Nextsource Materials Inc · TSX:NEXT

Nextsource Materials — Investor Presentation (April 2021)

30 slides from Nextsource Materials's investor presentation, Apr 12, 2021

  1. Slide 1: Molo Graphite Project

    The only project with graphite. Molo Graphite Project MADAGASCAR TSX : NEXT OTCQB : NSRCF

  2. Slide 2: Qualified person & forward looking statements

    Qualified person & forward looking statements Mr. Craig Scherba, P.Geo., President and CEO of NextSource Materials, is the qualified person who reviewed and approved the technical information provided in this presentation. Safe Harbour: This presentation contains statements that may constitute “forw

  3. Slide 3: Our strategic partner (47% fully-diluted ownership of NextSource)

    Our strategic partner (47% fully-diluted ownership of NextSource) Highly Experienced Team with significant experience across the mine development lifecycle. Sir Mick Davis • Former CEO of Xstrata Plc • Former CFO of Billiton plc and Chairman of Billiton Coal • Former Founder and partner at X2Resourc

  4. Slide 4: Sir Mick Davis, Chairman

    Sir Mick Davis Chairman 4 © NextSource Materials Inc.

  5. Slide 5: Fully funded and ready to begin construction

    Fully funded and ready to begin construction • Commissioning Molo mine in April 2022 • Mining & Environmental permits in place (40 years) • Offtakes being finalized for 100% of Phase 1 production • Full integrated strategy in place for supplying graphite from “mine to car” • Detailed Engineering and

  6. Slide 6: Molo flake graphite project in Fotadrevo, Madagascar

    Molo flake graphite project in Fotadrevo, Madagascar Mozambique Madagascar NO STRANGER TO MINING. $+8 Billion Ambatovy Nickel & Cobalt Project (Sherritt, Sumitomo, KORES) Shipping Ports: ★ Tulear & Soalara ★ Rio Tinto $1 Billion Mineral MOLO Sands Project ★ Graphite Project Fort Dauphin Shipping Por

  7. Slide 7: First-mover advantage with vertical integration

    First-mover advantage with vertical integration Mine - Initial Production ED • 17k tpa ND FU • Offtakes being finalized for 100% of product April 2022 Battery Anode Facility (BAF) • Initial production output TBC • Technical study being fast-tracked to confirm CAPEX & OPEX Q4 2022 TARGETED Phase 2 Ex

  8. Slide 8: 9-month build time

    Fully modular plant with minimal footprint Actual representation of the all-modular Molo mine. 9-month build time Source: 2019 Molo FS • Established and proven modular plant solutions fabricator currently supplying major CPG firms • Entire plant is 42 modules • Constructed off-shore (6 months) – at

  9. Slide 9: A very high-quality flake concentrate

    A very high-quality flake concentrate VERIFIED by end-users for ALL top demand markets The ONLY project with FLAKE GRADE DISTRIBUTION MARKETS PRODUCTS (Carbon) Jumbo Refractories, Foils for Fire 24% 96-97% • % of large & jumbo flake well (+48 mesh) Retardant & Electronics above global average Large

  10. Slide 10: Flake graphite market = ~750,000 Tpa

    Flake graphite market = ~750,000 Tpa REFRACTORIES BATTERIES GRAPHITE FOILS #1 #2 #3 ~495,000 Tpa ~180,000 Tpa ~75,000 Tpa Majority of demand tied Experiencing largest growth Fastest growing segment to traditional steel market The Source: Roskill, Benchmark picture can't 10 © NextSource Materials Inc

  11. Slide 11: Graphite has critical raw mineral status

    Graphite has critical raw mineral status Graphite is classified as a critical raw material by several G8 countries due to its essentiality to economic and national security. Batteries are now top of the agenda for countries around the world. USA (Presidential Executive Order) CANADA EUROPEAN UNION A

  12. Slide 12: Graphite demand by application

    Graphite demand by application Graphite has a significant and well-established traditional usage. Over and above this, is the demand as a critical battery material. Source: Benchmark Mineral Intelligence 12 © NextSource Materials Inc.

  13. Slide 13: Graphite's vital role

    Graphite’s vital role “ Our lithium ion batteries should be called nickel-graphite, because primarily the cathode is nickel and the anode side is graphite with silicon oxide. ” - Elon Musk Source: Tesla 13 © NextSource Materials Inc.

  14. Slide 14: Lithium ion battery construction

    Lithium ion battery construction * *may contain ~0%-5% SiO depending on chemistry Source: Electronic Component News; AmericanEnergy Technologies 14 © NextSource Materials Inc.

