Business

Vista Gold Confirms Strong Economics for Mt Todd Gold Project With Re-sized 15,000 Tonnes Per Day Feasibility Study

After-Tax NPV (5%) of US$1.1 Billion with an After-Tax IRR of 27.8% at $2,500/oz After-...

articleVista Gold CorpJuly 29, 20254/company/vista-gold/news/vista-gold-confirms-strong-economics-for-mt-todd-gold-project-with-re-sized-15000-tonnes-per-day-feasibility-study
Vista Gold Confirms Strong Economics for Mt Todd Gold Project With Re-sized 15,000 Tonnes Per Day Feasibility Study

About this update from Vista Gold Corp

[{"type":"text","content":"Vista Gold Confirms Strong Economics for Mt Todd Gold Project With Re-sized 15,000 Tonnes Per Day Feasibility Study\n\n\n .bwalignc { text-align: center; list-style-position: inside }\n.bwalignr { text-align: right; list-style-position: inside }\n.bwblockalignl { margin-left: 0px; margin-right: auto }\n.bwcellpmargin { margin-bottom: 0px; margin-top: 0px }\n.bwleftsingle { border-left: solid black 1pt }\n.bwlistcircle { list-style-type: circle }\n.bwlistdecimal { list-style-type: decimal }\n.bwlistdisc { list-style-type: disc }\n.bwmarginl1 { margin-left: 30px }\n.bwpadb3 { padding-bottom: 4px }\n.bwpadb4 { padding-bottom: 5px }\n.bwpadl0 { padding-left: 0px }\n.bwpadl1 { padding-left: 5px }\n.bwpadl3 { padding-left: 15px }\n.bwpadl4 { padding-left: 20px }\n.bwpadr0 { padding-right: 0px }\n.bwrightsingle { border-right: solid black 1pt }\n.bwrowaltcolor0 { background-color: #cceeff }\n.bwrowaltcolor1 { background-color: #d3d3d3 }\n.bwsinglebottom { border-bottom: solid black 1pt }\n.bwtablemarginb { margin-bottom: 10px }\n.bwtopsingle { border-top: solid black 1pt }\n.bwvertalignb { vertical-align: bottom }\n.bwvertalignm { vertical-align: middle }\n.bwvertalignt { vertical-align: top }\n.bwwidth1 { width: 1% }\n.bwwidth100 { width: 100% }\n.bwwidth11 { width: 11% }\n.bwwidth12 { width: 12% }\n.bwwidth15 { width: 15% }\n.bwwidth16 { width: 16% }\n.bwwidth19 { width: 19% }\n.bwwidth20 { width: 20% }\n.bwwidth25 { width: 25% }\n.bwwidth39 { width: 39% }\n.bwwidth40 { width: 40% }\n.bwwidth50 { width: 50% }\n.bwwidth51 { width: 51% }\n.bwwidth55 { width: 55% }\n.bwwidth57 { width: 57% }\n.bwwidth7 { width: 7% }\n.bwwidth73 { width: 73% }\n.bwwidth9 { width: 9% }\n \n\n\n\n\n\n After-Tax NPV (5%) of US$1.1 Billion with an After-Tax IRR of 27.8% at $2,500/oz\n \n\n\n\n\n After-Tax NPV (5%) of US$2.2 Billion with an After-Tax IRR of 44.7% at $3,300/oz\n \n\n\n\n\n\n Vista Gold Corp. (NYSE American and TSX: VGZ) is pleased to announce positive results of a 15,000 tonnes per day (“tpd”) feasibility study (the “Study” or the “2025 FS”) for its Mt Todd gold project (“Mt Todd” or the “Project”). The Study provides a favorable development alternative to Vista’s previous feasibility study completed in 2024 at 50,000 tpd (the “2024 FS”). All currency va...

More updates from Vista Gold Corp