Lindian Resources Limited · ASX:LIN

Lindian Resources — Prospectors & Developers Association of Canada (PDAC) 2026

33 slides from Lindian Resources's conference presentation, March 2026

  1. Slide 1: The New Force in Rare Earths

    The New Force in Rare Earths Prospectors & Developers Association of Canada (PDAC) 1-4 March 2026 Zac Komur Executive Director Lindian Resources Limited ASX: LIN | www.lindianresources.com.au | ACN 090 772 222 1 1

  2. Slide 2: Important Information – Disclaimer

    IMPORTANT INFORMATION Disclaimer The material in this presentation has been prepared by Lindian Resources Limited (“Company”). This presentation may not be reproduced, redistributed or passed on, directly or indirectly, to any other person, or published, in whole or in part, for any purpose without

  3. Slide 3: Lindian Corporate Snapshot

    LINDIAN CORPORATE SNAPSHOT Executing development of the world-class Kangankunde Rare Earths Project Capital Structure Corporate Profile Board of Directors/Senior Management Experienced Leadership Across Mining, Processing and Major Project Delivery Market Cap. ASX Code Headquarters A$1.08bn1 LIN Per

  4. Slide 4: Peer Landscape: Next Producer to Market

    PEER LANDSCAPE: NEXT PRODUCER TO MARKET Kangankunde – next rare earths miner in production this year (2026) Bubble size represents Market Cap1 Production FID + Under FID, Fully-Funded Construction & Under Construction DFS PFS / PEA Exploration / Scoping VHM Limited Market Cap: Commerce Resources Cor

  5. Slide 5: Kangankunde – Significant World Class Asset

    KANGANKUNDE – SIGNIFICANT WORLD CLASS ASSET World-class deposit which is ~20% NdPr, supplying the critical raw materials for rare earth magnets Use of Rare Earth Elements Mineral Resource NdPr Contained (kt)1 • Rare earth elements (REEs) are a group of 17 metallic elements, encompassing the 15 lanth

  6. Slide 6: Kangankunde Project Snapshot

    KANGANKUNDE PROJECT SNAPSHOT1 Robust technical, economic and financial metrics 23.7mt Ore Reserve2 261mt Mineral Resource2 Containing 676kt of TREO including Containing 5,585kt of TREO including ~133kt of NdPr. 1,132kt of NdPr. ~3.0% TREO Grade ~10x Resource to Reserve Supports low-cost production a

  7. Slide 7: Iluka Resources Strategic Partnership

    ILUKA RESOURCES STRATEGIC PARTNERSHIP1 Funding support with secured long-term offtake and protected pricing structure Funding Secured Long-Term Offtake Secured Floor Price Protection ✓ Fully funded Stage 1 with a US$20m (~A$31m) non-dilutive ✓ 15 + 15 year2 strategic offtake agreement with Iluka Res

  8. Slide 8: Kangankunde Stage 1 & Planned Five-Fold Expansion

    KANGANKUNDE STAGE 1 & PLANNED FIVE-FOLD EXPANSION Executing Stage 1 with fully permitted Stage 2 expansion pathway Stage 1 – In Execution Allocation and Expansion Potential Iluka Resources 20,000tpa - Annual Stage 1 Plant Size Capacity (Optimised) Lindian-RA JV MREC Plant 120,000tpa Funding Addition

  9. Slide 9: Global Rare Earth Demand Surging into 2035

    GLOBAL RARE EARTH DEMAND SURGING INTO 2035 Lindian emerging as next producer to market with potential to supply ~15%4 of global NdPr market Demand for magnets is set Magnet rare earth supply is Industry faces sustained shortages to surge forecast to lag without new supply • Demand for permanent magn

  10. Slide 10: Integrated Mine to MREC Supply Chain

    INTEGRATED MINE TO MREC SUPPLY CHAIN Capturing Downstream Margins Through Western-Aligned MREC Production Kazakhstan • Downstream MREC production via Lindian-RA JV government backed hydromet plant in Stepnogorsk (12,500 tpa2). • Captures additional downstream margin. • Reduces reliance on third-part

  11. Slide 11: Immediate Downstream Integration: MREC Production from 2026

    IMMEDIATE DOWNSTREAM INTEGRATION MREC PRODUCTION FROM 2026 100% acquisition of operating SARECO MREC facility enables integrated production from 2026 Only non-China developer targeting Concentrate and MREC in 2026. Downstream margin capture without greenfield capital intensity or multi-year developm

