Business

VIZSLA COPPER COMMENCES MAJOR DRILL PROGRAM AT THE THIRA DISCOVERY, POPLAR PROJECT

VIZSLA COPPER COMMENCES MAJOR DRILL PROGRAM AT THE THIRA DISCOVERY, POPLAR PROJECT Canada...

articleVizsla Copper CorpFebruary 4, 20264/company/vizsla-copper-corp/news/vizsla-copper-commences-major-drill-program-at-the-thira-discovery-poplar-project
VIZSLA COPPER COMMENCES MAJOR DRILL PROGRAM AT THE THIRA DISCOVERY, POPLAR PROJECT

About this update from Vizsla Copper Corp

[{"type":"text","content":"\n\n\nVIZSLA COPPER COMMENCES MAJOR DRILL PROGRAM AT THE THIRA DISCOVERY, POPLAR PROJECT\n\n/* Style Definitions */\nspan.prnews_span\n{\nfont-size:8pt;\nfont-family:\"Arial\";\ncolor:black;\n}\na.prnews_a\n{\ncolor:blue;\n}\nli.prnews_li\n{\nfont-size:8pt;\nfont-family:\"Arial\";\ncolor:black;\n}\np.prnews_p\n{\nfont-size:0.62em;\nfont-family:\"Arial\";\ncolor:black;\nmargin:0in;\n}\n.prnsbbb1{\nBORDER-BOTTOM:black 1pt\n}\n.prnsblb1{\nBORDER-LEFT:black 1pt\n}\n.prnsbtb1{\nBORDER-TOP:black 1pt\n}\n.prnpr2{\nPADDING-RIGHT:0.17em\n}\n.prnbcc{\nBORDER-COLLAPSE: COLLAPSE\n}\n.prnrbrb1{\nBORDER-RIGHT:black 1pt\n}\n.prnpl2{\nPADDING-LEFT:0.17em\n}\n.prnml4{\nMARGIN-TOP:0em; MARGIN-RIGHT:0em; MARGIN-BOTTOM:0em; MARGIN-LEFT:0.33em !IMPORTANT\n}\n\n\n\n\n\nCanada NewsWire\n\n\nVANCOUVER, BC, Feb. 4, 2026 /CNW/ - Vizsla Copper Corp. (TSXV: VCU) (OTCQB: VCUFF) (FRANKFURT: 97E0) (\"Vizsla Copper\" or the \"Company\") is pleased to report drilling is now underway at the Poplar Project (the \"Poplar Project\" or \"Poplar\"), central British Columbia. Up to 8,000 meters of drilling is planned with two drill rigs focused on expanding the recently discovered Thira porphyry copper-molybdenum system and evaluating additional high-priority porphyry targets across the broader Thira alteration corridor.\nHIGHLIGHTS\nSignificant drill program has commenced: Winter drilling has commenced at the Poplar Project with up to 8,000 meters of drilling planned in approximately 16 drill holes, targeting expansion of the Thira copper-molybdenum discovery and evaluating additional high-priority porphyry targets.Expansion of the Thira discovery: Drilling at Thira is designed to evaluate the lateral and vertical extent of the porphyry-related mineralization discovered in 2025, as well as the geological and structural controls on higher-grade zones. Importantly, mineralization at Thira remains open laterally and at depth.Exploring for additional porphyries within Thira alteration corridor: A second drill rig is evaluating additional porphyry targets at Camp Lake and Copper Pond along the >8 kilometre Thira alteration corridor. Targets are supported by coincident chargeability and conductivity anomalies, extensive hydrothermal alteration, and geochemical signatures consistent with porphyry copper-molybdenum systems.\"We are very excited to kick...

More updates from Vizsla Copper Corp