Business

Visible Gold Mines provides update on its winter diamond drilling program

Visible Gold Mines provides update on its winter diamond drilling program Visible ...

articleVisible Gold Mines Inc.May 5, 20165/company/visible-gold-mines-inc/news/visible-gold-mines-provides-update-on-its-winter-diamond-drilling-program
Visible Gold Mines provides update on its winter diamond drilling program

About this update from Visible Gold Mines Inc.

[{"type":"text","content":"\n\n\n\nVisible Gold Mines provides update on its winter diamond drilling program\n\n/* Style Definitions */\nspan.prnews_span\n{\nfont-size:8pt;\nfont-family:\"Arial\";\ncolor:black;\n}\na.prnews_a\n{\ncolor:blue;\n}\nli.prnews_li\n{\nfont-size:8pt;\nfont-family:\"Arial\";\ncolor:black;\n}\np.prnews_p\n{\nfont-size:0.62em;\nfont-family:\"Arial\";\ncolor:black;\nmargin:0in;\n}\n.prngen2{\nBORDER-BOTTOM:black 1pt solid; TEXT-ALIGN: CENTER; BORDER-LEFT:black 1pt solid; PADDING-LEFT:0.50em; PADDING-RIGHT:0.50em; VERTICAL-ALIGN: TOP; BORDER-TOP:black 1pt solid; BORDER-RIGHT:black 1pt solid\n}\n.prntbls{\nBORDER-BOTTOM: black 1px solid; BORDER-LEFT: black 1px solid; BORDER-COLLAPSE: collapse; BORDER-TOP: black 1px solid; BORDER-RIGHT: black 1px solid\n}\n.prntac{\nTEXT-ALIGN: CENTER\n}\n\n\n\n\n\n\nVisible Gold Mines provides update on its winter diamond drilling program\nCanada NewsWire\nROUYN-NORANDA, QC, May 5, 2016\n\n\n\nROUYN-NORANDA, QC, May 5, 2016 /CNW Telbec/ - Visible Gold Mines Inc. (TSXV: VGD) (Frankfurt: 3V4) is pleased to provide an update on the previously-announced winter diamond drilling program on its 167 Project, which was completed at the end of April 2016.  During this three-phase diamond drilling program, Visible Gold Mines drilled twelve diamond drill holes totaling approximately 2,493 metres.\n\nDuring the first phase of the program, Visible Gold Mines drilled five diamond drill holes on the North Block of the 167 Project, totaling approximately 963 metres. Three diamond drill holes were drilled on the Central Block of the 167 Project, totaling approximately 603 metres, during the second phase of the winter diamond drilling program. Although gold values were obtained in the first phase of the winter diamond drilling program (holes 21 to 25) (see press release dated February 3, 2016), no economic value was intercepted in the second phase of the program (holes 26-28).\n\nDuring the third phase of the winter diamond drilling program on the 167 Project, which was recently completed, Visible Gold Mines completed four diamond drill holes on the South Block of the 167 Project, totaling approximately 927 metres, the details of which are as follows: \n\n \n\n\n\n\nDrill HoleNumber\n\n\nLength\n\n(m)\n\n\nZone\n\n\nStatus\n\n\nLogged\n\n\nSamples\n\n(qty)\n\n\nDateShippedto Lab\n\n\n\n167-...

More updates from Visible Gold Mines Inc.