  12. Slide 12: Capturing Downstream Value: Concentrate to MREC

    CAPTURING DOWNSTREAM VALUE: CONCENTRATE TO MREC Higher Margin, Greater Control, Lower Risk Downstream Advantages Key ANSTO & SARECO Findings1 ✓ Margin capture through downstream integration. ~97% Non-Class 7 – ~92% ✓ Higher payability versus concentrate-only sales. NdPr Stockpile TREO Recovery Capab

  13. Slide 13: Constrained Ex-China Rare Earth Supply Chain

    CONSTRAINED EX-CHINA RARE EARTH SUPPLY CHAIN Only FID-Approved, Fully Funded Integrated Developer in 2026 Concentrate MREC Oxides & Metallisation Operational FID & Fully-Funded Only FID- Approved & Fully Funded Strategic Integrated Partnerships Developer1 Underway FID approved, fully funded and Oper

  14. Slide 14: Delivering Kangankunde

    DELIVERING KANGANKUNDE On Track for Q4 2026 Production1 Processing Plant Mining Fleet Non-Process Safety, Power Execution Discipline & Mobilisation Infrastructure Advancing & Readiness Schedule Confidence • Design & Construct • Komatsu owner- • Mobile workshop, fuel • The Project has • Owner-operato

  15. Slide 15: Flowsheet

    FLOWSHEET Unique mineralogy allowing gravity and magnetic separation - producing premium grade 55% TREO concentrate Feed Pad & Feed Bin Grinding & Classification Gravity Concentration • Very low 0.2 : 1 waste/ore ratio COARSE SLIMES strip ratio. FINES • Material is crushed via a two-stage HYDROCYCLO

  16. Slide 16: Government and International Relations

    GOVERNMENT AND INTERNATIONAL RELATIONS Building lasting partnerships - Government Alignment & Global Backing Trusted Partner to the Government of Malawi Globally Significant Strong Government Endorsement Recognised on the World Stage Lindian maintains a strong and cooperative Kangankunde is acknowle

  17. Slide 17: Community Engagement Plan (CEP)

    COMMUNITY ENGAGEMENT PLAN (CEP) Structured. Partnership-Led. Long-Term. Lindian’s Community Engagement Plan provides a formal framework to ensure community investment aligns with government priorities, local needs and long-term project development. Consult Align Deliver Sustain • Community forums an

  18. Slide 18: Significant EBITDA Upside Driven by Low-Cost Operating Profile

    SIGNIFICANT EBITDA UPSIDE DRIVEN BY LOW-COST OPERATING PROFILE Stage 1 economics based on US$82/kg NdPr with strong leverage to higher realised prices Additional Upside: • Expansion to MREC Production. • Increased downstream margins. • Stage 2 growth potential. • Nd Pr price increases. + US$10/kg Nd

  19. Slide 19: The New Force in Rare Earths

    The New Force in Rare Earths Lindian Resources Limited ABN 53 090 772 222 Level 15, 240 St Georges Terrace Perth WA 6000 Australia T: +61 8 6401 4300 E: info@lindianresources.com.au www.lindianresources.com.au 19

  20. Slide 20: Appendix A – Source Data

    APPENDIX A — SOURCE DATA LINDIAN RESOURCES LTD. 20

  21. Slide 21: Kangankunde: Peer Comparison

    KANGANKUNDE: PEER COMPARISON Significant Resource endowment (TREO content) at high TREO grades 7,000 Lindian Resources Ltd. 6,000 Energy Transition Minerals Ltd. Lynas Rare Earths Ltd. 5,000 TREO Contained (kt) 4,000 Peak Rare Earths Ltd. Pensana Plc Meteoric Resources NL MP Materials Corp. 3,000 Vi

  22. Slide 22: First Quartile of Cost Curve Globally

    FIRST QUARTILE OF COST CURVE GLOBALLY 1 Low-cost producer of a high-grade premium Monazite Concentrate (55% TREO) Rare Earth Industry Mixed Rare Earths Carbonate Projects Cost Curve (2023)2 Kangankunde Low Operating Cost Project 30,000 • One of the largest, high grade rare earths deposits in the wor

