Business
Callinex Announces Commencement of 2024 Exploration Campaign at the Pine Bay Project Located in the Flin Flon Mining District, MB
Callinex Announces Commencement of 2024 Exploration Campaign at the Pine Bay Project Located in t...

About this update from Visionary Copper And Gold Mines Inc.
[{"type":"text","content":"\n\n\n\n Callinex Announces Commencement of 2024 Exploration Campaign at the Pine Bay Project Located in the Flin Flon Mining District, MB\n \n\n /* Style Definitions */\nspan.prnews_span\n{\nfont-size:8pt;\nfont-family:\"Arial\";\ncolor:black;\n}\na.prnews_a\n{\ncolor:blue;\n}\nli.prnews_li\n{\nfont-size:8pt;\nfont-family:\"Arial\";\ncolor:black;\n}\np.prnews_p\n{\nfont-size:0.62em;\nfont-family:\"Arial\";\ncolor:black;\nmargin:0in;\n}\n \n\n\n\n\n\n Canada NewsWire\n \n\n\n\n\n\n VANCOUVER, BC\n \n\n ,\n \n\n Sept. 3, 2024\n \n\n /CNW/ -\n \n Callinex Mines Inc.\n \n (the \"Company\" or \"Callinex\") (TSXV: CNX) (OTCQX: CLLXF) is pleased to announce that it has commenced the fully funded 2024 exploration campaign at the 100% owned Pine Bay Project (the \"Project\") located within the Flin Flon Mining District of\n \n Manitoba\n \n (\n \n Figure 1: Flin Flon District Overview\n \n ). The recently consolidated Project area encompasses 11,859 hectares (approximately 120 square km) and benefits from a mineral lease, water, hydroelectric power, historic shaft and direct road access to an idle processing facility in\n \n Flin Flon, MB\n \n , located 16km away.\n \n\n\n\n\n\n\n\n\n The\n \n 5,000m\n \n drilling campaign has begun with testing of target area Poseidon with plans for a step-out drill hole to be completed on the Descendent discovery (\n \n Figure 2: Pine Bay Project Plan View with 2024 Exploration Targets\n \n ). While any necessary borehole electromagnetic surveys are completed at Poseidon and Descendent the campaign will move on to Odin and Ra, two previously announced target areas (\n \n See news release dated\n \n May 22, 2024\n \n\n ).\n \n\n\n\n\n\n\n\n\n\n Max Porterfield\n \n , President and CEO, stated, \"We are excited to follow-up on our recent Descendent discovery and the target areas that our team has outlined.\" Mr. Porterfield continued, \"Each target area being drill tested has the potential to significantly expand upon the high-grade copper resource that's defined at the Pine Bay Project.\"\n \n\n Drilling has commenced on a\n \n 500m\n \n drill hole to test target area Posiedon, which is located 1,300 meters along strike to the north of the Rainbow deposit (see Figure 2). This area was covered by the recent MT survey on the Descendent line. The MT survey data outlined a very large resistivity low anomal...