Business

Visible Gold Mines 4,000 kilometers airborne survey 100% completed on its new project in the James Bay region, Québec

ROUYN-NORANDA, QC , Dec. 1, 2014 /CNW Telbec/ - Visible Gold Mines Inc. (TSXV: VGD) (Fra...

articleVisible Gold Mines Inc.December 1, 20143/company/visible-gold-mines-inc/news/visible-gold-mines-4000-kilometers-airborne-survey-100percent-completed-on-its-new-project-in-the-james-bay-region-quandxe9bec
Visible Gold Mines 4,000 kilometers airborne survey 100% completed on its new project in the James Bay region, Québec

About this update from Visible Gold Mines Inc.

[{"type":"text","content":"\n\nROUYN-NORANDA, QC, Dec. 1, 2014 /CNW Telbec/ - Visible Gold Mines Inc. (TSXV: VGD) (Frankfurt: 3V4) is pleased to announce the completion of its previously-announced of detailed helicopter-borne magnetic (MAG) and time-domain electromagnetic (TDEM) Survey on its 167 EXTENSION project in the Plan Nord region in the province of Québec. The survey began on November 13th and was completed recently.\n\nThe MAG-TDEM geophysical survey consisted of a data acquisition program for a total of 3,955 linear kilometres on two different survey block at 100 metre line spacing, see map at http://visiblegoldmines.com/images/Ext167geophysics.jpg. Joël Dubé, Eng., consultant specialized in geophysics, will generate anomaly picking and interpretation maps.  Those products will be key in providing prospective guidance on potential diamond drilling targets. \n\nMost of the high grade boulders we have found are highly magnetics and conductives. With the preliminary data we have received to date, we are able to define in many areas the correlation between conductivity, high magnetism, and high grade boulders' location. We are very anxious to bring the drilrig on site. \"We believe this is a very promising project\" stated Martin Dallaire, President and Chief Executive Officer of Visible Gold Mines.\n\nQualified Persons\n\nMr. Martin Dallaire, P.Eng., President and Chief Executive Officer of Visible Gold Mines, is the qualified person on the 167 EXTENSION exploration project information presented in this press release under National Instrument 43-101 Standards of Disclosure for Mineral Projects, is responsible for the technical contents of this press release and has approved the disclosure of the technical information contained herein.  The data verification was conducted by Jeannot Theberge, P.Geo. under the supervision of Martin Dallaire, P.Eng.  \n\nQuality Control\n\nVisible Gold Mines has implemented and adheres to a strict Quality Assurance/Quality Control for the current exploration program.  It includes one mineralized gold standard, one duplicate and one blank for each batch of samples.  Analyses are performed by ALS Chemex, Val-d'Or, Québec, or Techni-Lab, Ste-Germaine-Boulé, Québec, both accredited laboratories.\n\nAbout Plan Nord 167 EXTENSION project\n\nIn 2011, when the Qu&#xE...

More updates from Visible Gold Mines Inc.