Business
Helio reports excellent drill results from the Kenge Target - Mbenge Zone, SMP Gold Project, Tanzania
Drill results include: 15.8m @ 4.4g/t Au 16.0m @ 3.8g/t Au

About this update from Winshear Metals Corp.
[{"type":"text","content":"\n\n\n\n Drill results include:\n 15.8m @ 4.4g/t Au\n 16.0m @ 3.8g/t Au\n 32.9m @ 2.0g/t Au\n 29.0m @ 1.7g/t Au\n 16.3m @ 1.2g/t Au\n 8.0m @ 2.4g/t Au\n\nTSX-V Trading Symbol: HRC Tel.: 604 - 638 8007\nE-mail: [email protected] Website: www.helioresource.com\n\n\nVANCOUVER, Feb. 2 /CNW/ -\n\n\nKenge Target Drilling Update\n-----------------------------\n\n\nHelio Resource Corp. ("Helio" or the "Company") (TSX-V: HRC) is pleased\nto report the latest drill results from nine diamond drill holes from the\nMbenge Zone of the Kenge Target at the SMP Gold Project, Lupa Goldfields, SW\nTanzania.\n\n\nThe results confirm management's view that the Kenge Target has the\npotential to host a significant open-pittable gold deposit, in addition to the\npotential significant gold resource the company is testing at the Porcupine\nTarget (Company Press Release dated January 26, 2009).\n\n\nHighlights\n-----------\n\n- Drilling continues to intersect thick zones of mineralisation.\n- New results confirm that the Mbenge Zone is still open towards the\n east.\n- Mineralisation is still open to depth.\n\nDetailed results are presented in the links below:\n\n- Table of Drill Intercepts:\nhttp://www.helioresource.com/i/pdf/2009-02-02_NRM1.pdf\n\n- Drill Plan Map Kenge Target - SE and Mbenge Zones:\nhttp://www.helioresource.com/i/pdf/2009-02-02_NRM2.pdf\n\n- Long Section Kenge Target - Mbenge Zone:\nhttp://www.helioresource.com/i/pdf/2009-02-02_NRM3.pdf\n\n- SMP Plan Map:\nhttp://www.helioresource.com/i/pdf/2009-02-02_NRM4.pdf\n\n\nThe Mbenge Zone is the easternmost section of the Kenge Target (see link\nto plan map above).\n\n\nHoles SZD176, SZD182 and SZD183 were drilled to the NE of all previous\nMbenge diamond drill holes to investigate the fault offset. These holes\nsuccessfully intersected the mineralisation, notably in SZD183 which\nintersected 16m grading 3.8g/t Au.\n\n\nGeological interpretation of the drilling indicates that the Mbenge Zone\nis the eastwards-faulted extension of the SE Zone of the Kenge Target, and\nremains open along strike to the east. Reconnaissance Reverse Circulation\ndrilling conducted in 2007 (see Company news release dated October 29, 2007)\nindicates that mineralisation could extend at least a further 500m east of\nSZD183.\n\n\nABOUT THE SMP GOLD PROJECT\n---------------------------\n\n\nHel...