Business

Vendetta Mining Corp. Reports Results of Exploration Drilling in Zone 5 at the Pegmont Project, Queensland, Australia

(via Thenewswire.ca) FOR IMMEDIATE RELEASE September 4 rd , 2014 (VTT2014 - NR #4) ...

articleVendetta Mining Corp.September 4, 20143/company/vendetta-mining-corp/news/vendetta-mining-corp-reports-results-of-exploration-drilling-in-zone-5-at-the-pegmont-project-queensland-australia
Vendetta Mining Corp. Reports Results of Exploration Drilling in Zone 5 at the Pegmont Project, Queensland, Australia

About this update from Vendetta Mining Corp.

[{"type":"text","content":"Vendetta Mining Corp. Reports Results of Exploration Drilling in Zone 5 at the Pegmont Project, Queensland, Australia(via Thenewswire.ca)\n \n \nFOR IMMEDIATE RELEASE September 4rd, 2014\n\n\n \n(VTT2014 - NR #4)\n\n \n \nHighlights include: \n\n\n \n\n\n-PMR283: 9 metres of 6.35% Pb, 6.88% Zn \n\n\n\n-PMR290: 9 metres of 5.30% Pb, 3.11% Zn \n\n\n\n-PMR294: 10 metres of 4.77% Pb, 3.91% Zn \n\n\n\n\n \nVancouver, BC / TNW-ACCESSWIRE / September 4th, 2014 / Vendetta Mining Corp. (VTT-TSX:V) (the \"Company\") is pleased to report results of the recent exploration drilling undertaken by Pegmont Mines Limited (the \"Vendor\").\n\n\n \nDuring the closing period of the option agreement, a total of 13 reverse circulation (\"RC\") drill holes for 2,977 metres were completed on the property by the Vendor. Of these, eight were drilled in Zone 5, one in Zone 4, and four were drilled on regional targets. This was undertaken to meet minimum Queensland Government expenditure commitments. The costs incurred by the Vendor for this program have been reimbursed by the Company. \n\n\n \nResults of this RC program have been provided to the Company and also reported by the Vendor. The Company is in the process of completing its quality control checks (\"QA/QC\") on the drilling and assaying, which includes the submission of certain samples for check assay at a second laboratory. Until these QA/QC checks have been performed, the Company cautions that the results cannot be relied upon. The results as supplied by the Vendor are tabulated in Table 1 and drill hole locations are illustrated on a map below.\n\n\n \nZone 5 at Pegmont is not included in the current Mineral Resource estimate but does form part of the exploration potential at Pegmont (see \"Technical Report Pegmont Property Mineral Resource Estimate\" AMC Mining Consultants (Canada) Ltd., effective date of 28 February 2014). \n\n\n \nThe results summarized in Table 1 are for intersections equal to or greater than 1 metre at 1% lead plus zinc. While the intervals in the table are intersected widths, it is anticipated that the true widths would be 80-90% of those shown. \n\n\n \nThe Company is currently completing plans and preparing its initial exploration program for 2014. This will focus on exploration drilling in Zone 5. Details will be announced in due course.\n\n \n \nTable 1. Summary of R...

More updates from Vendetta Mining Corp.