Ramelius Resources Limited · ASX:RMS

Ramelius Resources — Noosa Mining Conference 2022

26 slides from Ramelius Resources's conference presentation, Jul 21, 2022

  1. Slide 1: An Australian Gold Growth Story

    Ramelius Resources Limited For personal use only Mark Zeptner Managing Director ASX:RMS Noosa Mining Conference An Australian Gold Growth Story NOOSA MINING CONFERENCE • JULY 2022 1 July 2022

  2. Slide 2: Forward Looking Statements

    QUALIFICATION Forward Looking Statements For personal use only This presentation contains certain forward looking statements with respect to Ramelius Resources Ltd’s (Ramelius) financial condition, results of operations, production targets and other matters that are subject to various risks and unce

  3. Slide 3: Corporate Summary

    CORPORATE SUMMARY Corporate Structure Gold Guidance For personal use only Market Cap1 A$827M @ $0.955 per share FY21 Production3 272,109oz @ AISC A$1,317/oz Cash & Gold2 A$164.7M FY22 Guidance5 255,000 – 260,000oz @ AISC of A$1,475 – 1,525/oz Debt2 Nil (Undrawn A$100M facility) Mineral Resources4 5.

  4. Slide 4: Mission, Values, Strategy and the Essentials

    MISSION, VALUES, STRATEGY AND THE ESSENTIALS For personal use only NOOSA MINING CONFERENCE • JULY 2022 4

  5. Slide 5: Project Overview

    PROJECT OVERVIEW ➢ Ramelius has two production centres at Mt Magnet & Edna May For personal use only ➢ Mt Magnet: ▪ Mt Magnet has produced over 6Moz since mining first began in 1891 ▪ 1.7mtpa mill with both open pit and underground sources within 5km ▪ High grade Vivien underground ore being hauled

  6. Slide 6: Impact of COVID-19 on H2 FY22

    IMPACT OF COVID-19 ON H2 FY22* ➢ Minimal impact in H1 FY22 For personal use only ➢ WA Border re-opened 3 March 2022 ➢ Protection systems in place: ▪ Pre-commute PCR/RAT testing ongoing ▪ Contact tracing cards at Mt Magnet & Edna May ➢ Escalation in cases, on and off-site since border re-opening, clo

  7. Slide 7: H2 FY22 Ore Haulage to Edna May

    H2 FY22 ORE HAULAGE TO EDNA MAY For personal use only ➢ Average planned rate of ~120,000tpm (dotted) ➢ Jan & Feb actuals affected by road train driver shortages with closed borders ➢ Increased access to drivers following border re-opening in March 2022 ➢ COVID-19 impacts primarily have limited abili

  8. Slide 8: Maintaining Margins Through COVID-19

    MAINTAINING MARGINS THROUGH COVID-19 For personal use only ➢ Gold production increased year-on-year by +20% from FY15 to FY21 ➢ Latest guidance 255-260koz for FY22* ➢ AISC profile now seeing an increase with cost pressure stemming from inflation & COVID related impacts ➢ Sales / AISC margins still h

  9. Slide 9: Value Accretive Corporate Action Continues

    VALUE ACCRETIVE CORPORATE ACTION CONTINUES ➢ Ramelius completed Apollo (ASX:AOP) acquisition, owner of For personal use only the Lake Rebecca Gold Project (Rebecca) in January 2022 ▪ Rebecca Mineral Resources of 29.1 Mt @ 1.2 g/t Au for 1.1 Moz 1 ▪ Apollo’s shareholders received an implied Offer pri

  10. Slide 10: Key Project Updates

    For personal use only KEY PROJECT UPDATES NOOSA MINING CONFERENCE • JULY 2022 10

  11. Slide 11: Penny - Heading to the First Ore Drive

    PENNY - HEADING TO THE FIRST ORE DRIVE IN ONE OF AUSTRALIA’S HIGHEST GRADE GOLD MINES For personal use only . 1 See RMS ASX Release “Resources and Reserves Statement 2021”, 10 September 2021 NOOSA MINING CONFERENCE • JULY 2022 11

  12. Slide 12: Penny - Heading to the First Ore Drive

    PENNY - HEADING TO THE FIRST ORE DRIVE IN ONE OF AUSTRALIA’S HIGHEST GRADE GOLD MINES ➢ Mineral Resources - 620kt @ 15.0g/t for 300koz1 For personal use only . ➢ Ore Reserve - 500kt @ 14.0g/t for 230koz1 ➢ Feasibility Study completed October 2020* ▪ AISC of A$633/oz – inflated to A$749/oz current ▪

  13. Slide 13: Mt Magnet: Eridanus - Best Grades FY24-25

    MT MAGNET: ERIDANUS - WILL SEE THE BEST GRADES FY24-25 For personal use only . ➢ Eridanus Stage 2 open pit commenced in June 2020 ➢ Open pit continues into FY25, with grade improving at depth ➢ February 2022 Mineral Resources1: ▪ Eridanus 20Mt @ 1.2g/t for 760,000 ounces ▪ Orion/Franks Tower 6.9Mt @

