J. Kumar Infraprojects Limited · NSE:JKIL

J. Kumar Infraprojects — Q4 FY2018 Earnings Presentation

39 slides from J. Kumar Infraprojects's earnings presentation, March 2018

  1. Slide 1: J. Kumar Infraprojects Limited

    LOREM IPSUM DOLOR J. Kumar Infraprojects Limited We dream… So we achieve… March 2018

  2. Slide 2: Agenda

    AGENDA • Company Overview • Business Strategy • Order Book • Key Highlights • Appendix A. Financial Highlights B. Major Projects Completed C. Major Projects Under Execution

  3. Slide 3: Company Overview

    Company Overview J. Kumar Infraprojects Limited, promoted by Mr. Jagdishkumar M. Gupta was incorporated in the year 1999 with an object to carry on the business as a builders, contractor or sub contractor. Our core competence and expertise is in the field of Transportation Engineering, Civil Constru

  4. Slide 4: Business Verticals

    Business Verticals Civil Piling Transportation Construction Irrigation Engineering Metro Rail (Underground & Hospital cum Medical College Earthen Dams Insitucast Piling Elevated) Railway Terminus & Station Minor Irrigation Tanks Precast Piling Flyovers, Bridges & Roads Other Civil Constructions Spil

  5. Slide 5: Milestones

    Milestones 2018 Revenue Crossed Rs. 20,000 MN 2016 Awarded With Mumbai Metro Projects worth Rs. 2015 67,174 MN • Awarded with Ahmedabad Metro Project worth Rs. 2013 2,781 MN Revenue Crossed Rs. • Fund raised through QIP of 10,000 MN Rs. 4,093 MN 2012 2008 Awarded with DMRC Project worth Rs. 14,072 L

  6. Slide 6: Our Key Strengths

    Our Key Strengths Operational capability in different types of Large fleet of owned machineries and infrastructure projects equipments We have wide ranging capabilities in different We have a large fleet of owned machinery and equipment infrastructure verticals including transport engineering, provi

  7. Slide 7: Key Management Profile

    Key Management Profile Mr. Jagdishkumar Gupta – Founder Promoter & Executive Chairman • Instrumental in setting up and for the growth of JKIL. Under his leadership, since its modest start in the year 1980, JKIL has expanded and grown as a Registered Class I-A construction company • His acumen has be

  8. Slide 8: Other Board of Directors

    Other Board of Directors Kusum J. Gupta • She has been associated with the company since May 2014 , and joined as ‘women director’ Director Padmanabh P. Vora • He is a Chartered Accountant by profession and has over 32 years experience in finance, banking and Independent Director management • He has

  9. Slide 9: Key Managerial Personnel

    Key Managerial Personnel Management Background He has a bachelor’s degree in civil engineering from Pune University and has over five decades of experience. S.M. Thorat He retired as a Superintendent Engineer after 37 years of service in PWD, Maharashtra, and has extensive experience in planning and

  10. Slide 10: Key Managerial Personnel

    Key Managerial Personnel Management Background He hold ASCE ( American Society of Civil Engineers ), TEE ( Certified Licensed Civil engineers of Greece ), Qatar Attestation (Attested Peter Andrikopoulos Civil Engineer by Qatar’s U.S. Embassy ) certification .he has over 35 years experience TBM Relat

  11. Slide 11: Key Managerial Personnel

    Key Managerial Personnel Management Background He holds a masters degree in geology and has over 25 years experience in soil investigation, rock anchoring, piling / micro piling, Shirish A. Kulkarni construction of diaphragm wall and rotary piling work for various types of structures. Vice President

  12. Slide 12: Quarterly Financial Performance

    Quarterly Financial Performance Turnover (Rs. in Mn) EBIDTA (Rs. in Mn) & EBITDA Margin 10,000 1400 14.18% 14.18% 9,000 14.18% 1200 8,000 14.18% 7,000 1000 14.18% 6,000 800 14.17% 5,000 600 14.17% 14.17% 4,000 3,000 14.17% 400 2,000 14.17% 200 14.17% 1,000 5,222 9,023 758 1,293 0 0 14.16% Q4FY17 Q4F

  13. Slide 13: Yearly Financial Performance

    Yearly Financial Performance Turnover (Rs. in Mn) EBIDTA (Rs. in Mn) & EBITDA Margin 25,000 4,000 17.23% 17.30% 3,500 17.20% 20,000 3,000 17.10% 15,000 2,500 17.00% 2,000 10,000 16.82% 16.90% 1,500 16.80% 1,000 5,000 500 16.70% 16,043 20,507 2,817 3,497 0 0 16.60% FY17 FY18 FY17 FY18 PBT (Rs. in Mn)

