Originaltext
Diese Übersetzung bewerten
Mit deinem Feedback können wir Google Übersetzer weiter verbessern
Home
Wishbone Gold Plc
Drill Rig Mobilising to Red Setter Project
Published Apr 20 2026
5 min read

Drill Rig Mobilising to Red Setter Project

 

 

A picture containing text Description automatically generated

 20 April 2026

 

Wishbone Gold Plc

("Wishbone" or the "Company")

London AIM & Aquis: WSBN

 

Drill Rig Mobilising to Red Setter Project

 

Patersons Range, Western Australia

 

Wishbone Gold Plc is pleased to announce that a Reverse Circulation (RC) rig is mobilising from Perth to the Company's Red Setter Project in the Paterson Province of Western Australia, located 20km south-west of Greatland Gold Plc's (AIM and ASX: GGP) Telfer gold mine, and 50km east of Cyprium Metals Ltd's (ASX: CYM) Nifty copper mine (Figure 1).

 

The first phase of the 2026 drilling contract is for an estimated 3,500m of RC drilling at Red Setter, with the second phase of the contract for a further 4,500m of diamond drilling planned to start in about 3 weeks.

 

All drill rigs are tracked mounted which will improve mobility on site.

 

A heritage survey has also been completed on the proposed new road from Nifty to Red Setter. The final report is due in 3-4 week's time.

 

Richard Poulden, Wishbone Gold's Chairman, commented:

 

"We are very pleased to have the RC drill rig and drilling team mobilise from Perth to Red Setter. Apex Geoscience and support teams are on site and ready for their arrival. I look forward to announcing the start of drilling at Red Setter shortly for the estimated 3,500 metres of drilling. A second drill rig, a diamond drill rig, is due on site in about 3 week's time."

 

2026 drilling programme details

 

A 25-hole drill programme totalling approximately 9,000 metres has been designed to:

 

·      Test extensions of known gold-copper mineralisation

·      Evaluate continuity along the 4km diorite trend

·      Improve understanding of structural controls on mineralisation

·      Target zones of strongest alteration and sulphide mineralisation

 

Drilling will utilise reverse circulation pre-collars followed by diamond core tails, targeting depths of up to 400 metres.

 

Figure 1: WSBN Red Setter Project (Red) and Exploration Tenement applications (Blue) immediately surrounding the Telfer Mine, with new access road application to Nifty Copper Mine

 

 

END

 

For more information on Wishbone, please visit the Company's website.

www.wishbonegold.com.

 

For further information, please contact:

Wishbone Gold PLC


 

Richard Poulden, Chairman

 

Tel: +971 4 584 6284



Beaumont Cornish Limited


(Nominated Adviser and AQUIS Exchange Corporate Adviser)


Roland Cornish/Rosalind Hill Abrahams

Tel: +44 20 7628 3396



Cranborne Communications Ltd


George Hudson

Tel: +44 (0)7803 603130

 

 

About Reach announcements

This is a Reach announcement. Reach is an investor communication service aimed at assisting listed and unlisted (including AIM quoted) companies to distribute media only / non-regulatory news releases into the public domain. Information required to be notified under the AIM Rules for Companies, Market Abuse Regulation or other regulation would be disseminated as an RNS regulatory announcement and not on Reach.