Business
Wallbridge Announces Receipt of Permits, Approval to Proceed with Bulk Sample at Fenelon Gold
Wallbridge Announces Receipt of Permits, Approval to Proceed with Bulk Sample at Fenelon G...

About this update from Wallbridge Mining Co. Ltd.
[{"type":"text","content":"\n\n\n\nWallbridge Announces Receipt of Permits, Approval to Proceed with Bulk Sample at Fenelon Gold\n\n/* Style Definitions */\nspan.prnews_span\n{\nfont-size:8pt;\nfont-family:\"Arial\";\ncolor:black;\n}\na.prnews_a\n{\ncolor:blue;\n}\nli.prnews_li\n{\nfont-size:8pt;\nfont-family:\"Arial\";\ncolor:black;\n}\np.prnews_p\n{\nfont-size:0.62em;\nfont-family:\"Arial\";\ncolor:black;\nmargin:0in;\n}\n\n\n\n\n\n\n\nCanada NewsWire\nTORONTO, Jan. 16, 2018\n\n\n\nTORONTO, Jan. 16, 2018 /CNW/ - Wallbridge Mining Company Limited (TSX:WM, FWB: WC7) (\"Wallbridge\") is pleased to announce three significant milestones toward commencement of the planned 35,000 tonne bulk sample at its 100%-owned Fenelon Gold property: \n\n\nreceipt of the Certificate of Approval (\"C of A\") from the Ministère du Développement durable, de l'Environnement et de la Lutte contre les changements climatiques (\"MDDELCC\");\nthe hiring of Mr. Marc Leclair as Project Manager; and,\nBoard approval and the start of preparations for commencement of the bulk sample.\n\n \n \n\n \n\n\"We are excited to have received all the required permits to proceed with the Fenelon bulk sample,\" stated Marz Kord, President and CEO. \"The bulk sample will enable Wallbridge to better evaluate the grade and ultimate size potential of the Fenelon deposit. Drilling from underground will enable us to demonstrate the grade and continuity of the deposit in the top 100 metres and to better follow the deposit's extensions along strike and to depth.\"\n\nWith the C of A in hand, Wallbridge has received approval from the Board of Directors to move forward with the bulk sample. Preparations for dewatering the existing underground workings, treating the water prior to discharge, extending the underground ramp and level developments and extracting 35,000 tonnes of ore have begun. Dewatering of the first level is expected to be complete in April, at which time the Company plans to move a drill underground for definition and exploration drilling. Wallbridge expects to begin ore delivery in the second half of 2018 and completion of the bulk sample during 2018.\n\nIn addition, Wallbridge has hired Mr. Marc Leclair, a seasoned mining professional as the Project Manager for the Fenelon bulk sample. Mr. Leclair has more than 30 years of mining experience in large and small mines and startup op...