Business
Power Ore reports 81 metres grading 1.02% CuEq and 52 metres grading 1.85% CuEq at Opemiska
Power Ore reports 81 metres grading 1.02% CuEq and 52 metres grading 1.85% CuEq at Opemisk...

About this update from Xxix Metal Corp.
[{"type":"text","content":"\n\n\n\nPower Ore reports 81 metres grading 1.02% CuEq and 52 metres grading 1.85% CuEq at Opemiska\n\n/* Style Definitions */\nspan.prnews_span\n{\nfont-size:8pt;\nfont-family:\"Arial\";\ncolor:black;\n}\na.prnews_a\n{\ncolor:blue;\n}\nli.prnews_li\n{\nfont-size:8pt;\nfont-family:\"Arial\";\ncolor:black;\n}\np.prnews_p\n{\nfont-size:0.62em;\nfont-family:\"Arial\";\ncolor:black;\nmargin:0in;\n}\n.prngen3{\nBORDER-TOP:black 1pt solid; BORDER-RIGHT:black 1pt solid; BORDER-BOTTOM:black 1pt solid; TEXT-ALIGN: CENTER; PADDING-LEFT:0.50em; BORDER-LEFT:black 1pt solid; PADDING-RIGHT:0.50em\n}\n.prnsbt0{\nBORDER-TOP:0pt\n}\n.prnbcc{\nBORDER-COLLAPSE: COLLAPSE\n}\n.prnsblb0{\nBORDER-LEFT:black 0pt\n}\n.prnvab{\nVERTICAL-ALIGN: BOTTOM\n}\n.prntbls{\nBORDER-TOP: black 1px solid; BORDER-RIGHT: black 1px solid; BORDER-COLLAPSE: collapse; BORDER-BOTTOM: black 1px solid; BORDER-LEFT: black 1px solid\n}\n.prnpl6{\nPADDING-LEFT:0.50em\n}\n.prnsbl0{\nBORDER-LEFT:0pt\n}\n.prnrbrb0{\nBORDER-RIGHT:black 0pt\n}\n.prnpr6{\nPADDING-RIGHT:0.50em\n}\n.prnsbtb0{\nBORDER-TOP:black 0pt\n}\n.prnsbb0{\nBORDER-BOTTOM:0pt\n}\n.prnsbr0{\nBORDER-RIGHT:0pt\n}\n\n\n\n\n\n\n\nCanada NewsWire\nTORONTO, Jan. 24, 2019\n\n\n\nTORONTO, Jan. 24, 2019 /CNW/ - PowerOre Inc. (\"Power Ore\" or the \"Company\") (TSX.V: PORE) is pleased to announce additional lengthy and high grade intersections from the Opemiska Copper Complex property (\"Opemiska\").  These previously unreleased drill holes include eight near surface diamond drill holes totalling 1,245 metres.  \nTable 1) Phase Two Drill Hole Compilation Results\nInterval (m)\nFrom (m)\nTo (m)\nGrade\nHole ID\nYear\nCopper Eq. (%)\nCopper (%)\nGold (g/t)\nSilver (g/t)\n81.0\n3.0\n84.0\n1.02\n0.86\n0.19\n2.98\nOP-2015-01\n2015\n52.4\n7.6\n60.0\n1.85\n1.39\n0.60\n4.93\nOP-2016-08\n2016\n21.6\n78.0\n99.6\n2.49\n1.58\n1.23\n6.17\nOP-2016-01\n2016\n20.6\n6.0\n26.6\n2.24\n2.05\n0.17\n8.30\nOP-2016-07\n2016\n9.8\n66.0\n75.8\n1.41\n0.35\n1.43\n6.83\nOP-2016-03\n2016\n6.0\n57.0\n63.0\n1.64\n1.28\n0.51\n0.00\nOP-2015-05\n2015\n4.0\n5.0\n9.0\n6.72\n5.07\n2.04\n25.00\nOP-2016-05\n2016\n1.8\n29.7\n31.5\n5.20\n4.43\n0.94\n12.90\nOP-2016-01\n2016\n*Copper Equivalent (\"Cu Eq.\") grade including gold and silver based on 100% recoveries is calculated using the following equation: Cu Eq. = [(Cu % / 20 / Cu price) + (Au grad...