Business
West Point Gold Drills 80.8m of 1.23 g/t Au, 53.4m of 1.44 g/t Au, and 28.9m of 2.65 g/t Au at Tyro Main Vein
Vancouver, British Columbia--(Newsfile Corp. - November 12, 2025) - West Point Gold Corp. (TSXV: ...

About this update from West Point Gold Corp.
[{"type":"text","content":"West Point Gold Drills 80.8m of 1.23 g/t Au, 53.4m of 1.44 g/t Au, and 28.9m of 2.65 g/t Au at Tyro Main VeinVancouver, British Columbia--(Newsfile Corp. - November 12, 2025) - West Point Gold Corp. (TSXV: WPG) (OTCQB: WPGCF) (FSE: LRA0) (\"West Point Gold\" or the \"Company\") announces the remaining drill results from its shallow program, the initial phase of the 10,000 metre (m) drill program at its flagship Gold Chain Project in Arizona. The Company is reporting assay results for 6 drill holes, GC25-71 to GC25-75 and GC25-79, representing 471m. Highlights:Hole GC25-71 drilled 80.8m of 1.23 g/t Au, with mineralization starting only 1.5m downhole.Hole GC25-72 intersected 53.4m of 1.44 g/t Au, and Hole GC25-79 intersected 28.9m of 2.65 g/t Au on opposite sides of the same section, suggesting the mineralized zone is wider than previously thought.Hole GC25-73 intersected 51.8m of 1.44 g/t Au, revealing continuity along strike and dip above previous drilling.Drilling continues below the high-grade zone at northeast (NE) Tyro, with 3 holes completed (~700 m).\"The shallow portion of the ongoing 10,000m drill program appears to have achieved its objective to demonstrate continuity of mineralization from surface down to previous drilling and continued to confirm continuity of mineralization along strike. This has us well-positioned to complete a maiden resource in 2026. We are now drilling beneath the high-grade zone at NE Tyro and expect first results from these holes before year-end,\"stated Derek Macpherson, President and CEO.Figure 1: Plan view of the Main Tyro vein showing geology and drilling conducted in 2021, 2023, 2024 and 2025. Note the location of Hole Nos. GC25-71 to -75 and -79.To view an enhanced version of this graphic, please visit:https://images.newsfilecorp.com/files/5717/274111_41be575f54097897_002full.jpgTable 1: Drill ResultsHolesFrom (m)To (m)Width (m)Grade (g/t Au)GC25-711.5282.380.81.23Including1.5212.210.72.95Including30.582.351.81.26GC25-729.162.553.41.44GC25-7313.765.551.81.44GC25-7442.747.24.50.85GC25-7551.86412.21.00GC25-7912.241.128.92.65 All widths shown are downhole; true widths are approximately 70-90% of downhole widths.Figure 2. Longitudinal perspective of the Tyro Main and NE Zones, Showing Core and RC Drilling to Date. Holes GC25-71 to -75 and -79 are highlighted and described below...