  14. Slide 14: Mt Magnet: Galaxy Underground

    MT MAGNET: GALAXY UNDERGROUND - EXTENSIONS LIKELY AT RECENTLY STARTED PROJECT For personal use only . ➢ Historic area mined by Ramelius 2012 – 2018 upon re-start ➢ Access existing Hill 50 decline & run separate declines to Mars & Saturn orebodies ➢ Banded Iron Formations have excellent depth continu

  15. Slide 15: Mt Magnet: Bartus East - Underground Potential

    MT MAGNET: BARTUS EAST - UNDERGROUND POTENTIAL WITHIN 5KM OF THE MILL For personal use only ➢ Further results from recent RC and diamond drilling: ▪ 13.8m at 2.83g/t Au from 269m in GXDD0141, and ▪ 20.5m at 2.18g/t Au from 295.2m, including ▪ 3.2m at 7.31g/t Au from 310m ▪ 15m at 1.67g/t Au from 156

  16. Slide 16: Rebecca Gold Project - Exploration Drilling

    REBECCA GOLD PROJECT - EXPLORATION DRILLING UNCOVERING UPSIDE ➢ A proven, regional-scale gold belt For personal use only & Tier 1 location ▪ 150km north-east from Kalgoorlie, in Australia’s premier gold province ▪ Southern end of the +30Moz Laverton Tectonic Zone ▪ Access to first-class regional inf

  17. Slide 17: Sources of Future Growth

    For personal use only SOURCES OF FUTURE GROWTH NOOSA MINING CONFERENCE • JULY 2022 17

  18. Slide 18: Organic Growth - Mining/Processing Studies

    ORGANIC GROWTH - MINING/PROCESSING STUDIES# For personal use only Centre Study Description . Next Key Date Hill 50 underground: Desktop Study complete, now onto Scoping Study July 2022 (Update with Quarterly) Eridanus underground: Pre-Feasibility Study, awaiting further drilling and pit deepening TB

  19. Slide 19: Inorganic Growth - Third Production Centre Strategy

    INORGANIC GROWTH - THIRD PRODUCTION CENTRE STRATEGY For personal use only Opportunity ➢ Ramelius has two production centres at Mt Magnet & Edna May, currently producing 250-280koz per annum ➢ Strategy has been to acquire a 3rd production centre to add scale, diversity, optionality & growth prospects

  20. Slide 20: Ramelius - Well Positioned for FY23 and Beyond

    RAMELIUS - WELL POSITIONED FOR FY23 AND BEYOND For personal use only Proven management team adept in either greenfields development or Operational Excellence refurbishment & operation of both open pit and underground mines Strong balance sheet, disciplined approach to capital management with a Balan

  21. Slide 21: Thank You

    THANK YOU For personal use only Ramelius Resources Limited ASX Code: RMS Level 1, 130 Royal Street East Perth WA 6004 Authorised for release to the ASX by the Managing Director. For further information contact: Investor enquiries: Media enquiries: Mark Zeptner Tim Manners Luke Forrestal Managing Dir

  22. Slide 22: Appendix - 2021 Mineral Resource Statement

    APPENDIX 1 - 2021 MINERAL RESOURCE STATEMENT For detailed information relating to Mineral For personal use only Resources see ASX Releases (RMS) “Resources and Reserves Statement 2021”, 10 September 2021. The Company confirms that it is not aware of any new information or data that materially affect

  23. Slide 23: Appendix - 2021 Ore Reserve Statement

    APPENDIX 2 - 2021 ORE RESERVE STATEMENT For detailed information relating to Ore Reserves For personal use only see ASX Releases (RMS) “Resources and Reserves Statement 2021”, 10 September 2021. The Company confirms that it is not aware of any new information or data that materially affects the info

  24. Slide 24: Appendix - Bartus East Deeps Exploration Diamond Drilling Result

    APPENDIX 3 - BARTUS EAST DEEPS EXPLORATION DIAMOND DRILLING RESULT F/Depth From To Interval For personal use only Hole ID Easting Northing RL Az/Dip g/t Au (m) (m) (m) (m) GXDD0140 579181 6892593 423 322/-61.5 397 306 317 11 1.07 322.8 337.1 14.3 1.26 349 354.9 5.9 0.69 359 381 22 1.22 GXDD0141 5785

  25. Slide 25: Appendix - JORC Table Report for Surface Aircore, RC and Diamond Drilling

    APPENDIX 4 - JORC TABLE 1 REPORT FOR THE SURFACE AIRCORE, RC AND DIAMOND DRILLING For personal use only NOOSA MINING CONFERENCE • JULY 2022 25

  26. Slide 26: Appendix - JORC Table Report for Surface Aircore, RC and Diamond Drilling

    APPENDIX 5 - JORC TABLE 1 REPORT FOR THE SURFACE AIRCORE, RC AND DIAMOND DRILLING For personal use only NOOSA MINING CONFERENCE • JULY 2022 26

Ramelius Resources — Noosa Mining Conference 2022 on 6ix