Business
InvestmentPitch Media Video Discusses Ximen Mining's Plans for Developing the Kenville Gold Mine and Brett Epithermal Gold Project in Southern British Columbia - Video Available on Investmentpitch.com
Vancouver, British Columbia--(Newsfile Corp. - January 23, 2020) -  Ximen Mining (TSXV: X...

About this update from Ximen Mining Corp.
[{"type":"text","content":"InvestmentPitch Media Video Discusses Ximen Mining's Plans for Developing the Kenville Gold Mine and Brett Epithermal Gold Project in Southern British Columbia - Video Available on Investmentpitch.comVancouver, British Columbia--(Newsfile Corp. - January 23, 2020) -  Ximen Mining (TSXV: XIM) (OTCQB: XXMMF) (FSE: 1XMA) has provided an update on its plans for developing the Kenville Gold mine and Brett Epithermal Gold Project in southern British Columbia.In 2019, Ximen acquired the former producing Kenville Gold Mine, located near Nelson, along with all existing permits, infrastructure and equipment. Historically, the Kenville mine produced 65,381 ounces of gold from 158,842 tonnes processed.For more information, please view the InvestmentPitch Media \"video\" which provides additional information about this news and the company. If this link is not enabled, please visit www.InvestmentPitch.com and enter \"Ximen\" in the search box.Cannot view this video? Visit:http://www.investmentpitch.com/video/0_l57jb0mu/Ximen-Mining-outlines-plans-for-Kenville-Gold-Mine-and-Brett-Epithermal-Gold-Property-both-in-Southern-British-ColumbiaThe company has initiated permitting to develop a new 1200 metre decline and do underground drilling. Once this work gets underway, the company will move toward extracting a bulk sample for offsite processing and then be in a position to move toward continuous production. To date, surface buildings and roads were rehabilitated, the portal site for the decline was stripped, and a new mine compressor was purchased. Nelson Power recently installed a new power pole near the new proposed portal site to allow for connection to the new line for a 3-phase installation with electricity generated from the Kootenays hydro dam to power the ventilation air system, compressors and pumps making the operation completely electric. Water and waste rock quality surveys were completed, showing that the mine drainage water is high quality and the waste rock is non-acid generating. The Brett Epithermal Gold property was acquired by Ximen in 2014 and has a history of surface exploration drilling, geophysical and geochemical surveys, as well as approximately 240 meters of underground drifting and raising. A 291 tonne bulk sample processed at the Trail smelter recovered a grade of 27.7 grams per tonne. Bonanza high-grade and bulk...