Kinder Morgan, Inc. · NYSE:KMI

Kinder Morgan — Barclays CEO Energy-Power Conference 2013

39 slides from Kinder Morgan's conference presentation, Sep 12, 2013

  1. Slide 1: Companies Run By Shareholders, For Shareholders

    Companies Run By Shareholders, For Shareholders Steve Kean President & Chief Operating Officer September 12, 2013

  2. Slide 2: Forward-Looking Statements / Non-GAAP Financial Measures

    Forward-Looking Statements / Non-GAAP Financial Measures This presentation contains forward-looking statements. These forward-looking statements are identified as any statement that does not relate strictly to historical or current facts. In particular, statements, express or implied, concerning fut

  3. Slide 3: Kinder Morgan: Four Ways to Invest: KMI, KMP, KMR & EPB

    Kinder Morgan Four Ways to Invest: KMI, KMP, KMR & EPB 671MM Public Kinder Morgan, Inc. (65%) Float Market Equity $38.6B (a) Cash Debt 9.5B (b) dividends to KMI 296MM (d) Management/ shareholders (C-corp) (28%) Original S/H Enterprise Value $48.1B 1,036 MM shares (a) 2013E Dividend per Share $1.60 (

  4. Slide 4: Our Strategy

    Our Strategy Stay the Course Same Strategy Since Inception  Focus on stable fee-based assets that are core to North American energy infrastructure — Market leader in each of our business segments  Control costs — It’s the investors’ money, not management’s – treat it that way  Leverage asset foot

  5. Slide 5: Kinder Morgan: Unparalleled Asset Footprint

    Kinder Morgan Unparalleled Asset Footprint  3rd largest energy company in North America with combined enterprise value of approximately $105 billion (a)  Largest natural gas network in U.S. — Own an interest in / operate almost 70,000 miles of natural gas pipeline — Connected to every important U.

  6. Slide 6: 17 Years of Consistent Growth at KMP

    17 Years of Consistent Growth at KMP KMP Total Distributions (GP + LP) ($MM) KMP Annual LP Distribution per Unit (c) $3,997(a) $6.00 $4,000 $5.33 (a) GP LP $4.98 $3,500 $3,230 $5.00 $4.61 $4.40 $3,000 $2,737 $4.20 $4.02 $2,450 (b) $4.00 $3.48 $2,171 $3.13 $3.26 $2,500 $1,877 $2.87 $2,000 $3.00 $2.63

  7. Slide 7: Budget Guidance: Promises Made, Promises Kept

    Budget Guidance Promises Made, Promises Kept Promises Made Promises Kept KMI Budgeted KMI Actual Dividend: Dividend: 2011: $1.16 (a) 2011: $1.20 (a) 2012: $1.35 2012: $1.40 KMP Budgeted KMP Actual LP Distribution: LP Distribution: 2000: $1.60 2000: $1.71 KMP achieved 2001: $1.95 2001: $2.15 LP distr

  8. Slide 8: 2013 Guidance

    2013 Guidance Supported by Diversified Cash Flow CO2 S&T CO2 Oil Production 5% KMI Forecast: Natural Gas 14% Pipelines  KMI 2013 dividend: $1.60/sh (14.3% growth over 2012) Terminals 11% 56% — Original budgeted 2013 dividend was $1.57 B 3% 11%  Fully-consolidated year-end 2013 debt / EBITDA = 5.0x

  9. Slide 9: Toll Road-like Assets: Predominantly Fee-based

    Toll Road-like Assets: Predominantly Fee-based with Limited Commodity Exposure Significantly stable cash flow  Over 80% of 2013 cash flow is fee-based (a)  Almost 93% of 2013 cash flow is fee-based or hedged (a) Modest sensitivity to commodity prices and interest rates  Commodity prices — CO2 EOR

  10. Slide 10: 5-year Project Backlog

    5-year Project Backlog (a) $14 Billion of Currently Identified Organic Growth Projects Tremendous footprint provides $14B of currently identified growth opportunities over next 5 years 5-year Growth Capex Backlog ($Bn) (b) 2H 2013 2014 2015 2016+ Total Natural Gas Pipelines $0.9 $0.6 $0.1 $1.2 $2.8

  11. Slide 11: Vast Opportunity Set

    Vast Opportunity Set Leverages Diverse Energy Themes Pipeline / terminal expansions for Oilsands export to Asia Canadian natural Cochin conversion/ gas demand reversal for leading to expansion Oilsands diluent opportunities Northeast power demand growth to be fueled by natural gas Pipeline Terminals

