Business

Ximen Mining Corp Water Retention Plan Next Step for Kenville Mine Project

Nelson BCVancouver, British Columbia--(Newsfile Corp. - May 8, 2026) - Ximen Mining Corp. (TSXV: XIM) (FSE: 1XM) (OTC: XXMMF) (the "Company" or "Ximen") is pleased to provide the following update on its Kenville mine project, located in the historic Nelson mining camp in southeastern B.C.Consultant Engineer and Mine Manager at Kenville mine siteTo view an enhanced version of this graphic, please visit:https://images.newsfilecorp.com/files/3028/296587_f802979654599ba4_001full.jpgThe Company...

articleXimen Mining Corp.May 8, 20264/company/ximen-mining-corp/news/ximen-mining-corp-water-retention-plan-next-step-for-kenville-mine-project
Ximen Mining Corp Water Retention Plan Next Step for Kenville Mine Project

About this update from Ximen Mining Corp.

[{"type":"text","content":"Nelson BC","length":9,"tagName":"p","attribs":{"class":"nfSubHeading"},"className":""},{"type":"text","content":"Vancouver, British Columbia--(Newsfile Corp. - May 8, 2026) - Ximen Mining Corp. (TSXV: XIM) (FSE: 1XM) (OTC: XXMMF) (the "Company" or "Ximen") is pleased to provide the following update on its Kenville mine project, located in the historic Nelson mining camp in southeastern B.C.","length":300,"tagName":"p"},{"type":"image","alt":"","displaySize":"","headline":null,"caption":"","className":"","disableSlideshowImg":false,"size":{"original":{"width":550,"height":412,"url":"https://media.zenfs.com/en/newsfile_64/c9cc90f538b93f0f72257aeb39134d18"},"resized":{"url":"https://s.yimg.com/ny/api/res/1.2/dKKmlbjGs92sXw4pQ1zXFA--/YXBwaWQ9aGlnaGxhbmRlcjt3PTk2MDtoPTcxOQ--/https://media.zenfs.com/en/newsfile_64/c9cc90f538b93f0f72257aeb39134d18","width":550,"height":412},"resize_sm":{"url":"https://s.yimg.com/ny/api/res/1.2/1_A94aBahN.YWaAAFopoeQ--/YXBwaWQ9aGlnaGxhbmRlcjt3PTY0MDtoPTQ3OQ--/https://media.zenfs.com/en/newsfile_64/c9cc90f538b93f0f72257aeb39134d18","width":550,"height":412}},"href":"https://images.newsfilecorp.com/files/3028/296587_f802979654599ba4_001full.jpg","hrefExternal":true,"rel":"nofollow"},{"type":"text","content":"Consultant Engineer and Mine Manager at Kenville mine site","length":58,"tagName":"p","attribs":{}},{"type":"text","content":"To view an enhanced version of this graphic, please visit:https://images.newsfilecorp.com/files/3028/296587_f802979654599ba4_001full.jpg","length":137,"tagName":"p","attribs":{}},{"type":"text","content":"The Company reports that its engineering and environmental consultants were on the mine site last week to coordinate their input on completion of a water retention works design. The engineered design is required to be submitted to the Ministry of Energy and Critical Minerals for approval prior to commencement of construction. This item is required prior to mine construction under the Mines Act permit for the Kenville mine project.","length":434,"tagName":"p"},{"type":"text","content":"This is a key step in the work being done by the Company to advance this project toward construction of the new underground decline. The objective of the decline is to access multiple gold-bearing quartz veins in the areas west and south of the historic mine that were intersec...

More updates from Ximen Mining Corp.

Ximen Mining Corp.The CompanyKenvilleChristopher R. AndersonXimenXimen Mining CorpNewsfile Corp.TSXV