Business

Viscount Mining Drills 113.5 g/t Silver (3.65 oz/t) over 9 meters (29.53 ft) At Its Silver Cliff Property In Colorado

Vancouver, British Columbia--(Newsfile Corp. - February 14, 2018) - Viscount Mining Corp. (TSX...

articleViscount Mining Corp.February 14, 20183/company/viscount-mining-corp/news/viscount-mining-drills-1135-gt-silver-365-ozt-over-9-meters-2953-ft-at-its-silver-cliff-property-in-colorado
Viscount Mining Drills 113.5 g/t Silver (3.65 oz/t) over 9 meters (29.53 ft) At Its Silver Cliff Property In Colorado

About this update from Viscount Mining Corp.

[{"type":"text","content":"Viscount Mining Drills 113.5 g/t Silver (3.65 oz/t) over 9 meters (29.53 ft) At Its Silver Cliff Property In ColoradoVancouver, British Columbia--(Newsfile Corp. - February 14, 2018) - Viscount Mining Corp. (TSXV: VML) (OTCQB: VLMGF) (\"Viscount\" or \"the Company\"), is pleased to announce the fourth set of assay results from the Phase 2 HQ core drilling program at their Silver Cliff property in the Hardscrabble Silver District of Custer County, Colorado (the \"Property\"). The 2017 program commenced in mid-October and completed on December 9th has as its primary objective the verification of historical drill results for current mineral resource estimation on one of the Silver Cliff deposits known as the Kate Silver Resource (the \"KSR\"). This release is reporting values from DDH P17001 and DDH P17003, the sixth and seventh of ten holes.2017 Drill Holes Announced to DateViscount Hole #Historical Hole #From (m)From (ft.)To(m)To(ft.)Length (m)Length (ft.)Ag(oz/t)Ag(g/t)P1700179-02-032478.7433108.27929.533.65113.5P1700179-02-0325.583.6628.593.5039.847.64 237.5P1700279-05_CC0034.5113.234.5113.22.9190.35P1700279-05_CC1239.43098.418593.88120.58P17003SC-091549.22168.88619.681.8858.5P17003SC-0916.554.131859.051.54.922.76 86P1700477 -07_CC619.73912833108.32.8390.35P1700477 -07_CC929.5391283098.53.0795.48P1700477-07 _CC1549.2391282478.83.51109.04P1700688-160024.580.424.580.44.82149.88P1700688_160015.550.915.550.96.56203.90P1700788_320039128391281.3842.85P1700788_321239.42478.71239.32.6582.50P17010RH27_CAL13.544.346.5152.633108.32.5779.53P17010RH27_CAL33108.346.5152.513.544.53.95122.85 Current hole P17001was drilled at -90 degrees and gave the following results: 113.5 g/t (3.65 oz/t) over 9 m (29.53 ft) from 24m (78.74 ft) to 33 m (108.27 ft) including 237.5 g/t (7.64 oz/t) over 3 m (9.84 ft) from 25.5 m (83.66) to 28.5 m (93.54 ft). This hole is notable in that it assessed the less tested northern portion of the Kate deposit. The true thickness of the reported intersection of this hole is estimated at 100%. Current hole P17003 was drilled at -90 degrees and gave the following results: 58.5 g/t (1.88 oz/t) over 6 m (19.7 ft) from15 m (49.2 ft) to 21 m (68.9 ft) that includes 86 g/t (4.92 oz/t) over 1.5 m (4.92 ft) from16.5 m (54.13 ft) to 18 m (59.05 ft). The true thickness of the reported intersection of this hole is estimated at 1...

More updates from Viscount Mining Corp.