Business
Helio's First drill results of 2011 Drill Programme confirm extension of mineralisation at Porcupine Target Resource - SMP Gold Project, Tanzania
Jun. 7, 2011 (Canada NewsWire Group) -- Up to 20m at 1.8g/t Au, 9m at 3.4g/t Au and 12m at 2...

About this update from Winshear Metals Corp.
[{"type":"text","content":"\n\n\n Jun. 7, 2011 (Canada NewsWire Group) -- \n\n#ReleaseContent TABLE\n{\n BORDER-COLLAPSE: collapse\n}\nTR.cnwUnderlinedCell TD\n{\n BORDER-BOTTOM: #000000 1px solid\n}\nTR.cnwDoubleUnderlinedCell TD\n{\n BORDER-BOTTOM: #000000 3px double\n}\nTR.cnwBoldUnderlinedCell TD\n{\n BORDER-BOTTOM: #000000 3px solid\n}\nTD.cnwUnderlinedCell\n{\n BORDER-BOTTOM: #000000 1px solid\n}\nTD.cnwDoubleUnderlinedCell\n{\n BORDER-BOTTOM: #000000 3px double\n}\nTD.cnwBoldUnderlinedCell\n{\n BORDER-BOTTOM: #000000 3px solid\n}\n#ReleaseContent TABLE.cnwBorderedTable TD\n{\n BORDER-RIGHT: black 1px solid;\n PADDING-RIGHT: 2px;\n BORDER-TOP: black 1px solid;\n PADDING-LEFT: 2px;\n PADDING-BOTTOM: 2px;\n BORDER-LEFT: black 1px solid;\n PADDING-TOP: 2px;\n BORDER-BOTTOM: black 1px solid;\n BORDER-COLLAPSE: collapse\n}\n#ReleaseContent TABLE TD\n{\n PADDING-RIGHT: 2px;\n PADDING-LEFT: 2px;\n PADDING-BOTTOM: 2px;\n PADDING-TOP: 2px\n}\n\n\nUp to 20m at 1.8g/t Au, 9m at 3.4g/t Au and 12m at 2.5g/t Au\n\n\nSecond Drill Rig Added to Programme\n\n\nVANCOUVER, June 7, 2011 /CNW/ - Helio Resource Corp (TSX-V: HRC) is\n pleased to announce the drill results from the first seven drill holes\n (for a total of 932m of diamond drilling) of this year's 20,000m drill\n campaign at the SMP gold project, Tanzania.\n\n\nThe drill results confirm a significant extension of the mineralisation\n around the Porcupine Target resource.\n\n\nPorcupine was one of the only two targets included in the initial NI\n 43-101 compliant resource calculation published in November 2010 (see\n news release dated November 30, 2010). Gold mineralisation has been\n identified in a total of 30 targets in the SMP project area.\n\n\nResults as reported come from the Main and Quill Zones, both part of the\n Porcupine Target (see the Porcupine Plan map at http://www.helioresource.com/i/pdf/2011-06-07_NRM1.pdf).\n\n\nHighlights include:\n\n\n\nGPD 94 - 12m at 2.5g/t Au - Main Zone\n\n\nGPD 95 - 9m at 3.4g/t Au - Main Zone\n\n\nGPD 96 - 20m at 1.8g/t Au - Quill Zone\n\n\nGPD 97 - 45m at 0.6g/t Au - Quill Zone\n\n\n\nA complete table of drill hole results is presented below.\n\n\nAt the Main zone, two holes, GPD94 and GPD95, were drilled 70m to the SW\n of the existing resource model, and therefore extend the boundaries of\n the resource, which remains open along strike to the SW and NE.  So...