  12. Slide 12: KMP / KMR

    KINDER/MORGAN KINDER MORGAN ENERGY PARTNERS, L.P. KMP /KMR

  13. Slide 13: KMP's Diversified Cash Flow

    KMP’s Diversified Cash Flow Natural Gas Pipelines 2013E KMP Segment  55% interstate pipelines Earnings before DD&A  31% gathering, processing & treating = $5.7 billion (a)  14% intrastate pipelines & storage Products Pipelines CO2 S&T  56% pipelines  44% associated terminals & transmix Natural

  14. Slide 14: KMP 2013 Growth Expenditure Forecast

    KMP 2013 Growth Expenditure Forecast Without dropdown & CPNO With acquisitions acquisition = $4.0 billion (a) = $10.6 billion CO2 CO2 S&T S&T 3% Natural Gas Oil Natural Gas CO2 Oil Pipelines Terminals 7% Pipelines Production 8% 17% 30% Products 9% Pipelines (b) 8% 25% 20% Terminals 73% Products Pipe

  15. Slide 15: Over $40B of Growth Capital Invested at KMP

    Over $40B of Growth Capital Invested at KMP (a,b,c) ($ in billions) Total Invested by Type Total Invested by Year $24 $11.0 $10.6 $20 JV Contributions $3.6 $16 $10.0 Expansion $12 $22.0 $9.0 Acquisition $8 $15.1 $8.0 $4 $7.0 $- Expansions Acquisitions $6.0 (c) $5.1 $5.0 Total Invested by Segment $4.

  16. Slide 16: How We Have Done: KMP Returns on Capital

    How We Have Done: KMP Returns on Capital 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 Segment ROI (a): Natural Gas Pipelines 13.3% 15.5% 12.9% 13.5% 14.0% 15.5% 16.7% 17.5% 16.9% 14.0% 11.9% 11.9% 11.9% Products Pipelines 11.9 11.8 12.8 12.9 12.4 11.6 11.8 13.2 12.5 13.4 13.7 12.

  17. Slide 17: EPB

    KINDER/MORGAN EL PASO PIPELINE PARTNERS j EPB

  18. Slide 18: EPB System Map

    EPB System Map Pipelines: 100% Wyoming Interstate Co. (WIC) 100% Colorado Interstate Gas (CIG) 100% Cheyenne Plains (CP) 100% Southern Natural Gas (SNG) 100% Elba Express (EEC) LNG: 100% Southern LNG (SLNG) 18

  19. Slide 19: EPB Focused on Natural Gas Pipelines

    EPB Focused on Natural Gas Pipelines 2013E EPB Segment Natural Gas Earnings before DD&A  Highly stable cash flow stream = $1.2 billion (a) — 89% interstate pipelines • Average contract life = ~7 years — 11% LNG • Average contract life = ~19 years (b) — Minimal throughput and commodity Natural Gas e

  20. Slide 20: KMI

    KINDER/MORGAN INC. KINDER MORGAN KMI

  21. Slide 21: KMI Remaining Assets

    KMI Remaining Assets Plan to Complete Dropdown Program by End of 2014 21

  22. Slide 22: KMI Overview

    KMI Overview  KMI pays regular c-corp dividend with attractive combination of yield plus growth  KMI Investments / Assets: — Investment in MLPs • KMP: – General Partner (GP) interest receives incentive distributions from KMP – KMI owns ~10% of total limited partner (LP) interests • EPB: – GP inter

  23. Slide 23: Risks

    Risks  Regulatory (KMP/EPB/KMI) — Pacific Products Pipeline FERC / CPUC cases — Periodic rate reviews — Legislative and regulatory changes  Crude oil production volumes (KMP)  Commodity prices (KMP) — CO2 oil production • 2013 budget assumes $91.68/Bbl realized price on unhedged barrels • 2013 bu

  24. Slide 24: Summary: Attractive Value Proposition

    Summary KMI, KMP, KMR & EPB: Attractive Value Proposition  Unparalleled asset footprint  Attractive dropdown inventory Long-term Growth Targets (a)  Significant, identified growth Next 3 to 5 Years (2012+) opportunities  KMP = ~5-6%  Established track record  EPB = ~5-6%  KMI = ~9-10%  Indus

  25. Slide 25: Appendix

    KINDER/MORGAN Appendix

  26. Slide 26: Operations Goals

    Operations Goals: Safe, Reliable, Efficient Operations  Continuous reduction in risk to the public, employees, contractors, assets and the environment  Continuous improvement in the efficiency and productivity of existing operations  Well-executed expansions and effective integration of acquired

  27. Slide 27: Efficiency

    Efficiency  Part of weekly asset review — Throughput — Operating costs (including energy use and L&U) — Sustaining capex updates  Detailed, “bottoms up” budget process for operating expenses and sustaining capex — Separately identify safety and compliance needs; separately track spending on those

