Business
Blackpool completes winter drilling program
Blackpool completes winter drilling program.

About this update from Wescan Energy Corp.
[{"type":"text","content":"\n\n\n\nCALGARY, March 16 /CNW/ - Blackpool Exploration Ltd. (BPX.A: TSX Venture\nExchange) has completed its 2006-2007 winter drilling program. Five wells were\ndrilled on Company lands resulting in four gas wells and one standing well.\nDetails of the gas wells are as follows:\n\n\nLocation Blackpool Zone Flow Rate Status\n-------- Working Interest ---- --------- ------\n ----------------\nPouce Coupe 20% Halfway 750 mcfd Awaits tie-in\nPouce Coupe 12.8% Halfway 2.1 mmcfd Awaits tie-in\nCecil 21.5% Charlie Lake 600 mcfd Awaits tie-in\nCessford 19% Mannville 200 mcfd Awaits tie-in\n\n\nBlackpool's cumulative share of these gas rates is 586 thousand cubic\nfeet per day or 97 barrels of oil equivalent per day. All gas wells should be\ntied in and on production by mid-April 2007.\n\n\nBOEs may be misleading, particularly if used in isolation. A BOE\nconversion ratio of 6 mcf: 1bbl is based on an energy equivalency conversion\nmethod primarily applicable at the burner tip and does not represent a value\nequivalency at the wellhead.\n\n\nThe TSX Venture Exchange does not accept responsibility for the adequacy\n\n\nor accuracy of this release.\n\n\n","length":1381,"tagName":"div"}]