  14. Slide 14: Overview – Transport Engineering

    Overview – Transport Engineering • In this business vertical, we are engaged in construction of Metro Rail (Underground & Elevated) Mono Rail, ROB’s, RUB’s, roads, flyovers, bridges, skywalks, airport runways and storm water drainage works • We have over 2 decades of experience in transport engineer

  15. Slide 15: Overview – Piling

    Overview – Piling • Piling is a specialized activity carried out with hydraulic piling rigs • We build pile foundations for buildings and flyovers, marine structures and offshore platforms • In 2007 we started a new piling division and we are one of the leading piling contractors in the country • Cu

  16. Slide 16: Some of our Prestigious Projects…1

    Some of our Prestigious Projects…1 ROB at Dahisar Flyover at Dindoshi, Mumbai Flyover at Hindmata Flyover at Dhanakwadi Bridge at Bandra -Mahim Balewadi Flyover, Pune Grade Separator, Pune Flyover at Panjarapole, Mumbai Skywalk at Bandra, Mumbai Skywalk at Cottengreen, Mumbai DMRC CC-24 Tunnel Flyov

  17. Slide 17: Some of our Prestigious Projects…2

    Some of our Prestigious Projects…2 DMRC CC-02 Kherwadi Flyover, Mumbai Mahape Flyover, Mumbai Sion-Panvel High Way Jogeshwari ROB, Mumbai Dhankawadi Flyover, Pune ESIC Hospital, Alwar Navi Mumbai Metro Flyovers being constructed across Maharashtra 17

  18. Slide 18: Some of our Prestigious Projects…3

    Some of our Prestigious Projects…3 Bandra Casting Yard MML-07 Malwani Casting Yard MML-02 Mumbai Metro Line - 07 Mumbai Metro Line - 02 Mumbai Metro Line - 03 Mumbai Metro Line - 03 Thane-Belapur Savita Chemical Mumbai Metro Line - 02 Metro being constructed across Mumbai 18

  19. Slide 19: Large Fleet of Owned Machinery & Equipment

    Large Fleet of Owned Machinery & Equipment Sr. No. Type of Equipment No. of Units Kind & Make 1 Tunnel Boring Machine 7 Terratec 2 Hydraulic Piling Rig 42 MAIT We believe that ownership of 3 Poclain/Excavators 28 Tata Hitachi/Komatsu machineries and equipment is our 4 Dumper & Tripper 81 Tata/Ashok

  20. Slide 20: Business Strategy…1

    Business Strategy…1 Increasing the order book On an expansion Increasing the mode in other scope of work for states of India each order Drive Revenue Enhancing pre- Associating qualification ourselves with strengths through larger projects strategic alliances Increasing fleet of Increasing Sectoral

  21. Slide 21: Business Strategy…2

    Business Strategy…2 Focus to remain on timely execution of projects Optimum utilization of Expansion of RMC Plant and Machinery division Do not intend to Moving up the Value Growth in undertake sub- Chain Net Profit contracting work We are poised to capture the growing infrastructure market with our

  22. Slide 22: Growth in Order Book

    Growth in Order Book 1,00,000 93,348 90,000 80,000 74,800 70,000 60,000 In Rs. Million 50,000 40,000 36,610 31,225 32,141 30,240 30,000 20,000 10,000 0 Q4FY13 Q4FY14 Q4FY15 Q4FY16 Q4FY17 Q4FY18 Our Company has a strong order book 22

  23. Slide 23: Order Book Details

    Order Book Details Segment Wise Break-up Sub-segment Wise Break-up 1,396 666 1,396 8,815 9,011 666 Civil Flyover Civil 11,828 Irrigation Irrigation Metro - Elevated Transportation Metro - Underground Road 43,084 72,738 Geographical Break-up Govt./Non Govt. Break-up 0 35 1,437 1,396 Delhi Gujarat Gov

  24. Slide 24: Key Customers

    Key Customers Transportation Engineering Civil UPRNN Construction Vidharbh Irrigation Pimpri Irrigation Bambla Canal Irrigation Development Division, Division, Corporation Yavatmal Yavatmal Piling 24

  25. Slide 25: Risks to our Business

    Risks to our Business Project Execution 1 In transportation engineering contracts, we face execution risk mainly related to delay in execution due to land acquisition problems and environmental clearances, the primary responsibility of which rests with the government Geographical Concentration 2 His

  26. Slide 26: Key Highlights

    Key Highlights Leaders of this niche segment Experienced management Operate with margins better team then the industry Large fleet of owned Increasing and diversified machineries order book Huge macro potential Reputed client base - backed by proven execution Government and Private capabilities 26

