Business

CMC Metals Intersects Numerous High-Grade Intersections Including 2.3 meters of 4,910.8 g/t Silver Equivalent Extending the TM West Vein by 360 meters at Silver Hart

NOT FOR DISSEMINATION OR DISTRIBUTION INTO THE UNITED STATES OR THROUGH UNITED STATES NEWSWI...

articleWalker Lane Resources Ltd.December 8, 20213/company/walker-lane-resources-ltd/news/cmc-metals-intersects-numerous-high-grade-intersections-including-23-meters-of-49108-gt-silver-equivalent-extending-the-tm-west-vein-by-360-meters-at-silver-hart
CMC Metals Intersects Numerous High-Grade Intersections Including 2.3 meters of 4,910.8 g/t Silver Equivalent Extending the TM West Vein by 360 meters at Silver Hart

About this update from Walker Lane Resources Ltd.

[{"type":"text","content":"CMC Metals Intersects Numerous High-Grade Intersections Including 2.3 meters of 4,910.8 g/t Silver Equivalent Extending the TM West Vein by 360 meters at Silver HartNOT FOR DISSEMINATION OR DISTRIBUTION INTO THE UNITED STATES OR THROUGH UNITED STATES NEWSWIRE SERVICESVANCOUVER, BC / ACCESSWIRE / December 8, 2021 / CMC Metals Ltd. (TSXV:CMB)(Frankfurt:ZM5N)(OTC PINK:CMCZF) (\"CMC\" or the \"Company\") is pleased to announce a very successful drill program at Silver Hart. This program produced multiple high-grade silver-lead-zinc intersections in the TM West Vein including 2.3 meters of 4,910.8 g/t silver equivalent. In total 2,100 meters (19 holes) of diamond drilling was completed, a majority of which focused on the TM West vein in the Main Zone. Drilling also resulted in an extension of the TM West Vein structure for 360 meters. The Main Zone requires a lot of additional drilling to fully evaluate the resource that exists within it. The Company notes that there is considerable opportunity to further extend the TM west vein and extend other known mineralized vein systems within the Main Zone at Silver Hart. This work will be incorporated into the planning and implementation of future drilling programs.Highlights of the drill results include: 2021 Highlights of Drill Results HoleFromToLengthSilverCopperLeadZincGoldAg EqComments (m)(g/t)(%)(%)(%)(g/t)(g/t) 21-1854.354.50.211530.370.34241.12074.64 21-3055.959.83.916.7-0.150.87 49.58 including58.258.50.367.90.040.28 343.73 21-3162.070.68.6295-0.10.57 316.57 including70.270.60.452790.840.521.1 6065.85 21-329095.65.663.9-0.11.79 126.28 including9495.61.61250.070.25.57 322.03elevated copper and gold 21-32105105.40.491.80.080.17.7 358.36 21-3370.581.310.88130.161.67.89 1130.32 including7375.32.335900.666.632.9 4910.8 and8181.30.3177--13.8 638.47 21-3465661167--1.3 207.48 21-3588.4890.626.20.030.054 163.69 and9090.50.58190.094.34.4 1082.09 21-3661.662.10.529-0.12.8 125.15 Notes:AgEq g/t grades were calculated as followsAgEq g/t = (Ag price/g x Ag grade ppm + Cu price/g x Cu grade ppm + Pb price/g x Pb grade ppm + Zn price/g x Zn grade ppm)/Ag price/gMetal prices used: Ag = USD 23.30/oz; Cu = USD 6120/tonne; Pb = USD 1892/tonne; Zn = USD 2505/tonne (The prices are based on a 3-year trailing average)A drill hole location map and hole coordinates will be placed on the Company website at www...

More updates from Walker Lane Resources Ltd.