Business

Xtra Energy Corp. Announces Commencement of Phase 1 Drilling Campaign at American Antimony Project, Churchill County, Nevada

Xtra Energy Corp. Announces Commencement of Phase 1 Drilling Campaign at American Antimony Project, Churchill County, Nevada.

articleXtra Energy Corp.July 16, 20253/company/xtra-energy-corp/news/xtra-energy-corp-announces-commencement-of-phase-1-drilling-campaign-at-american-antimony-project-churchill-county-nevada
Xtra Energy Corp. Announces Commencement of Phase 1 Drilling Campaign at American Antimony Project, Churchill County, Nevada

About this update from Xtra Energy Corp.

[{"type":"text","content":"\r\n\r\n \r\n \r\n Xtra Energy Corp. Announces Commencement of Phase 1 Drilling Campaign at American Antimony Project, Churchill County, Nevada\r\n \r\n \r\n\r\n\r\nXtra Energy Corp. Announces Commencement of Phase 1 Drilling Campaign at American Antimony Project, Churchill County, Nevada\r\n\r\n\r\n\r\n\r\n\r\nAUSTIN, TX / ACCESS Newswire / July 16, 2025 / Xtra Energy Corp. (OTCID:XTPT), a U.S.-based critical minerals exploration and development company, is pleased to announce the commencement of its Phase 1 Reverse Circulation (RC) drilling program at the American Antimony Project in Nevada. Drilling officially began on July 15, 2025.https://app.accessnewswire.com/imagelibrary/aa4c1ce7-b001-4967-8127-40d6993d468b/1049169/image.gif \r\n \r\n \r\n \r\n The Phase 1 program is being conducted by Harris Exploration Drilling, headquartered in Fallon, Nevada. Harris is a respected provider of exploration, geotechnical, and environmental drilling services across the United States and Canada. The program will be supervised by Robert Johansing, M.S. Economic Geology, QP, a Qualified Person with extensive experience in mineral exploration and project management throughout both the United States and Latin America.https://app.accessnewswire.com/imagelibrary/ccf35466-3c8d-46ce-86dc-01842e3d32b2/1049169/image.jpeg \r\n Figure 1 : Drilling Team Onsite at The American Antimony Project\r\n Program Details:\r\n \r\n RC drilling program: 20-30 holes\r\n Target depth: 300 to 500 feet per hole\r\n Total footage: Minimum of 6,000 feet\r\n Daily progress: ~300 feet per day (plus move time)\r\n Shift schedule: Single 10-12 hour shift per day\r\n Estimated drilling time: ~20 days\r\n Total program duration: ~25 days including moves and mobilization \r\n https://app.accessnewswire.com/imagelibrary/75a6cb81-d904-46cd-9242-b24d4e8e7b29/1049169/image.png \r\n Figure 2 : RC Drill Rig that will be utilized in Phase 1\r\n Drill targets are focused on testing down-dip and lateral extensions of historically productive stibnite (antimony sulfide) veins and felsite dike systems hosting disseminated stibnite, including the Antimony King, King Solomon, and Arrance corridors-all located within the 4-kilometer mineralized zone identified through historical mapping, sampling, and recent validation.\r\n \"With drills now turning, this marks the true beginning of subsur...

More updates from Xtra Energy Corp.