  27. Slide 27: Appendix

    APPENDIX 27

  28. Slide 28: Financial Highlights – Balance Sheet

    Financial Highlights – BALANCE SHEET In Rs. MN Balance Sheet Extracts Fiscal 2016 Fiscal 2017 Fiscal 2018 Equity Share Capital 378 378 378 Reserves and Surplus 12,539 13,529 14,709 Loan Funds 3,537 4,368 5,804 Net Fixed Assets 4,974 5,826 8,422 Non - Current Assets 8,606 8,310 11,290 Current Assets

  29. Slide 29: Financial Highlights – Profit & Loss Statement

    Financial Highlights – PROFIT & LOSS STATEMENT In Rs. MN Profit & Loss Fiscal 2017 Fiscal 2018 Income from Operation 16,042 20,507 Other Income 311 285 Total Income 16,353 20,792 Growth % NA 27.83% Operating Expenses 13,537 17,295 EBIDTA 2,816 3,497 Depreciation 556 727 EBIT 2,260 2,770 Financial Ch

  30. Slide 30: Major Projects Completed - Transportation Engineering

    Major Projects Completed - Transportation Engineering Work Done (Rs. Name of Work executed Client In Mn) Construction of Eastern Freeway section from Panjarapol to Chembur Mankurd Link Road KM 0/000 to MMRDA 2,938 2/500 Design and Construction of Flyover on Dr Baba Saheb Ambedkar Road, Mumbai, Mahar

  31. Slide 31: Major Projects Completed - Transportation Engineering

    Major Projects Completed - Transportation Engineering Work Done Name of Work executed Client (Rs. in Mn) W.S.-2 - Cleaning and Improvement of SWD and nallas including increasing / reconstruction in C.A.No. 206 i.e. Rajendra Nagar MCGM 491 Nalla in R/C Ward, WS-3 - do -- C.A. No. 205 i.e. Mathre Nall

  32. Slide 32: Major Projects Completed - Transportation Engineering

    Major Projects Completed - Transportation Engineering Work Done Name of Work executed Client (Rs. in Mn) Work Code No.AW 53 - Widening and improvement of various roads in P/North Ward MCGM 281 ES 8 & ES 9: Improvement of Kannawar Nagar Nalla system and training of Bombay Oxygen Nalla MCGM 266 Develo

  33. Slide 33: Major Projects Completed – Civil Construction, Irrigation

    Major Projects Completed – Civil Construction, Irrigation Major Projects Completed – Civil Construction Work Done (Rs. Name of Work executed Client in Mn) Sadbhav Modernization & computerization of Integrated Border Check Posts at 22 locations in the State of Maharashtra Engineering 299 on Build, Op

  34. Slide 34: Major Projects Under Execution

    Major Projects Under Execution Contract value (Rs. Value of uncompleted work (Rs. Name of the Project in Mn) in Mn) as on 31.03.2018 Design and Construction of Underground Section including Four Underground Stations at Dharavi, B.K.C. Vidya Nagari and Santa Cruz and Associated Tunnels together with

  35. Slide 35: Major Projects Under Execution – Contd…

    Major Projects Under Execution – Contd… Contract value (Rs. Value of uncompleted work (Rs. Name of the Project in Mn) in Mn) as on 31.03.2018 Construction of Dr. Ram Manohar Lohia Rajya Prashasan Evem Prabandhan Academy, Chak Ganjaria, 2600 1396 Sultanpur Road, Lucknow. W266 Concreting of various ro

  36. Slide 36: Major Projects Under Execution – Contd…

    Major Projects Under Execution – Contd… Value of uncompleted work (Rs. in Mn) as on Name of the Project Contract value (Rs. in Mn) 31.03.2018 Construction of Six Lane Bridge across Ulhas creek on proposed Motagaon- Mankoli Road on 1362 1077 Contractor’s own design and Lump sum basis in the State of

  37. Slide 37: Disclaimer

    Disclaimer This Information Package is distributed by J. Kumar Infraprojects Ltd. on a strictly confidential basis for information only. This Information Package and the information and projections contained herein may not be disclosed, reproduced or used in whole or in part for any purpose whatsoev

  38. Slide 38: Contact details

    Mr. Arvind Gupta (Chief Financial Officer) J. Kumar Infraprojects Ltd. Ph: +91-22-67743555 Email: arvind.gupta@jkumar.com Mr. Snighter A / Mr. Pratik Patil Concept Investor Relations Mo: +91 9819123804 / 8291510324 Email: snighter@conceptpr.com / pratik@conceptpr.com 38

  39. Slide 39: Thank You

    THANK YOU

J. Kumar Infraprojects — Q4 FY2018 Earnings Presentation on 6ix