Totals may not add up due to rounding. 2. Mineral Reserves have been estimated in accordance with CIM Definition Standards for Mineral Resources and Mineral Reserves (2014), which are incorporated by reference in NI 43-101. 3. Miner

  52. Slide 52: Sapuchi Drill Results

    SAPUCHI DRILL RESULTS Hole number From To Length Au ppm Ag ppm SP-DD-21-006 119.15 129.40 10.25 2.37 2.02 SP-DD-21-008 62.55 84.70 22.15 1.59 3.68 SP-DD-21-008 165.00 177.65 12.65 2.94 3.98 SP-DD-21-008 including 173.25 173.95 0.70 44.40 54.40 SP-DD-21-019 167.40 207.30 39.90 1.02 3.90 SP-DD-21-029

  53. Slide 53: Mineral Resource Estimate – San Antonio Project

    MINERAL RESOURCE ESTIMATE – SAN ANTONIO PROJECT1 TONNES GRADE (g/t) CONTAINED METAL DEPOSIT CATEGORY (Mt) SILVER GOLD SILVER (Moz) GOLD (koz) Indicated 3.9 2.5 1.22 0.31 153 CALIFORNIA Inferred 1.6 3.3 1.10 0.17 58 Indicated 5.7 2.5 1.44 0.46 262 GOLFO DE ORO Inferred 6.4 2.5 1.24 0.52 254 Indicated

  54. Slide 54: Trixie Mineral Resources Estimate – January 10, 2023

    TRIXIE MINERAL RESOURCES ESTIMATE – January 10, 2023 GRADE CONTAINED GRADE CONTAINED DOMAIN CATEGORY TONNES (AU G/T) GOLD (OZ) (AG G/T) SILVER (OZ) Measured – – – – – Indicated 34,470 16.39 18,159 30.55 33,856 T1 M+I 34,470 16.39 18,159 30.55 33,856 Inferred 134,665 16.59 71,832 38.51 166,716 Measur

  55. Slide 55: Notes to Trixie Mineral Resources

    NOTES TO TRIXIE MINERAL RESOURCES NOTES 1. Effective date of the Trixie MRE is January 10, 2023. 2. Each of Mr. William Lewis P.Geo, of Micon International Limited and Alan S J San Martin, AusIMM(CP), of Micon International Limited (i) has reviewed and validated the Trixie MRE, (ii) is considered to