Business
News Release and Shareholder Update - Helio reports drill results from Kenge Target, SMP Gold Project and plans for 2009
Drill results include: up to 6.5m @ 9.9g/t Au and 19.2m @ 3.1 g/t Au TSX-V Trading Symbol: HRC ...

About this update from Winshear Metals Corp.
[{"type":"text","content":"\n\n\n\n Drill results include:\n up to 6.5m @ 9.9g/t Au and 19.2m @ 3.1 g/t Au\n\nTSX-V Trading Symbol: HRC Tel.: 604 - 638 8005\nE-mail: [email protected] Website: www.helioresource.com\n\n\nVANCOUVER, April 22 /CNW/ - Helio Resource Corp. ("Helio" or the\n"Company") (TSX-V: HRC) is pleased to provide an update on its corporate and\nexploration activities, and its exploration plans for 2009.\n\n\n2008 Drilling Results - Kenge Target\n------------------------------------\n\nA total of 34 diamond drill holes are reported, representing all remaining\ndrill results from the 2008 diamond drill programme. Holes were drilled into\nthe Kenge Main Zone, primarily as infill drill holes. Drilling extended gold\nmineralisation to a depth of over 260m, and mineralisation remains open to\ndepth.\n\nHighlights from this batch of drill holes include:\n\n-------------------------------------------------------------------------\n Hole No. From (m) Width (m) Grade - g/t Au Comment\n-------------------------------------------------------------------------\n SZD158 9.2 6.5 9.9\n-------------------------------------------------------------------------\n Incl. 12.5 0.6 73.4\n-------------------------------------------------------------------------\n SZD144 15.1 19.2 3.1\n-------------------------------------------------------------------------\n SZD114 162.3 11.7 1.3\n-------------------------------------------------------------------------\n SZD115 190.4 9.5 1.4\n-------------------------------------------------------------------------\n SZD116 216.9 12.6 1.3\n-------------------------------------------------------------------------\n SZD117 137.3 15.1 2.2\n-------------------------------------------------------------------------\n SZD119 163.9 11 2.0\n-------------------------------------------------------------------------\n SZD120 169.5 13.5 1.5\n-------------------------------------------------------------------------\n SZD121 187.3 4.7 3.6\n-------------------------------------------------------------------------\n SZD140 227.3 9.8 2.4\n-------------------------------------------------------------------------\n SZD145 11.53 25.9 1.2 Open\n-------------------------------------------------------------------------\n SZD148 16.7 14.3 1.7\n-------------------------------------------------------------------------\n SZD153 73...