Boral Ltd.

Boral — Corporate Update (August 2021)

25 slides from Boral's corporate update, Aug 5, 2021

  1. Slide 1: Boral Berrima Cement Community Liaison Group meeting

    Build something great™ BORAL BERRIMA CEMENT 5 August 2021 Via Microsoft Teams (Virtual) > Community Liaison Group meeting

  2. Slide 2: Agenda

    Agenda ˃ Acknowledgement of Country, welcome, administration and safety moment ˃ Operations ˃ Environment ˃ Planning matters ˃ General business

  3. Slide 3: Meeting administration

    Meeting administration ˃ Acknowledgement of Country ˃ Welcome and re-introductions ˃ Safety moment ˃ Previous meeting of the Community Liaison Group ˃ 10 December 2020 ˃ Note: Presentations and meeting notes from previous meetings are also available from the Cement Works website – www.boral.com.au/b

  4. Slide 4: Operations

    Build something great™ BORAL BERRIMA CEMENT > Operations

  5. Slide 5: Operations update

    Operations update ˃ ZERO harm – is always our priority and the job is never done: ˃ No serious injuries or harm to people during FY21 (another good year looking after each other) ˃ 960 consecutive lost time injury (LTI) free days. Great deliberate focus by people ˃ Minor medical treatments were a to

  6. Slide 6: Operations update

    Operations update ˃ TEN – operational performance: ˃ Total clinker production for FY21 1.31Mt. Grey clinker 1.25Mt, Off white clinker 63kt. ˃ Major planned maintenance shutdown in March safely and successfully completed in 18 days. Main works being 40 metres of refractory reline of the kiln, re-bagg

  7. Slide 7: Environment

    Build something great™ BORAL BERRIMA CEMENT > Environment

  8. Slide 8: Environmental overview

    Environmental overview ˃ The 2021 Annual Environmental Management Review (May 2020 – April 2021) was submitted to DPIE in late June 2021 and acknowledged by DPIE in July 2021. Full report is available on the website. ˃ The following is a summary of management plan updates, monitoring, audits and com

  9. Slide 9: Management Plan Updates

    Management Plan Updates ˃ It is a requirement that we review our Management Plans at least every 3 years or after any modification or changes to the EPL. ˃ Boral undertook a review of the OEMP, and the sites Air Quality Management Plan & Noise Management Plan in April 2020 to reflect Mod 11 and 12 t

  10. Slide 10: Monitoring - Air Quality Management

    Monitoring - Air Quality Management ˃ During the reporting period the site implemented the trial real-time dust monitor which links directly to the control room along with the site Trigger Action Response Management Plan (TARP) for dust which the site monitors current and forecast weather to manage

  11. Slide 11: Air Quality Management

    Air Quality Management ˃ Dust Deposition trends from May 2017 – May 2021 All dust gauges were below the 4g/month annual average goal ˃ During the reporting period 14 complaints were received from the community in relation to deposited dust on vehicles and property, this was a decrease from 78 in 201

  12. Slide 12: Air Quality Management

    Air Quality Management ˃ Ambient Air Monitoring Program – HVAS. All readings were below the TSP annual average goal and PM10 24hour standard

  13. Slide 13: Noise Monitoring

    Noise Monitoring ˃ Boral manages noise on site in accordance with the Berrima Cement Works – Noise Management Plan (Boral 2018, updated April 2020), which describes the monitoring points, frequency and criteria. ˃ The Boral Cement Berrima works has a single noise limit condition for the total site,

  14. Slide 14: Independent Audit

    Independent Audit ˃ We are required to have our operations (development consent conditions and EPL conditions) audited every three years by an independent auditor approved by the DPIE ˃ During November 2020, Rob Byrnes from IEC undertook the audit covering 2017-2020. ˃ The audit was finalised and su

  15. Slide 15: Independent Audit

    Independent Audit ˃ The 2018 non-compliances were during the Solid Waste Derived Fuels Proof of Performance Trials, were of short duration and addressed at the time as part of the commissioning process. ˃ The High Volume Air Sampler (required every 6 days) did not operate on four occasions during 20

  16. Slide 16: Solid Waste Derived Fuels Planning matters

    Build something great™ BORAL BERRIMA CEMENT > Solid Waste Derived Fuels Planning matters

  17. Slide 17: Solid Waste Derived Fuels (SWDF) and Planning

    Solid Waste Derived Fuels (SWDF) and Planning CHALLENGES OPERATING WITH SWDF: ˃ To manage the volatile components within the kiln (naturally occur in SWDF materials) ˃ SOLUTION: Chloride Bypass System (Mod 13 – approved 31 May 2021) ˃ To compete with cheaper imports we need to operate more efficient

  18. Slide 18: Solid Waste Derived Fuels (SWDF) and Planning

    Solid Waste Derived Fuels (SWDF) and Planning ˃ Proposed modifications to the Cement Works consent (Mod14): ˃ Expansion to current storage and handling facilities at the site & feeding infrastructure ˃ An increase of truck deliveries and hours ˃ Increase consumption of SWDF materials within the kiln

  19. Slide 19: Solid Waste Derived Fuels (SWDF) and Planning

    Solid Waste Derived Fuels (SWDF) and Planning ˃ Proposed modifications to the Cement Works consent (Mod14): ˃ Traffic improvements - internal haulage route for trucks to access the Old Hume Highway and Hume Motorway. To be constructed on Boral land. ˃ Traffic improvements - additional site access pr

  20. Slide 20: Solid Waste Derived Fuels (SWDF) and Planning

    Solid Waste Derived Fuels (SWDF) and Planning ˃ Proposed modifications to the Cement Works consent (Mod14): ˃ Air quality and odour - continue operations within current consent limits. A report will be submitted outlining implications associated with increased SWDF consumption ˃ Greenhouse gas - no

  21. Slide 21: Other Planning matters

    Build something great™ BORAL BERRIMA CEMENT > Other Planning matters

  22. Slide 22: Other Planning Matters

    Other Planning Matters ˃ Berrima Colliery – Water Treatment System ˃ https://www.boral.com.au/berrima-colliery ˃ Long term solution - seeking to establish a long-term sustainable solution for the management of naturally rising water from the colliery ˃ First Step – obtaining the approval, commission

  23. Slide 23: General Business

    Build something great™ BORAL CEMENT BERRIMA > General Business

  24. Slide 24: Next meeting and close

    Next meeting and close ˃ General business ˃ Next meetings ˃ ‘Whole of Community’ meeting – meeting to be held in November. ˃ Boral Berrima Cement contacts: ˃ Berrima Cement Works Reception 4860 2222 ˃ www.boral.com.au/berrimacement ˃ feedback@boral.com.au ˃ Like us on Facebook: @Boral Australia

  25. Slide 25: Thank you for your attendance

    Build something great™ BORAL BERRIMA CEMENT > Thank you for your attendance