Business
Drilling Results at Vista's Mt. Todd Project Identify Long Intervals of Gold Mineralization With Higher Grades
DENVER, Nov. 12 /CNW/ -- Vista Gold Corp. (Amex: VGZ; TSX) ("Vista" or the "Company") is pleased ...

About this update from Vista Gold Corp
[{"type":"text","content":"\n\n\n\nDENVER, Nov. 12 /CNW/ -- Vista Gold Corp. (Amex: VGZ; TSX) ("Vista" or\nthe "Company") is pleased to report on the results of six core holes drilled\nas part of a fourteen-hole 9,006 meter drilling program completed at the\nBatman Deposit at its Mt. Todd Project in Northern Territory, Australia. The\nresults from the first five holes were reported previously in Vista's press\nreleases dated July 21 and September 3, 2008. Management believes the results\nconfirm the continuity of mineralization extending down-dip from the 2007\ndrilling results (previously reported in Vista's May 30, 2007 and September 4,\n2007 press releases) and demonstrate the same pattern of higher gold grades at\ndepth that contributed to a 65% increase in the measured and indicated\nresources as reported in Vista's February 27, 2008 press release. Of the\nfourteen holes completed in this program, one was drilled to obtain a sample\nfor ongoing metallurgical testing (hole VB08-041). Eleven holes were drilled\nto intersect the untested mineralization down-dip from the 2007 drilling\nlocated within the pit shape evaluated as part of the Preliminary Economic\nAssessment, the results of which were reported in Vista's January 4, 2007\npress release. Two holes were drilled to test the continuity of\nmineralization below the previously evaluated pit shape (holes VB08-039 &\n-040).\n\n\nA summary of the gold assay and preliminary copper assay results of the\nlatest six holes are shown below:\n\n\n Gold Gold\nDrill Interval Intercept (grams/ Copper Including Intercept (grams/ Copper\n Hole (meters) (meters) tonne) (ppm) (meters) (meters) tonne) (ppm)\n\n\nVB08032 191-220 29 1.05 356\n 310-629 319 1.11 582 412-533 121 1.87 717\n 432-511 79 2.18 841\nVB08033 Hole abandoned at 42m and re-collared as VB08034\nVB08034 600-621 21 0.68 506\n 630-706 76 0.77 736 695-706 11 1.64 590\nVB08035 281-392 111 0.63 318 430-464 34 1.54 363\n 417-544 127 1.84 642 475-544 69 2.52 872\nVB08036 299-526 227 1.11 549 312-356 44 1.43 746\n 442-509 67 2.07 747\nVB08037 193-245 52 1.54 705 202-234 32 2.00 770\n 485-601 116 1.37 602\n\n\nFour holes intersected continuous mineralization over 100 meters in\nlength, with hole VB08032 intersecting over 300 meters of continuous\nmineralization. The same four holes also contained significant (32 to 79\nmeters) interva...