  28. Slide 28: Compliance Summary

    Compliance Summary Making Compliance a Habit  Key elements: — Clear statement of requirement, assignment of responsibility and deadline for completion, and — Exception reporting to management  Performance: — OpsInfo expanded to nearly 370,000 compliance actions per year • Timely compliance: 99.6%

  29. Slide 29: Compliance Summary (Continued)

    Compliance Summary Making Compliance a Habit - Continued Env. Permits Business Hazardous Waste / DOT & DOT Damage Unit Transport SPCC (a) Safety PSM / RMP (b) Maintenance Security Contractors Prevention OpsInfo, Natural Gas OpsInfo & OpsInfo, INFOR OpsInfo & OpsInfo & INFOR EAM, ISNetworld Petris Pi

  30. Slide 30: Incidents per 1,000 Miles: Liquids Pipeline

    Incidents & Releases Liquids Pipeline ROW Liquids Pipeline Incidents per 1,000 Miles (a) Liquids Pipeline Release Rate (a) 1.0 50 Barrels per billion barrel miles 0.8 40 Incidents per 1,000 Miles 0.6 30 0.45 0.39 0.4 20 15.5 0.29 0.21 13.1 0.2 10 6.0 0.08 0.08 2.5 - - 0.01 0.1 - - 2006 2007 2008 200

  31. Slide 31: Incidents per 1,000 Miles: Natural Gas Pipeline

    Incidents & Releases Natural Gas Pipeline ROW Natural Gas Pipeline Incidents Rate (a) 1.0 Incidents per 1,000 Miles 0.8 0.6 0.4 0.32 0.30 0.27 0.27 0.2 0.13 0.13 0.04 - 2006 2007 2008 2009 2010 2011 2012 KM Incidents Current Industry Avg 2005 Industry Avg KM/EP Combined 3-yr Avg ____________________

  32. Slide 32: KMR 101

    KMR 101  KMR is KMP KMR Discount to KMP — KMR shares are pari passu with KMP units 10% — KMR dividend equal to KMP cash distribution, but paid in additional shares; effectively a dividend reinvestment 5% program (a) 0% — Like KMP units, KMR shares are tax efficient - but with simplified tax reporti

  33. Slide 33: Toll Road-like, Fee-based Business Model

    Toll Road-like, Fee-based Business Model Natural Gas Products Kinder Morgan Terminals CO2 Pipelines Pipelines Canada (KMP) (KMP) (KMP/EPB/KMI) (KMP) (KMP) – Interstate & LNG: take or pay – Take or pay, minimum – S&T: primarily minimum – Intrastate: ~75% take or pay (a) – Essentially no  Volume Secu

  34. Slide 34: Natural Gas Pipelines Segment Outlook

    Natural Gas Pipelines Segment Outlook Well-positioned connecting key natural gas resource plays with major demand centers Project Backlog:  $2.8 billion of identified growth projects over next five years (a), including: — TGP Northeast upgrade — LNG liquefaction (FTA @ Elba Island) — Eagle Ford gat

  35. Slide 35: Products Pipelines Segment Outlook

    Products Pipelines Segment Outlook Opportunities for growth from increased liquids production Project Backlog:  $1.0 billion of identified growth projects over next two years (a), including: — Cochin reversal & diluent conversion — Condensate processing — Sweeney lateral — Parkway — Double Eagle Lo

  36. Slide 36: Terminals Segment Outlook

    Terminals Segment Outlook Well-located in refinery / port hubs and inland waterways Project Backlog:  $2.1 billion of identified growth projects over next three years (a), including: — Liquids • Edmonton Phase I / II expansions • BOSTCO project • Houston terminal network expansion — Bulk • Deepwate

  37. Slide 37: CO2 Segment Outlook

    CO2 Segment Outlook Own and operate best source of CO2 for EOR (a) Project Backlog:  Identified growth projects totaling $1.3 billion and $1.4 billion in S&T and EOR (a), respectively, over next five years (b), including: — S&T • McElmo / Doe Canyon expansion • St. Johns build-out — Oil Production

  38. Slide 38: Kinder Morgan Canada Segment Outlook

    Kinder Morgan Canada Segment Outlook Sole oil pipeline from Oilsands to West Coast / export markets Project Backlog:  $5.4 billion expansion of TMPL TMX $5.4 Billion Expansion Long-term Growth Drivers:  Expand Oilsands export capacity to West Coast and Asia — Following successful open season, majo

  39. Slide 39: Kinder Morgan

    KINDER/MORGAN

Kinder Morgan — Barclays CEO Energy-Power Conference 2013 on 6ix