Slide 1: Q2 FY26 Shareholder Update
For personal use only Q2 FY26 Shareholder Update 3/2/2026 Peter Voigt CEO, Clean TeQ Water ASX: CNQ
Slide 2: Cautionary statement
Cautionary statement Certain statements in this news release constitute “forward-looking statements” or “forward-looking information” within the meaning of applicable securities laws. For personal use only Such statements involve known and unknown risks, uncertainties and other factors, which may ca
Slide 3: CEO Overview – December 2025 Quarter
CEO Overview – December 2025 Quarter Strong Sales Cash Inflows: Continue to improve FY26 v FY25 Receipts 3,4 For personal use only quarter-on-quarter customer cash inflows 6000 compared to FY25 4000 $ '000's Improved Cash Position: $6 million raised and 2000 $1 million loan facility repaid ¹ 0 FY25
Slide 4: Quarterly Highlights
Quarterly Highlights $19m MBIX Contract Award Engineering Contract for Syerston For personal use only • Major contract secured for Rio Tinto's • Selected to provide ion exchange Rincon Lithium Project in Argentina with circuit and refinery technology for the 30% of detailed design completed Scandium
Slide 5: Major Projects – Water & Industrial
Major Projects – Water & Industrial PHOSPHIX® Phosphate For personal use only in Ireland • ENVA PHOSPHIX® Commissioning: All major equipment delivered and commissioning phase now underway at the Ireland facility • Nyrstar DESALX® Project Progress: Phase 1 engineering completed with engineering compl
Slide 6: Major Projects – Resources and Critical Metals
Major Projects – Resources and Critical Metals For personal use only • Rio Tinto Rincon Project Progress: Approximately 30% of detailed design completed, aligned with project schedule for this strategic lithium extraction Heathgate Uranium U-Column initiative • Heathgate Resources U-Column Success:
Slide 7: Sunrise Syerston Scandium Project
Sunrise Syerston Scandium Project For personal use only Engineering Contract: Strategic Positioning: Clean TeQ secured contract for This contract establishes Clean designing the ion exchange circuit TeQ as a preferred downstream and refinery at Syerston¹ technology partner Technology Selection: Proj
Slide 8: Lithium Strategy: Extraction & Refining
Lithium Strategy: Extraction & Refining For personal use only Go2Lithium cDLE® Pilot Relocation: Successfully relocated and operationalised our pilot plant to the Middle East region to expand testing capabilities Regional Brine Evaluation Program: Conducting comprehensive assessments of local brines
Slide 9: ATA Tailings Dewatering
ATA® Tailings Dewatering Successful pilot programs For personal use only Multiple tailings types tested including gold, Pb-Zn, mineral sands, and phosphate with positive results Enhanced dewatering performance Technology demonstrates superior consolidation and moisture reduction compared to conventi
Slide 10: NematiQ Graphene Membranes
NematiQ Graphene Membranes For personal use only Breakthrough in PFAS Removal Laboratory testing shows exceptional performance of our graphene membranes in filtering PFAS compounds from water Scientific Validation Technology efficacy confirmed through rigorous peer- reviewed publication in leading s
Slide 11: Digitisation & Advanced Process Control
Digitisation & Advanced Process Control • Digital Twin Development: • AI-Assisted Process Optimisation: For personal use only Creating virtual replicas of physical plants to Implementing machine learning algorithms to simulate operations & optimise performance analyse operational data & suggest impr
Slide 12: Outlook – March 2026 Quarter
Outlook – March 2026 Quarter¹ For personal use only 1 Commissioning: Advance PHOSPHIX® project commissioning & complete Heathgate performance testing 2 Rincon MBIX: Progress the Rincon MBIX project toward 100% design and procurement stage 3 Nyrstar DESALX®: Progress project toward execution phase pe