Business
Vow ASA: Contract of EUR 27 million awarded for equipment deliveries to four newbuilds
Oslo, 23 February 2026: Vow ASA (ticker OSE: VOW) and its subsidiary Scanship have received a purchase order from a major European shipyard of EUR 27 million. This order covers equipment for four new build Cruise vessels. The vessels are a continuation of an existing platform. Equipment deliveries have been agreed for four confirmed vessels under the contract. Deliveries will start in April 2027 for the first vessel and continue for sister vessels throughout 2029. The first vessel is scheduled t
About this update from Vow Asa
[{"type":"image","alt":"Vow ASA","displaySize":"","headline":null,"caption":"Vow ASA","className":"","disableSlideshowImg":false,"size":{"original":{"width":86,"height":25,"url":"https://media.zenfs.com/en/globenewswire.com/c5ddeae21a77dfbd191a2eab34578aea"},"resized":{"url":"https://s.yimg.com/ny/api/res/1.2/Hh9aJUCuLYc8tiDj7pWPVw--/YXBwaWQ9aGlnaGxhbmRlcjt3PTExMDtoPTMyO2NmPXdlYnA-/https://media.zenfs.com/en/globenewswire.com/c5ddeae21a77dfbd191a2eab34578aea","width":86,"height":25}},"lazy":false},{"type":"text","content":"Oslo, 23 February 2026: Vow ASA (ticker OSE: VOW) and its subsidiary Scanship have received a purchase order from a major European shipyard of EUR 27 million. This order covers equipment for four new build Cruise vessels. The vessels are a continuation of an existing platform.","length":382,"tagName":"p","attribs":{}},{"type":"text","content":"Equipment deliveries have been agreed for four confirmed vessels under the contract. Deliveries will start in April 2027 for the first vessel and continue for sister vessels throughout 2029. The first vessel is scheduled to enter operation by mid of 2029, and the last one in 2031. Vessel number three and four are subject to cancellation rights valid until 30.09.2026.","length":369,"tagName":"p","attribs":{}},{"type":"text","content":"“Through this contract, we continue our long-standing cooperation with the shipyard and the cruise line. The vessels will be fully equipped with Scanship systems, reinforcing our joint commitment to reliable and sustainable solutions,” says Gunnar Pedersen, CEO of Vow ASA.","length":333,"tagName":"p","attribs":{}},{"type":"text","content":"With Scanship technology onboard, all wastewater on the ships will be purified according to the requirements in the Baltic Sea and Alaskan State waters, which are to date the highest standards at sea. All residue sludge from the wastewater, along with food waste and other biogenic waste from hotel operations, will undergo several processing steps such as dewatering, homogenization, drying, and finally incineration.","length":428,"tagName":"p","attribs":{}},{"type":"text","content":"The waste management system further enhances the abord circular economy, recover...