  23. Slide 23: Project Timeline

    PROJECT TIMELINE On Track for Q4 2026 First Production FID Declared 15 months to first production Project Timeline: Full Go-Ahead for Kangankunde Pre-FID/ 2025 2025 2026 2026 20272027 Project Early Timeline • The Kangankunde project is now fully funded through to Q1 Works Q2 Q3 Q3 Q4 Q4 Q1 Q1 Q2 Q2

  24. Slide 24: Geology Built for Long-Life, Low-Cost Production

    GEOLOGY BUILT FOR LONG-LIFE, LOW-COST PRODUCTION Low Strip Ratio structural cost advantage Staged Development Driving Early Value1 • Low-strip mining starter pit focuses on near-surface, high-grade zones to support • Very low thorium content = very low radiation for operations, shipping and sales. s

  25. Slide 25: Kangankunde Stage 1 – Production Summary

    KANGANKUNDE STAGE 1 – PRODUCTION SUMMARY Conventional mining and simplified process flowsheet – lower production risk • Drill, blast, load, haul model. • Mined ore transported to ROM stockpile. • 451,000 tpa1 plant feed at 2.9% TREO. • Unique mineralogy allowing gravity and magnetic separation • Ver

  26. Slide 26: Important Future Role in the Rare Earths Value Chain

    IMPORTANT FUTURE ROLE IN THE RARE EARTHS VALUE CHAIN Lindian can be a significant player across multiple stages of the REE value chain over time Kangankunde Stages 1, expansion and Examine future downstream opportunities processing to MREC Developing processing capability to realise higher margins.

  27. Slide 27: Feasibility Study - Financial Evaluation

    FEASIBILITY STUDY - FINANCIAL EVALUATION 1 Robust Financial Returns for Stage 1 (15,300tpa) A$831m (US$555m ) 2 80% 1.5 years Post-tax NPV8 (Ungeared) Post-tax IRR (Ungeared) Payback period (Post-Tax) A$170.3m (US$113.7m ) 2 A$86.9m (US$58.0m ) 2 A$124.5m (US$83.1m ) 2 Average annual revenue (Life-o

  28. Slide 28: Source Data: Mineral Resources (NdPr Contained)

    SOURCE DATA: MINERAL RESOURCES (NDPR CONTAINED)1 Company Information Mineral Resources (Measured) Mineral Resources (Indicated) Mineral Resources (Inferred) Mineral Resources (Total) Source Contained Containe Contained Containe Contained Containe Contained Contained Company Code Project Project Stat

  29. Slide 29: Source Data: Mineral Resources (TREO Contained)

    SOURCE DATA: MINERAL RESOURCES (TREO CONTAINED) Company Information Mineral Resources (Measured) Mineral Resources (Indicated) Mineral Resources (Inferred) Mineral Resources (Total) Source Contained Contained Contained Contained Contained Contained Contained Contained Company Code Project Project St

  30. Slide 30: Kangankunde - Resources & Reserves

    KANGANKUNDE - RESOURCES & RESERVES Mineral Resource Inclusive of Reserves @ 0.5% TREO Cut-off Grade Competent Persons’ Statement The information in this presentation that relates to Exploration Results, Metallurgy Results, and Mineral Resource Classification Tonnes TREO NdPr% of Tonnes Contained Res

  31. Slide 31: Kangankunde – Exploration Target

    KANGANKUNDE – EXPLORATION TARGET 1 An Exploration Target has been determined for the Central Carbonatite of the Kangankunde Rare Earths Project in addition to the current Mineral Resource Estimate (MRE), as follows: Target Range Tonnes (millions) Grade (TREO %) Exploration Target Lower 400 2.0% Cent

  32. Slide 32: Glossary

    GLOSSARY micron, metric unit of measure for length HVAC​ Heating, Ventilation and Air Conditioning ​ NPV​ Net Present Valuation​ µm​ equal to 0.001 mm​ Australian Nuclear Science and Technology HREE/HRE Heavy Rare Earth(s) (Elements) NED Non-Executive Director ANSTO​ Organisation​ HREO Heavy Rare Ea

  33. Slide 33: Lindian Resources Limited

    Lindian Resources Limited ABN 53 090 772 222 Level 15, 240 St Georges Terrace Perth WA 6000 Australia T: +61 8 6401 4300 E: info@lindianresources.com.au www.lindianresources.com.au 33

Lindian Resources — Prospectors & Developers Association of Canada (PDAC) 2026 on 6ix