  15. Slide 15: EVs require significant amounts of graphite

    EVs require significant amounts of graphite Each 100kWh EV requires ~250 pounds of flake graphite. Rule of Thumb: 2.5 lbs of flake graphite per kWh, all li-ion chemistries combined 15 Source: InvestorIntel, Benchmark Minerals © NextSource Materials Inc.

  16. Slide 16: Natural graphite increasing in Li-ion batteries

    Natural graphite increasing in Li-ion batteries Synthetic graphite anodes currently dominate, but more natural flake based anodes are being used for price and performance purposes. Natural graphite is less expensive and provides greater energy density (range) than synthetic. Source: Benchmark Minera

  17. Slide 17: Graphite is the largest material by volume in Li-ion batteries

    Graphite is the largest material by volume in Li-ion batteries What 200 gigafactories would Battery raw material demand if all 200 gigafactories in the mean for raw material demand pipeline operate at 100% capacity (3.4 TWh) 5,000,000 March 2021 4,000,000 3.4 TWh 200 battery megafactories Tonnes per

  18. Slide 18: Demand for graphite for batteries expected to dwarf supply

    Demand for graphite for batteries expected to dwarf supply More graphite supply will need to come on line to meet demand. Source: Benchmark Mineral Intelligence 18 © NextSource Materials Inc.

  19. Slide 19: Graphite leading the demand for battery minerals

    Graphite leading the demand for battery minerals 19 © NextSource Materials Inc.

  20. Slide 20: Major battery demand underway

    Major battery demand underway Disruptor 20 © NextSource Materials Inc.

  21. Slide 21: Electrification of government fleets

    Electrification of government fleets “We’ll replace the entire fleet of federal vehicles with EVs”. - President Biden Electrifying the entire US federal fleet of vehicles would almost double the current global consumption of battery-grade graphite. Required new supply of battery raw material: • 83,0

  22. Slide 22: EV price parity is expected by 2024

    EV price parity is expected by 2024 Big oil is running out of racetrack. By 2040, a third of the global EV Li-Bs are nearing $100/kWh, car fleet will be EVs the parity price of ICE EVs will surpass ICE sales by 2038 Source: Bloomberg NEF 22 © NextSource Materials Inc.

  23. Slide 23: EV share of new car sales

    EV share of new car sales By 2040, over half of all passenger vehicles EVs will outsell ICE by 2038 sold globally will be electric. 2040 58% 2030 2025 28% 10 2020 2.7% % Source: 2021 Bloomberg NEF 23 © NextSource Materials Inc.

  24. Slide 24: Our Vertical Integration Strategy

    Our Vertical Integration Strategy NEWS RELEASE – Toronto, April 12, 2020 NextSource Materials Secures Partnership with Major Electric Vehicle Supply Chain to Build Battery Anode Facility 24 © NextSource Materials Inc.

  25. Slide 25: 3-way partnership with key processors in Tesla supply chain

    3-way partnership with key processors in Tesla supply chain PARTNER MINE SOURCE OEM SALES JAPANESE ANODE PRODUCERS MAJORITY OF JAPANESE OEMS & LEADING SPG PROCESSOR Competitive USP WITHIN TESLA SUPPLY CHAIN Pairs NextSource with a leading processor and a supplier of anode material within the Tesla s

  26. Slide 26: Complete vertical integration capability & IP

    Complete vertical integration capability & IP Turn-key facility with complete operational know-how • Immediate access to leading and established Exact duplicate of SPG spheroidization & coating technology IP for OEMs processing plant by current supplier to Tesla • Fast-tracks final QA/QC with OEMs t

  27. Slide 27: More graphite supply is needed

    More graphite supply is needed Graphite will play a major role in the decarbonization of the planet. • The graphite market is entering a period of unprecedented demand growth • Established lithium ion Anode demand will grow an average of 27% CAGR over next decade. technologies will dominate over the

  28. Slide 28: Barrier to entry and first-mover advantage

    Barrier to entry and first-mover advantage with • Will be the next major graphite project to reach production (April 2022) • First-mover advantage and barrier to entry • Exclusive 3-way partnership to supply value-added graphite to Tesla supply chain with established anode processors • Fast-tracking

  29. Slide 29: Quote from Sir Mick Davis, Chairman

    “My colleagues and I built Xstrata from humble beginnings by identifying the secular impacts in resource demand when China was urbanizing. I am convinced that we are on the cusp of an even larger secular change, driven by world- wide demand for battery material resources. Graphite is going to play a

  30. Slide 30: The only project with graphite.

    The only project with graphite. TSX : NEXT OTCQB : NSRCF 30

NextSource Materials — Investor Presentation (April 2021) on 6ix