Business
Wallbridge Intersects 70.84 g/t Au over 5.35 metres and 32.26 g/t Au over 7.05 metres Within the Fenelon Main Gabbro
Wallbridge Intersects 70.84 g/t Au over 5.35 metres and 32.26 g/t Au over 7.05 metres With...

About this update from Wallbridge Mining Co. Ltd.
[{"type":"text","content":"\n\n\n\nWallbridge Intersects 70.84 g/t Au over 5.35 metres and 32.26 g/t Au over 7.05 metres Within the Fenelon Main Gabbro\n\n/* Style Definitions */\nspan.prnews_span\n{\nfont-size:8pt;\nfont-family:\"Arial\";\ncolor:black;\n}\na.prnews_a\n{\ncolor:blue;\n}\nli.prnews_li\n{\nfont-size:8pt;\nfont-family:\"Arial\";\ncolor:black;\n}\np.prnews_p\n{\nfont-size:0.62em;\nfont-family:\"Arial\";\ncolor:black;\nmargin:0in;\n}\n.prngen4{\nBORDER-TOP:black 1pt solid; BORDER-RIGHT:black 1pt solid; VERTICAL-ALIGN: BOTTOM; BORDER-BOTTOM:black 1pt solid; TEXT-ALIGN: CENTER; PADDING-LEFT:0.50em; BORDER-LEFT:black 1pt solid; PADDING-RIGHT:0.50em\n}\n.prngen1{\nBORDER-TOP:0pt; BORDER-RIGHT:0pt; BORDER-COLLAPSE: COLLAPSE; BORDER-BOTTOM:0pt; BORDER-LEFT:0pt\n}\n.prngen3{\nBORDER-TOP:black 0pt; BORDER-RIGHT:black 0pt; VERTICAL-ALIGN: BOTTOM; BORDER-BOTTOM:black 0pt; PADDING-LEFT:0.50em; BORDER-LEFT:black 0pt; PADDING-RIGHT:0.50em\n}\n.prntbls{\nBORDER-TOP: black 1px solid; BORDER-RIGHT: black 1px solid; BORDER-COLLAPSE: collapse; BORDER-BOTTOM: black 1px solid; BORDER-LEFT: black 1px solid\n}\n\n\n\n\n\n\n\nCanada NewsWire\nTORONTO, May 19, 2020\n\n\n\nTORONTO, May 19, 2020 /CNW/ - Wallbridge Mining Company Limited (TSX:WM, FWB: WC7) (\"Wallbridge\" or the \"Company\") is pleased to announce further intersections from the definition drilling outlining high-grade shoots at shallow depths adjacent to the existing mine workings within the Main Gabbro area on its 100%-owned Fenelon Gold Property (\"Fenelon\" or the \"Property\"). \n\n \n \n\n\n\n\n\n\n\n \nResults announced today include 70.84 g/t Au over 5.35 metres in hole 20-5150-022, 32.26 g/t Au over 7.05 metres in hole 20-5150-027 in the Naga Viper Zone as well as 51.37 g/t Au over 2.10 metres in hole 19-0985-007 in the Cayenne Zone.\nMain Gabbro Definition Drilling Results\n\"In addition to delivering exceptional results, the definition drilling campaign in the Main Gabbro has further defined the near surface zones immediately surrounding existing infrastructure. This allows us to advance the mine planning required with the goal of taking the Main Gabbro into production in the future while exploration and expansion of Tabasco and Area 51 continues,\" stated Francois Demers, Vice President, Mines & Projects of Wallbridge. \"Eventual production from the Main Gabbro would likely...