Bulletin Resources Limited · ASX:BNR

Bulletin Resources — Shareholder Meeting (November 2011)

21 slides from Bulletin Resources's shareholder meeting presentation, Nov 21, 2011

  1. Slide 1: Annual General Meeting

    For personal use only Annual General Meeting Martin Phillips, Managing Director 21 November 2011 Bulletin Resources Limited Unit A8, 435 Roberts Rd, Subiaco WA 6008 | phone (08) 9388 6921 | fax (08) 6316 3337| www.bulletinresources.com

  2. Slide 2: Disclaimer

    Disclaimer For personal use only This document has been prepared by Bulletin Resources Ltd (ACN 144 590 858) (Bulletin or the Company). No party other than Bulletin has authorised or caused the issue of this document, or takes responsibility for, or makes any statements, representations or undertaki

  3. Slide 3: Our Business Strategy

    Our Business Strategy For personal use only 1 Fast track Nicolson’s Gold Project to production  Investigate development options and optimise mine plan  Expedite approvals for mining and processing  Recommission the plant for modest capital outlay 2 Profitability and Growth  Expand resource inv

  4. Slide 4: 2011 Highlights

    2011 Highlights For personal use only  Resource increased 47% since listing to: • 1.4mt at 5.6g/t Au for 248,500oz  Mining feasibility study underway  Low capital requirements with major infrastructure already in place; • 120,000 tpa CIP facility • 2 MVA power station • Water bores, telecommunica

  5. Slide 5: 2011 Progress

    2011 Progress For personal use only Resource Drilling  16,000 metres of RC drilling completed since April  12,000 metres resource expansion program recently completed. Results pending Feasibility Study  Open pit and underground mining study being managed by AMC Consultants  Geotechnical study be

  6. Slide 6: 2011 Progress (cont'd)

    2011 Progress (cont’d) For personal use only Permitting  D. E. Cooper and Associates preparing new tails dam design and geotechnical assessment  Keith Lindbeck and Associates completed site flora and fauna surveys  Rockwater appointed for hydrology studies 6

  7. Slide 7: 2011 Progress (cont'd)

    2011 Progress (cont’d) For personal use only Successful testing of processing facility  2.1 MVA power station was re- energised and the crushing, mill, leach circuits restarted Ore characterised as free-milling  Laboratory scale testing of oxide, transitional and primary mineralisation returns hig

  8. Slide 8: Project Road Map

    Project Road Map For personal use only Final Options Study Feasibility Authorisation  Mine optimisations  Mine design and schedule  Engineering design Major Activities  Plant condition testing  Metallurgical/geotech testing  Equipment sourcing  Infrastructure testing  Infrastructure strategy

  9. Slide 9: Exploration Upside

    Exploration Upside For personal use only  Resource comprises a series of north-plunging lodes hosted along +2km long structure  All lodes remain open at depth  Limited drilling completed along strike of host structure  Numerous untested mineralised targets within greater lease area 9

  10. Slide 10: Regional Potential

    Regional Potential For personal use only  Project located in historic Halls Creek goldfield, site of WA’s first gold discovery  Only other recent gold mine development was at Palm Springs during the 1990s  Numerous acquisition opportunities 10

  11. Slide 11: Outlook

    Outlook For personal use only  Nicolson’s mining feasibility on track for Q1 2012  Statutory approvals for mining to be initiated  Investment decision subject to approvals and finance  Results from resource expansion drilling  Initiate exploration over satellite targets  Acquire additional pro

  12. Slide 12: APPENDIX

    For personal use only APPENDIX 12

  13. Slide 13: 2011 Resource

    2011 Resource For personal use only Grade Prospect Category Tonnes Ounces (g/t Au) Nicolson’s Open pit Indicated 520,800 5.70 95,400 Open pit Inferred 37,300 2.74 3,300 Total open pit 558,100 5.50 98,700 Underground Indicated 131,900 5.56 23,600 Underground Inferred 474,700 6.04 92,200 Total undergr

  14. Slide 14: 2011 Resource (cont'd)

    2011 Resource (cont’d) For personal use only Grade Prospect Category Tonnes Ounces (g/t Au) Wagtail area Open pit Indicated 16,700 7.56 4,000 Open pit Inferred 73,600 5.36 12,700 Total open pit 90,300 5.76 16,700 Underground Indicated - - - Underground Inferred 29,300 6.27 5,900 Total underground 29

  15. Slide 15: Nicolson's Long Section

    Nicolson’s Long Section For personal use only 19 200mN 19 400mN 19 600mN 19 800mN 300mRL Open Pit Production: 92,000t at 7.71 g/t Au 200mRL Main Lode Southern Lode 100mRL Foot Wall Lode Planned Drilling 0mRL Legend 0.5 – 10.0 Au gram-metres 10.0 – 20.0 Au gram-metres 0 Metres 100 > 20.0 Au gram-metr

  16. Slide 16: Rowdies Long Section

    Rowdies Long Section For personal use only 18 400mN 18 450mN 18 500mN 18 550mN 18600mN Open Pit Production: 12,000t at 2.2 g/t Au 6m @ 1.8 g/t Au Planned Drilling Planned Drilling 12m @ 2.8 g/t Au 6m @ 5.8 g/t Au 250mRL 7m @ 3.8 g/t Au 4m @ 12.4 g/t Au 4m @ 27.5 g/t Au 5m @ 2.0 g/t Au 4m @ 7.4 g/t A

  17. Slide 17: Wagtail Long Section

    Wagtail Long Section For personal use only 300mRL 18100mN 18200mN 18300mN 18400mN 3m @ 18.9 g/t Au ` 3m @ 27.9 g/t Au 3m @ 22.9 g/t Au 1m @ 24.3 g/t Au Planned Drilling 2m @ 20.9 g/t Au 2m @ 25.6 g/t Au 5m @ 10.5 g/t Au 17m* @ 21.8 g/t Au Planned Drilling 2m @ 10.3 g/t Au 6m @ 21.0 g/t Au 2m @ 9.0 g

  18. Slide 18: Exploration Potential

    Exploration Potential For personal use only 18 000mN 18 500mN 19 000mN 19 500mN 20 000mN 2.5 km Limit of current drilling Untested Potential Mill 800 m Wagtail Rowdies Nicolson’s Depth 200m 400m 600m 18

  19. Slide 19: Exploration Potential

    Exploration Potential For personal use only 19

  20. Slide 20: Competent Persons Statement

    Competent Persons Statement For personal use only The information in this table that relates to Mineral Resources is based on information compiled by Mr Ian Glacken, who is a Fellow of the AusIMM. Mr Glacken is a full time employee of Optiro Pty Ltd where he holds the title of Principal Consultant.

  21. Slide 21: Investment and Media inquiries

    For personal use only Investment and Media inquiries: Martin Phillips Managing Director Email: mphillips@bulletinresources.com Bulletin Resources Limited Unit A8, 435 Roberts Rd, Subiaco WA 6008 | phone (08) 9388 6921 | fax (08) 6316 3337| www.bulletinresources.com 21

Bulletin Resources — Shareholder Meeting (November 2011) on 6ix