Business
Winshear Successfully Completes Phase 1 Drill Program and Downhole EM Survey at the Portsoy Nickel-Copper-Cobalt Project, Scotland
VANCOUVER, British Columbia, May 26, 2026 (GLOBE NEWSWIRE) -- Winshear Metals Corp. (TSX-V: WINS, FRA: 9HR) reports that it has completed the Phase 1 drill program at the Rodburn Target on the Portsoy Nickel – Copper – Cobalt project, located in Aberdeenshire, Scotland. Assays will be reported as soon as received. The program comprised six drill holes for a total drilled length of 1,235.6m, with four holes drilled in the North Zone (524.5m) and two holes at the South Zone (711.1m). The downhole
About this update from Winshear Metals Corp.
[{"type":"image","alt":"Winshear Metals Corp.","displaySize":"","headline":null,"caption":"Winshear Metals Corp.","className":"","disableSlideshowImg":false,"size":{"original":{"width":300,"height":140,"url":"https://media.zenfs.com/en/globenewswire.com/0970a197fc30bd5bfd552b1e5c094927"},"resized":{"url":"https://s.yimg.com/ny/api/res/1.2/ymc7Yw8B0ZfKJ4QWo0jPcg--/YXBwaWQ9aGlnaGxhbmRlcjt3PTQyMDtoPTE5Ng--/https://media.zenfs.com/en/globenewswire.com/0970a197fc30bd5bfd552b1e5c094927","width":300,"height":140},"resize_sm":{"url":"https://s.yimg.com/ny/api/res/1.2/ymc7Yw8B0ZfKJ4QWo0jPcg--/YXBwaWQ9aGlnaGxhbmRlcjt3PTQyMDtoPTE5Ng--/https://media.zenfs.com/en/globenewswire.com/0970a197fc30bd5bfd552b1e5c094927","width":300,"height":140}},"lazy":false},{"type":"text","content":"VANCOUVER, British Columbia, May 26, 2026 (GLOBE NEWSWIRE) -- Winshear Metals Corp. (TSX-V: WINS, FRA: 9HR) reports that it has completed the Phase 1 drill program at the Rodburn Target on the Portsoy Nickel – Copper – Cobalt project, located in Aberdeenshire, Scotland. Assays will be reported as soon as received.","length":316,"tagName":"p"},{"type":"text","content":"The program comprised six drill holes for a total drilled length of 1,235.6m, with four holes drilled in the North Zone (524.5m) and two holes at the South Zone (711.1m).","length":170,"tagName":"p"},{"type":"text","content":"The downhole electromagnetic (“EM”) survey conducted in RDB030 detected a strong off-hole conductor which will be tested in the next round of drilling.","length":151,"tagName":"p"},{"type":"text","content":"North Zone Drilling","length":19,"tagName":"p"},{"type":"text","content":"Four drill holes were completed at the near-surface North Zone bulk tonnage target to determine which direction the mineralization was trending. These four holes followed up the two 2024 drillholes which intersected:","length":216,"tagName":"p"},{"type":"list","items":[{"val":[{"type":"text","content":"33m grading 0.56% Ni equivalent* (see footnote below the table below for nickel equivalent calculations), including 9m grading 0.77% Ni equivalent in drillhole RBD015","length":166,"tagName":"p"}]},{"val":[{"type":"text","content":"59m grading 0.45% Ni equivalent, including 9m grading 1.65% Ni equivalent in drillhole RBD016","length":93,"tagName":"p"}]},{"val":[{"type":"text","content":"See Figure 1 cross section showing the 2024 dri...